Estándares sobre riesgos energéticos
Electricity and fuel systems are the infrastructure on which every other sector depends, and they are being rebuilt during the energy transition while exposure to heat, storms, drought and cyber attack rises. This area of the Energy and Critical Infrastructure programme defines records for assets, outages, supply adequacy and transition risk so that grid operators, regulators and investors can trace a cascade from a hazard to an outage to dependent services with evidence that is comparable across systems and borders. Each artefact of the area carries a UNI (Unique Nexus Identifier).
- Nexus Standards: NS-0, NS-1, NS-3, NS-9, NS-10, NS-11.
- Open standards: OGC API – Features; NGFS climate scenarios; NIST Cybersecurity Framework 2.0; Recommendations of the Task Force on Climate-related Financial Disclosures; GHG Protocol Corporate Accounting and Reporting Standard.
- Datos y flujos: Global Power Plant Database; luces nocturnas NASA Black Marble (VNP46); datos de electricidad de Ember; Plataforma de Transparencia de ENTSO-E; API de datos abiertos de la EIA.
- Se acopla con: agua; infraestructura crítica y entidades críticas; clima; meteorología espacial, espectro y sincronización.
Resumen
- 01AlcanceAlcance y límites
- 02Acoplamientos sistémicosCanales de transmisión hacia áreas y programas conexos
- 03Acoplamientos sistémicosAcoplamientos sistémicos
- 04Modelo de sistemaCómo se propaga una perturbación por este sistema
- 05Amenazas y sectoresAmenazas, peligros y sectores afectados
- 06Estándares abiertosEstándares abiertos referenciados
- 07Fuentes de datosFuentes de datos
- 08IndicadoresIndicadores
- Nexus Standards
- 6
- NS-0, NS-1, NS-3
- Estándares abiertos
- 5
- citado, nunca copiado
- Datos y flujos
- 5
- indicado como referencia
- Acoplamientos
- 4
- con otras áreas
- Estado
- Propuestoen el catálogo · planificada · alcance NET
- Última revisión
- perfil de área
Nexus Standards (2026). Energy risk standards: area brief, Energy and Critical Infrastructure programme. Proposed. https://nexustandards.com/energy-infrastructure/energy-risk-standards/ · UNI NXS-STD-DC-000003. Last reviewed 17 October 2026.
Los archivos incluyen los créditos y la declaración de licencia y se generan en el navegador; no se transmite ningún dato. Las descargas requieren JavaScript.
Alcance y límites
Un área del programa de Energía e infraestructuras críticas (dominios). El perfil del área establece 5 asuntos dentro del alcance y 3 asuntos abordados por otras áreas.
En el ámbito 5
- Registros de activos de generación, transporte y distribución con su ubicación y exposición a amenazas
- Registros de eventos de interrupción y restablecimiento con su causa y los clientes afectados
- Indicadores de suficiencia del suministro y de seguridad de los combustibles
- Registros de riesgo de transición (exposición a activos varados, escenarios de políticas)
- Registros de dependencias intersectoriales para el análisis de cascadas
Fuera del alcance 3
- Normas del mercado eléctrico y formación de precios
- Normas de seguridad de los equipos y códigos de red
- Datos comerciales de negociación
Jurisdicciones La aplicación en cada jurisdicción es una decisión nacional, adoptada por el Consejo Nacional de Normas (NSC) con las autoridades nacionales competentes.
Canales de transmisión hacia áreas y programas conexos
Los acoplamientos sistémicos registrados para este contexto, agrupados por mecanismo de transmisión. La barra resume cada mecanismo (seleccione uno para filtrar); cada entrada nombra el área o el programa conectado y describe el mecanismo.
La vista interactiva requiere JavaScript; las secciones siguientes presentan los mismos registros.
Cascadas a través de sistemas acoplados
A shock such as heatwaves and demand peaks is observed through Global Power Plant Database; its effect on energy is recorded and propagated to Water risk standards and Critical infrastructure and critical entities through recorded couplings; cascade obligations are evaluated as clauses; indicators such as SDG 7.1.1 are computed from the records. 7 operations in 5 phases, built from the area profile: the rows carry its own data sources, indicators, open standards, couplings and, where listed, hazards, and each operation names the rules it implements (11). Records and artefacts are cited by UNI (Unique Nexus Identifier) and version.
