Normes relatives aux risques énergétiques
Electricity and fuel systems are the infrastructure on which every other sector depends, and they are being rebuilt during the energy transition while exposure to heat, storms, drought and cyber attack rises. This area of the Energy and Critical Infrastructure programme defines records for assets, outages, supply adequacy and transition risk so that grid operators, regulators and investors can trace a cascade from a hazard to an outage to dependent services with evidence that is comparable across systems and borders. Each artefact of the area carries a UNI (Unique Nexus Identifier).
- Nexus Standards: NS-0, NS-1, NS-3, NS-9, NS-10, NS-11.
- Open standards: OGC API – Features; NGFS climate scenarios; NIST Cybersecurity Framework 2.0; Recommendations of the Task Force on Climate-related Financial Disclosures; GHG Protocol Corporate Accounting and Reporting Standard.
- Données et flux : Global Power Plant Database ; éclairage nocturne NASA Black Marble (VNP46) ; données d'Ember sur l'électricité ; ENTSO-E Transparency Platform ; API EIA Open Data.
- Associé à : eau ; infrastructures critiques et entités critiques ; climat ; météorologie de l'espace, spectre et synchronisation.
Synthèse
- 01PérimètreChamp d'application et limites
- 02Couplages systémiquesCanaux de transmission vers les domaines et programmes connexes
- 03Couplages systémiquesCouplages systémiques
- 04Modèle de systèmeComment un choc se propage dans ce système
- 05Aléas et secteursAléas, menaces et secteurs concernés
- 06Normes ouvertesNormes ouvertes référencées
- 07Sources de donnéesSources de données
- 08IndicateursIndicateurs
- Nexus Standards
- 6
- NS-0, NS-1, NS-3
- Normes ouvertes
- 5
- nommées, jamais copiées
- Données et flux
- 5
- cité pour référence
- Couplages
- 4
- avec d'autres domaines
- Statut
- Proposéau catalogue · prévu · périmètre NET
- Dernier examen
- profil de domaine
Nexus Standards (2026). Normes relatives aux risques énergétiques : note de domaine, programme Énergie et infrastructures critiques. Proposé. https://nexustandards.com/energy-infrastructure/energy-risk-standards/ · UNI NXS-STD-DC-000003. Dernière révision le 17 octobre 2026.
Les fichiers comprennent les crédits et la mention de licence et sont générés dans le navigateur ; aucune donnée n'est transmise. Les téléchargements nécessitent JavaScript.
Champ d'application et limites
Un domaine du programme Énergie et infrastructures critiques Climat et Terre (domaines). Le profil du domaine énonce 5 questions relevant de son champ et 3 questions traitées par d'autres domaines.
Dans le périmètre 5
- Enregistrements des actifs de production, de transport et de distribution avec leur localisation et leur exposition aux aléas
- Enregistrements des événements de panne et de rétablissement avec leur cause et les clients touchés
- Indicateurs d'adéquation de l'approvisionnement et de sécurité des combustibles
- Enregistrements du risque de transition (exposition aux actifs échoués, scénarios de politique)
- Enregistrements des dépendances intersectorielles pour l'analyse des cascades
Hors périmètre 3
- Règles du marché de l'électricité et formation des prix
- Normes de sécurité des équipements et codes de réseau
- Données commerciales de négociation
Juridictions L'application dans chaque juridiction est une décision nationale, prise par le National Standards Council (NSC) avec les autorités nationales compétentes.
Canaux de transmission vers les domaines et programmes connexes
Les couplages systémiques consignés pour ce contexte, regroupés par mécanisme de transmission. La barre résume chaque mécanisme (sélectionnez-en un pour filtrer) ; chaque entrée nomme le domaine ou le programme connecté et décrit le mécanisme.
La vue interactive nécessite JavaScript ; les sections ci-dessous présentent les mêmes fiches.
Cascades à travers les systèmes couplés
A shock such as heatwaves and demand peaks is observed through Global Power Plant Database; its effect on energy is recorded and propagated to Water risk standards and Critical infrastructure and critical entities through recorded couplings; cascade obligations are evaluated as clauses; indicators such as SDG 7.1.1 are computed from the records. 7 operations in 5 phases, built from the area profile: the rows carry its own data sources, indicators, open standards, couplings and, where listed, hazards, and each operation names the rules it implements (11). Records and artefacts are cited by UNI (Unique Nexus Identifier) and version.
Explorateur de processus · Standards · codifier et corriger
Cycle de vie d'une norme
17 étapes·6 étapes
Normes · codifier et corriger
Cycle de vie d'une norme
Cycle de vie d'une norme · Parcours NS-13 · Canaux de contribution · Parcours IETF · Parcours W3C · Parcours OGC · Parcours OASIS · Étapes ISO et IEC · Conformité · Cycle de vie des fiches · Acheminement · Suivi.
Les conclusions du cycle deviennent des propositions de changement, le Global Standards Council les adopte après un dernier appel public, et chaque pays décide de sa propre adoption.
01 Orienter les missions
- 01Route missions to standards and profilesStep · Nexus StandardsNexus Standards routes each candidate mission to the standards and profiles that apply.
02 Profils et conformité
- 02Composer les profils de missionÉtape · Nexus StandardsNexus Standards compose les profils de mission et consigne toute adoption nationale dont dépendent les missions.
- 03Valider les résultats de construction au regard des profilsÉtape · Nexus StandardsNexus Standards valide les résultats de construction au regard des profils composés et consigne les preuves.