Explorador de procesos · Standards · codificar y corregir
Ciclo de vida de una norma
17 pasos·6 etapas
Normas · codificar y corregir
Ciclo de vida de una norma
Ciclo de vida de una norma · Vía NS-13 · Canales de contribución · Vía IETF · Vía W3C · Vía OGC · Vía OASIS · Etapas ISO e IEC · Conformidad · Ciclo de vida de los registros · Encaminamiento · Seguimiento.
Las conclusiones del ciclo se convierten en propuestas de cambio, el Global Standards Council las adopta tras una última llamada pública y cada país decide su propia adopción.
01 Orientar las misiones
- 01Route missions to standards and profilesStep · Nexus StandardsNexus Standards routes each candidate mission to the standards and profiles that apply.
02 Perfiles y conformidad
- 02Componer los perfiles de misiónPaso · Nexus StandardsNexus Standards compone los perfiles de misión y registra toda adopción nacional de la que dependan las misiones.
- 03Validar los resultados de construcción frente a los perfilesPaso · Nexus StandardsNexus Standards valida los resultados de compilación frente a los perfiles compuestos y registra la evidencia.
- 04Supervisar la conformidad y registrar evidencia selladaPaso · Nexus StandardsDurante la Action Week, Nexus Standards supervisa la conformidad y registra las desviaciones.
03 Propuestas y revisión
- 05Las desviaciones y correcciones se convierten en propuestas de cambioPaso · Nexus StandardsLas desviaciones se convierten en propuestas de cambio y la corrección se registra como un cambio en la evidencia.
- 06Las conclusiones del ciclo se convierten en propuestas de cambioPaso · Nexus StandardsLas conclusiones de un ciclo se convierten en propuestas de cambio: las conclusiones sobre métodos y correcciones de Informes (F06) y los asuntos del expediente de Nexus…
- 07Redactar y revisar en abiertoPaso · Comités y grupos de trabajoLos comités técnicos y los grupos de trabajo redactan y revisan las normas en el proceso abierto de NS-13.
- 08Revisión hacia una decisión del consejoPaso · Nexus StandardsNexus Standards hace avanzar las propuestas de modificación mediante la revisión hacia una decisión del consejo.
04 Decisión del consejo
- 09Llamamiento final públicoPaso · Consejo Mundial de EstándaresEl Consejo Mundial de Estándares adopta por mayoría de dos tercios tras una última convocatoria de noventa días.
- 10Adopción mundial de una normaDecisión · Consejo Global de EstándaresEl Global Standards Council decide la adopción de cada norma tras la última llamada pública.
05 Publicar e identificar
- 11Asignar un UNI y publicarPaso · Secretaría (GCRI Canada)Nexus Standards asigna los UNI y deposita las publicaciones con arreglo al procedimiento del editor.
- 12Un UNI identifica y nunca certificaRegistro · Nexus StandardsCada objeto del año del programa lleva un identificador, un UNI según NS-1, para que pueda citarse, versionarse y resolverse.
- 13Publicar los cambios adoptados en el añoPaso · Nexus StandardsEn la renovación, Nexus Standards publica los cambios adoptados en el año y la situación de la adopción nacional.
06 Adopción y aplicación nacionales
- 14Adopción nacional por el Consejo Nacional de EstándaresDecisión · Consejo Nacional de EstándaresEl Consejo Nacional de Normas de cada país decide la adopción nacional: adoptar tal cual, adoptar con un perfil (NS-16), adaptar o solo hacer referencia.
- 15Las normas adoptadas llegan a cursos y edicionesPaso · Nexus StandardsCada norma o perfil adoptado se convierte en un módulo de curso en Risk Academy (F09), y las normas se aplican en las ediciones de los Informes (R1).
- 16La adopción es definitiva en cada jurisdicciónEstándar · Consejo Nacional de EstándaresLa adopción es definitiva en cada jurisdicción, y el GSC no tiene derecho de veto sobre una decisión nacional. Ningún órgano global tiene derecho de veto.
- 17Registros de adopción nacionalRegistro · Nexus StandardsLos perfiles de misión compuestos y los registros de adopción nacional pasan a la Foundry en la preparación (F08).
Nexus Standards · Nexus Standards (institution) · National Standards CouncilAn outline of the designed programme cycle, not a record of operation: no cycle has run and every programme is at service level R0. Every Nexus Standard is at the PROPOSED stage and nexustandards.com governs the text and status of each one. A UNI identifies and never certifies; a validator report is evidence for review, not a conformance claim.
Las operaciones, en forma de tabla
| Paso | Fase | Operación | Quién | Regla de decisión | Registro | Implementa |
|---|---|---|---|---|---|---|
| 01 | Choque | Perturbación observada (inicio). Amenazas y peligros dentro del alcance: olas de calor y picos de demanda, tormentas de viento y de hielo, sequía que afecta a la energía hidroeléctrica y la refrigeración, perturbaciones geomagnéticas y ciberataques contra la tecnología operativa. | el organismo de observación | las observaciones son registros con versiones de origen | observaciones de olas de calor y picos de demanda a partir de la Global Power Plant Database | NS1-R2 |
| 02 | Sistema | Estado del sistema (registro). Dentro del alcance: registros de activos de generación, transmisión y distribución con ubicación y exposición a amenazas, registros de eventos de interrupción y restablecimiento con causa y clientes afectados, e indicadores de suficiencia del suministro y seguridad de combustibles. | el operador del sistema | los registros del sistema llevan UNI y versiones | Registros de activos de generación, transporte y distribución con su ubicación y exposición a amenazas | NS1-R1 |
| 03 | Sistema | Modelo de impacto (modelo). La incertidumbre se muestra allí donde existe. | el equipo de modelización | los modelos llevan una ficha de modelo y citan sus insumos por su UNI | estimación de impacto con las luces nocturnas NASA Black Marble (VNP46) como insumo | NS12-R2, NS5-R3 |
| 04 | Acoplamiento | Sistema acoplado (paso). Acoplamientos de esta área: normas de riesgo hídrico, infraestructura crítica y entidades críticas, normas de riesgo climático y normas de riesgo de meteorología espacial, espectro y sincronización. | el programa de Normas de riesgo hídrico | los acoplamientos son relaciones registradas con evidencia | Factor común: la sequía reduce la producción hidroeléctrica y limita la refrigeración térmica; los fallos de la red detienen el bombeo y el tratamiento del agua. | NS0-P9, NS15-R11 |
| 05 | Acoplamiento | Segundo sistema (paso). Cada paso de la cascada cita los registros en los que se basa. | el programa de Infraestructuras críticas y entidades críticas | las relaciones controvertidas se muestran como controvertidas | Cascada: la pérdida de electricidad se propaga a las telecomunicaciones, la salud, el transporte y las finanzas a través de redes interdependientes. | NS15-R13 |
| 06 | Obligaciones | Cláusulas de cascada (puerta). Nexus Standards de esta área: NS-0, NS-1, NS-3, NS-9, NS-10, NS-11. | un evaluador con mandato | la interdependencia entre dominios se aborda de forma explícita | atestaciones de las obligaciones en cascada redactadas como cláusulas NS-10 | NS0-P9, NS10-R1, NS11-R1 |
| 07 | Indicadores | ODS 7.1.1 (final). Indicadores de esta área: ODS 7.1.1 (Proporción de la población que tiene acceso a la electricidad), ODS 7.2.1 (Proporción de energía renovable en el consumo final total de energía) y Monitor de Sendai D-5 (Número de interrupciones de los servicios básicos atribuidas a desastres). | oficinas nacionales de estadística y custodios | los indicadores se calculan a partir de los registros y los citan | ODS 7.1.1 (proporción de la población con acceso a la electricidad) | NS11-R5, NS14-R1 |
Table.Operations in walking order; each row names the phase, the operation, its actor, its decision rule, the record it leaves and the rule identifiers it implements. The table shows the process as specified; it does not report the status of any standard, proposal or record. Sources: OGC API – Features · NGFS climate scenarios · NS-0: Constitution and principles · NS-1: The UNI and the artefact catalogue.
Los sectores que las normas de riesgo energético deben describir.
Los sectores incluidos en el alcance de las normas de riesgo energético y las relaciones que sus cláusulas hacen explícitas, de modo que los registros de distintos sectores sean interoperables.
Firma
La energía y sus socios
La energía aporta electricidad para el transporte y las telecomunicaciones a la infraestructura (0.8), bombeo y tratamiento al agua (0.5) y fertilizantes, maquinaria y cadenas de frío a la alimentación (0.5).
W · E · I · F · H · B.