- 04Surveiller la conformité et consigner des preuves scelléesÉtape · Nexus StandardsPendant l’Action Week, Nexus Standards surveille la conformité et consigne les écarts.
03 Propositions et examen
- 05Les écarts et les corrections deviennent des propositions de modificationÉtape · Nexus StandardsLes écarts deviennent des propositions de modification, et la correction est consignée comme une modification des preuves.
- 06Les constats du cycle deviennent des propositions de modificationÉtape · Nexus StandardsLes constats d'un cycle deviennent des propositions de modification : constats de méthode et de correction issus des Rapports (F06) et points inscrits au registre de Nexus…
- 07Rédiger et réviser en publicÉtape · Comités et groupes de travailLes comités techniques et les groupes de travail rédigent et révisent les normes selon le processus ouvert de NS-13.
- 08Examen en vue d'une décision du ConseilÉtape · Nexus StandardsNexus Standards fait progresser les propositions de modification dans l'examen en vue d'une décision du Conseil.
04 Décision du Conseil
- 09Appel final publicÉtape · Conseil mondial des normesLe Conseil mondial des normes adopte à la majorité des deux tiers après un dernier appel de quatre-vingt-dix jours.
- 10Adoption mondiale d'une normeDécision · Conseil mondial des normesLe Global Standards Council décide de l’adoption de chaque norme après le dernier appel public.
05 Publier et identifier
- 11Attribuer un UNI et publierÉtape · Secrétariat (GCRI Canada)Nexus Standards attribue les UNI et dépose les publications selon la procédure de l'éditeur.
- 12Un UNI identifie et ne certifie jamaisRegistre · Nexus StandardsChaque objet de l’année du programme porte un identifiant, un UNI selon NS-1, afin de pouvoir être cité, versionné et résolu.
- 13Publier les modifications adoptées de l'annéeÉtape · Nexus StandardsLors du renouvellement, Nexus Standards publie les modifications adoptées de l'année et l'état de l'adoption nationale.
06 Adoption et application nationales
- 14Adoption nationale par le Conseil national des normesDécision · Conseil national des normesLe Conseil national de normalisation de chaque pays décide de l'adoption nationale : adoption telle quelle, adoption avec un profil (NS-16), adaptation ou simple référence.
- 15Les normes adoptées rejoignent les cours et les éditionsÉtape · Nexus StandardsChaque norme ou profil adopté devient un module de cours dans Risk Academy (F09), et les normes sont appliquées dans les éditions des Rapports (R1).
- 16L'adoption est définitive pour chaque juridictionNorme · Conseil national de normalisationL'adoption est définitive pour chaque juridiction, et le GSC ne dispose d'aucun veto sur une décision nationale. Aucun organe mondial ne détient de veto.
- 17Registres d'adoption nationaleRegistre · Nexus StandardsLes profils de mission composés et les registres d’adoption nationale sont transmis à la Foundry lors de la préparation (F08).
Nexus Standards · Nexus Standards (institution) · National Standards CouncilAn outline of the designed programme cycle, not a record of operation: no cycle has run and every programme is at service level R0. Every Nexus Standard is at the PROPOSED stage and nexustandards.com governs the text and status of each one. A UNI identifies and never certifies; a validator report is evidence for review, not a conformance claim.
Les opérations, sous forme de tableau
| Étape | Phase | Fonctionnement | Qui | Règle de décision | Fiche | Met en œuvre |
|---|---|---|---|---|---|---|
| 01 | Choc | Choc observé (début). Aléas et menaces dans le périmètre : vagues de chaleur et pics de demande, tempêtes de vent et tempêtes de verglas, sécheresse affectant l'hydroélectricité et le refroidissement, perturbation géomagnétique et cyberattaque contre les technologies opérationnelles. | l'agence d'observation | les observations sont des enregistrements accompagnés de leurs versions sources | observations des vagues de chaleur et des pics de demande issues de la Global Power Plant Database | NS1-R2 |
| 02 | Système | État du système (enregistrement). Dans le périmètre : enregistrements des actifs de production, de transport et de distribution avec leur localisation et leur exposition aux aléas, enregistrements des événements de panne et de rétablissement avec leur cause et les clients touchés, et indicateurs d'adéquation de l'approvisionnement et de sécurité des combustibles. | le gestionnaire du réseau | les enregistrements de système portent des UNI et des versions | Enregistrements des actifs de production, de transport et de distribution avec leur localisation et leur exposition aux aléas | NS1-R1 |
| 03 | Système | Modèle d'impact (modèle). L'incertitude est indiquée lorsqu'elle existe. | l'équipe de modélisation | les modèles sont assortis d'une fiche de modèle et citent leurs intrants par leur UNI | estimation d'impact utilisant comme donnée d'entrée l'éclairage nocturne NASA Black Marble (VNP46) | NS12-R2, NS5-R3 |
| 04 | Couplage | Système couplé (étape). Couplages de ce domaine : normes relatives aux risques liés à l'eau, infrastructures critiques et entités critiques, normes relatives aux risques climatiques, et normes relatives aux risques de météorologie spatiale, de spectre et de synchronisation temporelle. | le programme Normes relatives aux risques liés à l'eau | les couplages sont des relations enregistrées, étayées par des données probantes | Facteur commun : la sécheresse réduit la production hydroélectrique et limite le refroidissement thermique ; les défaillances du réseau électrique arrêtent le pompage et le traitement de l'eau. | NS0-P9, NS15-R11 |
| 05 | Couplage | Deuxième système (étape). Chaque étape de la cascade cite les enregistrements sur lesquels elle repose. | le programme Infrastructures critiques et entités critiques | les relations contestées sont présentées comme contestées | Cascade : la perte d'alimentation électrique se propage aux télécommunications, à la santé, aux transports et à la finance à travers des réseaux interdépendants. | NS15-R13 |
| 06 | Obligations | Clauses de cascade (porte). Nexus Standards de ce domaine : NS-0, NS-1, NS-3, NS-9, NS-10, NS-11. | un évaluateur doté d'un mandat | l'interdépendance entre domaines est traitée explicitement | attestations des obligations en cascade rédigées sous forme de clauses NS-10 | NS0-P9, NS10-R1, NS11-R1 |
| 07 | Indicateurs | ODD 7.1.1 (fin). Indicateurs de ce domaine : ODD 7.1.1 (Proportion de la population ayant accès à l'électricité), ODD 7.2.1 (Part de l'énergie renouvelable dans la consommation finale totale d'énergie) et Sendai Monitor D-5 (Nombre de perturbations des services de base attribuées aux catastrophes). | offices nationaux de statistique et organismes responsables | les indicateurs sont calculés à partir des enregistrements et les citent | ODD 7.1.1 (Proportion de la population ayant accès à l'électricité) | NS11-R5, NS14-R1 |
Table.Operations in walking order; each row names the phase, the operation, its actor, its decision rule, the record it leaves and the rule identifiers it implements. The table shows the process as specified; it does not report the status of any standard, proposal or record. Sources: OGC API – Features · NGFS climate scenarios · NS-0: Constitution and principles · NS-1: The UNI and the artefact catalogue.
Les secteurs que les normes de risque énergétique doivent décrire.
Les secteurs relevant des normes relatives aux risques énergétiques et les relations que ses clauses explicitent, afin que les enregistrements de différents secteurs soient interopérables.
Signature
L'énergie et ses partenaires
L'énergie fournit l'électricité pour les transports et les télécoms aux infrastructures (0.8), le pompage et le traitement à l'eau (0.5) et les engrais, les machines et les chaînes du froid à l'alimentation (0.5).
W · E · I · F · H · B.
- Secteurs
- 4 sur 6
- Relations
- 6 sur 15
- Couplage
- 0.46 part du total
Relations les plus fortes en jeu
- Énergie → Infrastructures · électricité pour les transports et les télécoms0.8
- Eau → Énergie · eau de refroidissement et hydroélectricité0.6
- Water → Food · irrigation0.8
- Infrastructures → Eau · canalisations, barrages et stations de traitement0.6
Couplages systémiques
4 couplages relient ce domaine à d'autres domaines et programmes, chacun avec le mécanisme du lien.
- Normes sur les risques liés à l'eauEau et alimentation systèmesFacteur commun : la sécheresse réduit la production hydroélectrique et limite le refroidissement thermique ; les défaillances du réseau électrique arrêtent le pompage et le traitement de l'eau.
- Infrastructures critiques et entités critiquesÉnergie et infrastructures critiquesCascade : la perte d'alimentation électrique se propage aux télécommunications, à la santé, aux transports et à la finance à travers des réseaux interdépendants.
- Normes sur les risques climatiquesClimat et systèmes terrestresRétroaction : les politiques de transition modifient la valeur des actifs et les bouquets de combustibles, tandis que le changement climatique physique modifie les pics de demande et la fiabilité de l'approvisionnement.
- Normes sur les risques de météorologie de l'espace, de spectre et de synchronisationAléas et réduction des risques de catastropheFacteur commun : les orages géomagnétiques induisent des courants qui endommagent les transformateurs et perturbent la synchronisation GNSS utilisée pour la synchronisation des réseaux électriques.
Comment un choc se propage dans ce système
A system model of this area built from the registry: 18 hazards, 5 systems, 4 sectors, 12 controls, 5 feeds, 4 indicators. Select the components to include, choose an initiating hazard and run the scenario. Stress propagates through the hazard relations of the Nexus Hazard Standard (NHS-1), the exposure of each system, the recorded couplings and the sectors that carry the loss; adopted standards dampen transmission and live data sources support detection. All parameters are stated assumptions that the reader can adjust; results are illustrative scenario outputs for exercises and training, not forecasts or risk assessments. The Map view places the same run on an example geography, Europe, the region of the programme’s context map, with open data: country boundaries, a grid of hexagonal cells and NASA satellite layers for the initiating hazard. The geography serves exercises and training and is not an assessment of that place.
Aléas
- Vague de chaleur
- Tempête de vent
- Panne d'électricité généralisée (déclenchée en aval)
- Perturbation forestière de grande ampleur (déclenchée en aval)
- Feux de forêt (déclenchée en aval)
- Conditions météorologiques propices aux incendies extrêmes (déclenchées en aval)
- Tension du réseau électrique liée à la chaleur (déclenchée en aval)
- Sécheresse agricole (déclenchée en aval)
- Sécheresse éclair (déclenchée en aval)
- Sécheresse nivale (déclenchée en aval)
- Épisode d'ozone troposphérique (déclenché en aval)
- Sécheresse météorologique (déclenchée en aval)
- Chaleur nocturne extrême (déclenchée en aval)
- Vague de chaleur lacustre et fluviale (déclenchée en aval)
- Limitation du refroidissement par eau des centrales électriques (déclenchée en aval)
- Déformation des voies due à la chaleur (déclenchée en aval)
- Poussée glacielle sur le rivage (déclenchée en aval)
- Seiche (déclenchée en aval)
Systèmes et couplages
Commandes
NS-0Constitution et principesNS-1L’UNI et le catalogue des artefacts (grammaire v0.2 : segments domaine, secteur, région et environnement)NS-3UNI de fiches de risque (grammaire, correspondance avec l'existant, autorité d'attribution)NS-9UNI contextuels (déploiements, instances, instances de programme)NS-10Politiques et clauses (obligations lisibles par machine : définition, caractère contraignant, évaluation et application)NS-11Vérification et suivi (preuves, attestations, observation de la conformité en confiance zéro)NRS-H84Famille d'aléas : instabilité et déficit du système énergétique (NHS-1 infra.energy)NRS-H61Famille d'aléas : défaillance en cascade (NHS-1 sys.cascade)NRS-U8Profil de plateforme Universe : Energy NexusNRS-H48Famille d'aléas : panne de réseau de services publics et de communication (NHS-1 infra.utilities)NRS-H109Famille d'aléas : défaillances des technologies de la transition énergétique (NHS-1 tech.energy-transition)NRS-H54Famille d'aléas : perturbation des signaux et des plateformes (NHS-1 cyber.platform)
Observation
- Global Power Plant Database (indiqué pour référence)
- Lumières nocturnes NASA Black Marble (VNP46) (indiquées pour référence)
- Données d'électricité Ember (citées pour référence)
- Plateforme de transparence ENTSO-E (indiquée pour référence)
- API Open Data de l'EIA (indiquée pour référence)
- Proportion de la population ayant accès à l'électricité
- Part des énergies renouvelables dans la consommation finale totale d'énergie
- Nombre de perturbations des services de base attribuées aux catastrophes
- Dommages aux infrastructures critiques attribués aux catastrophes
Géographie d'exemple
- Europe : 113 cellules hexagonales
- Température de l'air en surface, de jour (AIRS), NASA GIBS
- Intensité des précipitations, dernière demi-heure (IMERG), NASA GIBS
- Lumières nocturnes de ce soir, pannes (VIIRS Day/Night Band), NASA GIBS
- Alertes de perturbation de la végétation, 30 m (OPERA DIST-ALERT), NASA GIBS
Aléas, menaces et secteurs concernés
Aléas et menaces 6
Secteurs 4
Normes ouvertes référencées
5 normes ouvertes, chacune avec sa relation telle qu'enregistrée dans le registre au titre de la NS-14. Survolez une relation ou placez-y le focus pour en afficher la définition.
Sources de données
5 sources de données nommées dans le profil du domaine, chacune avec son fournisseur, sa licence, sa fréquence de mise à jour et son mode de livraison.
Les sources de données sont citées pour référence ; les données en direct sont affichées une fois l'examen des licences terminé.
- En direct
- 0
- à l'issue de l'examen de la licence
- Inscrit au registre des données
- 2
- conditions de licence enregistrées
- Proposé pour le registre
- 3
- conditions de licence à consigner
- Mode de dispensation
- 2 service gouverné · 0 module d'extension · 0 navigateur · 2 instantané · 1 cité pour référence
- modes proposés par ordre de préférence : service de données gouverné, extension, lecture directe par le navigateur, instantané au moment de la compilation ; les sources dont les conditions ne permettent pas la réutilisation sont répertoriées à titre de référence uniquement
Global Power Plant Databasefor reference
World Resources Institute · version statique (v1.3.0)
CC BY 4.0
service de données gouvernérépertorié dans le registre des données.
Lumières nocturnes NASA Black Marble (VNP46)pour référence.
NASA Goddard / LAADS DAAC · quotidien
Politique de la NASA en matière de données et d'informations sur les sciences de la Terre (ouverte)
service de données gouvernérépertorié dans le registre des données.
EIA Open Data APIfor reference
U.S. Energy Information Administration · hourly to annual.
Œuvre du gouvernement des États-Unis, domaine public
instantané au moment de la compilationproposé pour le registre de données
Données d'Ember sur l'électricitépour référence
Ember · mensuel
CC BY 4.0
instantané au moment de la compilationproposé pour le registre de données
ENTSO-E Transparency Platformfor reference
ENTSO-E · horaire
ENTSO-E transparency terms and conditions; licence to be recorded by Legal.
cité pour référenceproposé pour le registre de données.
Indicateurs
Le profil du domaine nomme 4 indicateurs, chacun avec son cadre et son code.
Les noms et codes des indicateurs sont donnés tels que publiés par leurs garants.
Profils de compatibilité à accès restreint
3 normes dont le texte n'est pas librement accessible, seulement nommées et assorties d'un lien. Tout profil de compatibilité est conservé sur des pages protégées jusqu'à la conclusion d'un accord avec l'organisme émetteur.
- IEC 62443 series Security for industrial automation and control systemsIEC TC 65compatibility profile (restricted)
- NERC Critical Infrastructure Protection Reliability StandardsNorth American Electric Reliability Corporationcompatibility profile (restricted)
- ISO 55000:2024 Asset management – Vocabulary, overview and principlesISO/TC 251compatibility profile (restricted)
Normes qui s'appliquent
The area profile lists 6 Nexus Standards; the registry lists NS-0, NS-1, NS-3, NS-9, NS-10, NS-11 for this area. Each is a proposed standard under development.
- 01
NS-0 · Constitution et principes
Status: proposed · 12 requirements stated. Read NS-0 · Requirements for this area.
- 02
NS-1 · The UNI and the artefact catalogue (grammar v0.2: domain, sector, region and environment segments)
Status: proposed · 10 requirements stated. Read NS-1 · Requirements for this area.
- 03
NS-3 · UNI des enregistrements de risque (grammaire, correspondance avec l'existant, autorité d'attribution)
Status: proposed · 0 requirements stated. Read NS-3 · Requirements for this area.
- 04
NS-9 · UNI contextuels (déploiements, instances, instances de programme)
Status: proposed · 5 requirements stated. Read NS-9 · Requirements for this area.
- 05
NS-10 · Policies and clauses (machine-readable obligations: definition, binding, evaluation and enforcement)
Status: proposed · 7 requirements stated. Read NS-10 · Requirements for this area.
- 06
NS-11 · Vérification et surveillance (données probantes, attestations, observation de la conformité « zéro confiance »)
Status: proposed · 6 requirements stated. Read NS-11 · Requirements for this area.
Filières des données probantes, de la reconnaissance et des capitaux
Ce que chaque institution de l'écosystème tire de ce domaine : le Global Centre for Risk and Innovation (GCRI Canada), en tant que Secrétariat, pour les données probantes ; le Global Risks Forum (GRF) pour la reconnaissance ; et la Global Risks Alliance (GRA) pour le capital.
GCRI Canada
GCRI Canada peut traiter les enregistrements des pannes et de l'exposition des actifs, assortis des versions des sources et de l'historique des corrections, comme données probantes pour la recherche sur les cascades ; la décision appartient à GCRI Canada, selon ses propres règles en matière de données probantes et de recherche.
Le Global Risks Forum (GRF)
Le GRF peut consigner comme point de dialogue transfrontière les gestionnaires de réseau et les régulateurs qui adoptent le profil d'enregistrement des pannes ; la décision revient au GRF selon ses propres règles de reconnaissance.
La Global Risks Alliance (GRA)
La GRA peut utiliser les enregistrements de risque de transition et d'exposition physique lorsqu'elle examine des portefeuilles de projets énergétiques ; la décision revient à la GRA selon ses propres règles de maturité en matière de capitaux.
Chaque institution détermine selon ses propres règles ce qu'elle accepte comme données probantes ; une lecture de parcours ne constitue ni une approbation ni un conseil en investissement.
Outils d'acheminement, de suivi et de vérification
Console de suivi
Version et statut des sources pour chaque norme, tels que publiés par les organismes émetteurs.
Disponible · s'exécute dans le navigateurConsole d'acheminement
Select a sector, hazard family, capability and artefact type; the registry identifies the applicable standards and states the reasons.
Disponible · brouillon dans le navigateurCompositeur de profil
Combiner des normes et des clauses en un projet de profil assorti de citations, en YAML ou en JSON ; rien n'est soumis.
Chaque console effectue ses calculs à partir du registre et expose son raisonnement ; les décisions restent du ressort des organes compétents.
Charte du groupe de travail
Une charte proposée pour ce domaine, ouverte aux institutions et aux experts.
Enregistrements des pannes, de l'exposition des actifs et du risque de transition, et graphe des dépendances reliant l'énergie aux autres services critiques.
Institutions and experts are invited to charter this working group under NS-13 by filing a public change record. National Working Groups (NWGs) contribute national inputs and field exercises through their National Nexus Consortium (NNC).
- Profil d'enregistrement des événements de panne avec codes de cause et chronologie du rétablissement
- Schéma de graphe des dépendances énergétiques pour les contextes NS-9
- Correspondance des familles de contrôles de cybersécurité et de fiabilité (seulement nommées, aucun texte reproduit)
- Technology Collaboration Programmes de l'AIE liaison recherchée
- ENTSO-E liaison recherchée
- IRENA liaison recherchée
- Programme d'assistance à la gestion du secteur énergétique de la Banque mondiale liaison recherchée
Utilisateurs visés
Le profil du domaine identifie 4 communautés d'utilisateurs.
- Gestionnaires de réseaux de transport et de distribution
- Régulateurs de l'énergie
- Analystes des risques climatiques et de risque de transition dans la finance
- Planificateurs de la protection civile
Questions de recherche ouvertes
3 questions désignées comme prioritaires pour le groupe de travail.
- Les données sur les pannes sont souvent commercialement sensibles ou détenues par des opérateurs privés ; les lumières nocturnes constituent un indicateur indirect présentant des biais connus en cas de couverture nuageuse et dans les zones de faible densité.
- Aucune taxonomie commune des causes ne permet de rapprocher les causes météorologiques, matérielles et cyber entre juridictions.
- Les scénarios de transition (NGFS, AIE) ne sont pas conçus pour une désagrégation au niveau des actifs, de sorte que le risque de transition au niveau des actifs repose sur des hypothèses qui doivent être énoncées.
Inscription au registre et pages de fond
Ce domaine figure au catalogue (statut : prévu ; périmètre NET ; 4 domaines de correspondance). Il comporte cinq pages d'approfondissement et une correspondance de ses domaines avec le registre.
Normes qui s'appliquent
Les règles de chaque norme répertoriée, consultées au moyen du lecteur de spécifications.
Approfondissement · CorrespondanceCorrespondances
Every register entry in the area’s domains, by relation, with the crosswalk graph.
Fond · Enregistrements et schémasEnregistrements et schémas
Périmètre, enregistrement, explorateur de schémas et mode de résolution d'un UNI.
Profondeur · ConformitéConformité
Clauses, données probantes et attestations pour l'évaluation de la conformité.
Fond · MaturitéPréparation
Le domaine en regard des trois parcours, sous forme de matrice.
La table de correspondances : 48 normes externes par domaine
Nexus Standards dans le graphe : NS-0, NS-1, NS-3, NS-9, NS-10, NS-11. Une relation est une entrée de registre, jamais une déclaration de conformité.
6 Nexus Standards · 4 domaines · 48 normes externes · 33 organismes émetteurs · 0 référentiels de mise en œuvre. Les relations (adoption, profil, correspondance, citation) sont telles qu'enregistrées dans le registre ; les noms et les normes restent la propriété de leurs gestionnaires.
Crosswalk graph91 nodes and 120 links from the registry of external standards, programme areas and implementations (the external standards register, the consumers register. Relations (adopt, profile, crosswalk, cite) are shown as recorded in the register.
Areas carry no geography of their own; the map shows where the bodies that issue the area’s external standards are based.
Organismes émetteurs et leurs sièges (27)
| Organisme | Siège | Entrées du registre |
|---|---|---|
| NIST | Gaithersburg, Maryland, États-Unis | 7 |
| ISO/IEC JTC 1/SC 27 | Genève, Suisse | 3 |
| GHG Protocol | Washington, district de Columbia, États-Unis | 2 |
| IEC TC 57 | Genève, Suisse | 2 |
| IEC TC 65 | Genève, Suisse | 2 |
| ISO/TC 207/SC 7 | Genève, Suisse | 2 |
| ISO/TC 268 | Genève, Suisse | 2 |
| ISO/TC 299 | Genève, Suisse | 2 |
| Comité technique OASIS sur le renseignement sur les cybermenaces | Woburn, Massachusetts, États-Unis | 2 |
| Centre commun de recherche de la Commission européenne | Ispra, Italie | 1 |
| Parlement européen et Conseil | Bruxelles, Belgique | 1 |
| FIRST CVSS Special Interest Group | Cary, Caroline du Nord, États-Unis | 1 |
| IEC TC 65 avec l'ISA (ISA/IEC 62443) | Genève, Suisse | 1 |
| IEEE | Piscataway, New Jersey, États-Unis | 1 |
| IETF | Wilmington, Delaware, États-Unis | 1 |
| Groupe d'experts intergouvernemental sur l'évolution du climat | Genève, Suisse | 1 |
| Conseil des normes internationales d'information sur la durabilité (Fondation IFRS) | Francfort, Allemagne | 1 |
| ISO/IEC JTC 1/SC 39 | Genève, Suisse | 1 |
| ISO/TC 251 | Genève, Suisse | 1 |
| ISO/TC 301 | Genève, Suisse | 1 |
| ISO/TC 59/SC 13 | Genève, Suisse | 1 |
| ITU-R | Genève, Suisse | 1 |
| ITU-T SG15 | Genève, Suisse | 1 |
| Réseau pour le verdissement du système financier | Paris, France | 1 |
| North American Electric Reliability Corporation | Atlanta, Géorgie, États-Unis | 1 |
| Science Based Targets initiative | Londres, Royaume-Uni | 1 |
| World Resources Institute et WBCSD (GHG Protocol) | Washington, district de Columbia, États-Unis | 1 |
Issuing bodies are shown at the city of their public seat. The 1 programmes, 0 implementing repositories and 19 Nexus Standards have no location and are not mapped · 6 issuing bodies have no single public seat and are listed without a location: IOC-UNESCO Global Ocean Observing System; UNFCCC; International Atomic Energy Agency; International Civil Aviation Organization; International Maritime Organization; United Nations General Assembly.
Globe des normes27 organismes émetteurs disposant d'un siège public et 48 entrées de registre, représentés en cellules d'aire égale sur quatre niveaux de détail. Les sièges sont placés aux coordonnées des villes ; les domaines de programme, les mises en œuvre et les normes n'ont pas de localisation et ne sont pas représentés. Une carte du monde fixe s'affiche lorsque les scripts ne sont pas disponibles.
| Domaine sur les sites institutionnels | Artefact kinds | Normes applicables | Pages |
|---|---|---|---|
| Énergie (passerelle de terrain de GCRI Canada ; homologues du GRF et de la GRA) | données, jeu de données, rapport, carte, documentation | NS-1, NS-3, NS-3b, NS-4, NS-5 | therisk.global/fields/energy/ |
| Insécurité alimentaire, hydrique et énergétique; instabilité des réseaux électriques | data, dataset, model, map, report | NS-1, NS-3, NS-3b, NS-5 | therisk.global/challenges/ |
D'après le registre de couverture de l'écosystème : les contenus que GCRI Canada, The Global Risks Forum (GRF) et The Global Risks Alliance (GRA) publient sur ce domaine, tels que déclarés par chaque institution.
Sources
4 references from peer-reviewed and official publications cited in the area profile, linked at the publishers’ own sites.
peer-reviewedInfluence of extreme weather and climate change on the resilience of power systems: Impacts and possible mitigation strategiesElectric Power Systems Research · 2015peer-reviewedCatastrophic cascade of failures in interdependent networksNature · 2010peer-reviewedIdentifying, understanding, and analysing critical infrastructure interdependenciesIEEE Control Systems Magazine · 2001- officielChangement climatique 2022 : Atténuation du changement climatique (Groupe de travail III, AR6)Groupe d'experts intergouvernemental sur l'évolution du climat · 2022
Recherches récentes sur ce domaine
Articles récents évalués par les pairs, prépublications, jeux de données et rapports portant sur l'objet de ce domaine, extraits au moment de la consultation de services ouverts de métadonnées scientifiques (OpenAlex, Crossref, DataCite, Zenodo, arXiv, Europe PMC, OpenAIRE Graph) à l'aide de termes de recherche composés à partir du registre. Chaque travail est présenté avec ses auteurs, son lieu de publication, son année, son type, son statut de libre accès et sa licence, ainsi qu'un lien vers son DOI ou sa page d'accueil. Les sources dont l'affichage en direct n'est pas encore activé sur ce site sont énumérées à titre de référence et ne sont pas interrogées.
Search termsheatwaves; demand peaks; windstorms; ice storms; drought affecting hydropower; geomagnetic disturbance; cyber attack on operational technology; fuel supply disruption; OGC API – Features; NGFS climate scenarioscombined with: risk; hazard; early warning; resilience; vulnerability; impact; exposureDerived from the title of the area and the hazards in its profile, the NHS-1 hazards it names and the open standards it lists.
- OpenAlexlisted for reference; not queried
- Crossreflisted for reference; not queried
- DataCitelisted for reference; not queried
- Zenodolisted for reference; not queried
arXivrépertorié à titre de référence ; non interrogé- Europe PMClisted for reference; not queried
- OpenAIRE Graphlisted for reference; not queried
Aucune source n'est encore activée pour l'affichage en direct sur ce site : les sources sont listées à titre de référence et aucune n'est interrogée. Dès que l'éditeur de référence activera une source après examen de ses conditions, les travaux récents seront listés ici. Métadonnées et liens uniquement : titre, auteurs, support, année, type, statut d'accès libre et licence tels que consignés par chaque source ; les travaux sont listés à titre d'orientation, sans avoir été examinés ni approuvés.
Cours et disciplines de la Risk Academy
2 cours et 3 disciplines de Risk Academy (risksacademy.com) qui enseignent les connaissances et les méthodes de ce domaine. Chaque cours indique son niveau, son parcours et ses heures d'apprentissage.
Cours
Disciplines
La correspondance entre les cours, les disciplines et les Nexus Standards est tenue à jour avec la Risk Academy et fait l'objet de son examen académique.
Programmes, filières et cours pour ce domaine
GCRI Canada, The Global Risks Forum (GRF), The Global Risks Alliance (GRA) et Risk Academy travaillent sur l'objet de ce domaine dans des rôles distincts (recherche et éléments probants ; gouvernance, politiques et concertation ; capital, finance et marchés ; éducation et formation). Chaque entrée indique pourquoi elle correspond et l'étape qu'elle propose ; chaque institution fixe ses propres conditions de participation.
Recherche et données probantes
GCRI Canada
Programmes de recherche qui produisent les observations, les modèles et les évaluations que ces fiches décrivent.
Energy NexusStudies energy security, grids and interconnection, and grid disruption and recovery.Apply to this programme therisk.globalAll programmes of GCRI CanadaGouvernance, politiques et concertation
Le Global Risks Forum (GRF)
Parcours qui réunissent autorités publiques, chercheurs et institutions autour de la gouvernance des risques partagés.
Governance NexusCompares infrastructure governance across energy systems.Join this track globalriskforum.comAll tracks of The Global Risks ForumCapital, finance et marchés
La Global Risks Alliance (GRA)
Programmes sectoriels dans lesquels les institutions financières construisent une compréhension commune du risque systémique.
Risque financier lié au climat et à la natureExamine le risque de transition et la manière dont la transition énergétique réévalue les actifs.Rejoindre ce programme Asset Management NexusExamines transition finance and infrastructure in investment portfolios.Join this programme globalriskalliance.comAll programmes of The Global Risks AllianceÉducation et formation
Risk Academy
Cours et disciplines qui enseignent les connaissances et les méthodes dont les praticiens ont besoin pour appliquer ces normes.
Energy NexusRAN-302 · Intermediate · 20 learning hoursEnergy systems as a backbone of systemic risk across water, food and infrastructureTake this course Transition justeRAF-105 · Introductif · 20,5 heures d'apprentissageRépartir équitablement les coûts et les avantages du passage à une économie à faible émission de carboneSuivre ce cours Tous les cours et disciplinesPrésentés dans la section éducation et formation de cette pageTermes clés
- UNI
- Unique Nexus Identifier: a persistent identifier that resolves an artefact to its record.
- proposée
- A draft in the open development process that the Global Standards Council has not yet adopted. Each area profile is a proposal to the Nexus Standards registry.
- adopter
- Relation dans laquelle la norme externe est utilisée telle que publiée et les valeurs sont validées au regard de celle-ci.
- citer
- Relation dans laquelle la norme externe est citée par identifiant et URL à titre de référence.
- correspondance
- Relation dans laquelle les clauses de ces normes sont mises en correspondance avec des parties de la norme externe par numéro de clause, sans en reproduire le texte.
- profil de compatibilité (restreint)
- Relation avec une norme dont le texte n'est pas librement accessible : la norme est seulement nommée et liée, et tout profil de compatibilité est conservé sur des pages protégées.
- enregistrement de modification
- Un registre public d'une modification proposée au titre de NS-13, sur laquelle les rédacteurs statuent avec des motifs écrits.
- attestation
- An evaluator’s recorded result for one clause and one subject under NS-11.
- liaison recherchée
- Une liaison que le groupe de travail entend demander à l'organisme émetteur ; une liaison n'est établie que lorsque l'organisme la confirme par écrit.
Domaines connexes
Recherches et sources récentes
Articles évalués par les pairs, prépublications, rapports et jeux de données portant sur l'objet de ce domaine, récupérés au moment de la lecture auprès de services ouverts de métadonnées scientifiques (OpenAlex et Crossref) et listés avec leurs auteurs, lieu de publication, année, type et statut d'accès, avec un lien vers chaque travail. Les références sélectionnées et les normes connexes figurent en premier ; les travaux récents correspondant au sujet suivent et sont listés à titre d'orientation.
Références sélectionnées
- Influence of extreme weather and climate change on the resilience of power systems: Impacts and possible mitigation strategies
Electric Power Systems Research · 2015 · Peer-reviewed - Identifying, understanding, and analysing critical infrastructure interdependencies
IEEE Control Systems Magazine · 2001 · Peer-reviewed - Catastrophic cascade of failures in interdependent networks
Nature · 2010 · Peer-reviewed - Changement climatique 2022 : Atténuation du changement climatique (Groupe de travail III, AR6)
Groupe d'experts intergouvernemental sur l'évolution du climat · 2022 · Publication officielle
Normes et cadres connexes
- OGC API – Features
Open Geospatial Consortium - scénarios climatiques du NGFS
Réseau pour le verdissement du système financier - NIST Cybersecurity Framework 2.0
NIST - Recommandations du Groupe de travail sur l'information financière relative au climat
Task Force on Climate-related Financial Disclosures du CSF - GHG Protocol Corporate Accounting and Reporting Standard
World Resources Institute and WBCSD
Termes de recherche, établis à partir du titre du domaine et des aléas de son profil : vagues de chaleur ; pics de demande ; tempêtes de vent ; tempêtes de verglas ; sécheresse affectant l'hydroélectricité ; perturbation géomagnétique ; cyberattaque contre les technologies opérationnelles ; perturbation de l'approvisionnement en carburant ; combinés avec : risque ; aléa ; alerte précoce ; résilience ; vulnérabilité ; impact ; exposition. Si JavaScript est activé, les travaux récents correspondant à ces termes sont listés depuis OpenAlex et Crossref.
Questions et réponses.
Quel est le statut du domaine des normes relatives aux risques énergétiques ?
Comment les sources de données sont-elles présentées ?
Comment cette note peut-elle être modifiée ?
Apportez des éléments de preuve depuis cette page.
Reports est la publication trimestrielle du Consortium. Ce que vous savez de ce sujet peut devenir une donnée probante, un cas ou une correction dans la prochaine édition, avec mention de votre nom et publié sous licence CC BY 4.0 lorsqu'il s'agit de votre propre travail.
- CourrielPasserelle GW-STDL'envoyer depuis cette pageUne preuve, une correction, un cas, une méthode, un examen, une traduction ou une contribution à un profil. Elle arrive étiquetée avec cette page, de sorte que l'éditeur responsable la reçoit.
- ZenodoOpen depositDeposit it and submit to the communityPublish your own record on Zenodo with your ORCID iD, then submit it to the Reports community there. Curators review it; the DOI stays yours.
- ReportsNexus StandardsSee every way to contributeThe contribution types, how each is reviewed, what credit you receive, the licence and what is never accepted.
N'envoyez jamais de données personnelles, de détails sensibles sur des infrastructures ni rien que vous n'avez pas le droit de communiquer. Une contribution est examinée avant utilisation ; son envoi ne confère ni qualité d'auteur ni droits éditoriaux, et un parrainage n'achète jamais une conclusion.
Contribuer aux normes de risque énergétique
Institutions and experts are invited to propose amendments, join the working group or propose data sources. National participation is organised through each country’s National Nexus Consortium (NNC) and its National Working Groups (NWGs); competent national authorities are engaged through official channels.
Statut et usage. Les Nexus Standards sont des normes proposées, élaborées selon un processus ouvert sous NS-13 et publiées pour un usage volontaire ; elles ne constituent ni une certification, ni une accréditation, ni une approbation réglementaire, et leur adoption reste une décision du Global Standards Council et, dans chaque pays, de son Conseil national des normes. Un UNI (Unique Nexus Identifier) identifie un artefact ; il ne le certifie pas. Les noms des organismes de normalisation et de leurs normes appartiennent à leurs détenteurs et ne servent qu’à identifier les documents ; aucun texte de norme externe n’est reproduit ici. Nexus Standards n’est ni affilié à, ni approuvé ou certifié par un organisme de normalisation nommé ici.
Licences : CC BY 4.0 pour le texte des normes, les registres, les schémas et les données ; Apache-2.0 pour le code de référence. Les normes externes sont citées par leur nom, leur numéro et un lien, sous leurs propres licences. Les données, bibliothèques et polices de tiers conservent leurs propres licences : voir Mentions relatives aux tiers.