- Sectores
- 4 de 6
- Relaciones
- 6 de 15
- Acoplamiento
- 0.46 proporción del total
Relaciones más fuertes en juego
- Energía → Infraestructura · electricidad para transporte y telecomunicaciones0.8
- Agua → Energía · agua de refrigeración e hidroelectricidad0.6
- Agua → Alimentación · riego0.8
- Infraestructura → Agua · tuberías, presas y plantas de tratamiento0.6
Acoplamientos sistémicos
4 acoplamientos vinculan esta área con otras áreas y programas, cada uno con el mecanismo del vínculo.
- Estándares de riesgo hídricoAgua y alimentación sistemasFactor común: la sequía reduce la producción hidroeléctrica y limita la refrigeración térmica; los fallos de la red detienen el bombeo y el tratamiento del agua.
- Infraestructura crítica y entidades críticasEnergía e infraestructuras críticasCascada: la pérdida de electricidad se propaga a las telecomunicaciones, la salud, el transporte y las finanzas a través de redes interdependientes.
- Normas sobre riesgos climáticosClima y sistemas terrestresRetroalimentación: la política de transición modifica el valor de los activos y la combinación de combustibles, mientras que el cambio climático físico altera los picos de demanda y la fiabilidad del suministro.
- Estándares de riesgo de meteorología espacial, espectro y sincronizaciónAmenazas y reducción del riesgoFactor común: las tormentas geomagnéticas inducen corrientes que dañan los transformadores y perturban la sincronización GNSS utilizada en la sincronización de la red eléctrica.
Cómo se propaga una perturbación por este sistema
A system model of this area built from the registry: 18 hazards, 5 systems, 4 sectors, 12 controls, 5 feeds, 4 indicators. Select the components to include, choose an initiating hazard and run the scenario. Stress propagates through the hazard relations of the Nexus Hazard Standard (NHS-1), the exposure of each system, the recorded couplings and the sectors that carry the loss; adopted standards dampen transmission and live data sources support detection. All parameters are stated assumptions that the reader can adjust; results are illustrative scenario outputs for exercises and training, not forecasts or risk assessments. The Map view places the same run on an example geography, Europe, the region of the programme’s context map, with open data: country boundaries, a grid of hexagonal cells and NASA satellite layers for the initiating hazard. The geography serves exercises and training and is not an assessment of that place.
Amenazas
- Ola de calor
- Tormenta de viento
- Apagón generalizado (desencadenada aguas abajo)
- Gran perturbación forestal (desencadenada aguas abajo)
- Incendios forestales (desencadenada aguas abajo)
- Condiciones meteorológicas extremas de incendio (desencadenadas aguas abajo)
- Estrés de la red por calor (desencadenado aguas abajo)
- Sequía agrícola (desencadenada aguas abajo)
- Sequía repentina (desencadenada aguas abajo)
- Sequía de nieve (desencadenada aguas abajo)
- Episodio de ozono troposférico (desencadenado aguas abajo)
- Sequía meteorológica (desencadenada aguas abajo)
- Calor nocturno extremo (provocado aguas abajo)
- Ola de calor en lagos y ríos (desencadenada aguas abajo)
- Limitación del agua de refrigeración de las centrales eléctricas (provocada aguas abajo)
- Pandeo de vías por calor (desencadenado aguas abajo)
- Empuje de hielo en la orilla (desencadenado aguas abajo)
- Seiche (provocado aguas abajo)
Sistemas y acoplamientos
Controles
NS-0Constitución y principiosNS-1El UNI y el catálogo de artefactos (gramática v0.2: segmentos de dominio, sector, región y entorno)NS-3UNI de registros de riesgo (gramática, correspondencia con lo existente, autoridad de asignación)NS-9UNI contextuales (despliegues, instancias, instancias de programa)NS-10Políticas y cláusulas (obligaciones legibles por máquina: definición, carácter vinculante, evaluación y cumplimiento)NS-11Verificación y seguimiento (evidencia, atestaciones, observación de la conformidad de confianza cero)NRS-H84Familia de amenazas: inestabilidad y déficit del sistema energético (NHS-1 infra.energy)NRS-H61Familia de amenazas: fallo en cascada (NHS-1 sys.cascade)NRS-U8Perfil de plataforma de Universe: Energy NexusNRS-H48Familia de amenazas: interrupción de redes de servicios públicos y comunicaciones (NHS-1 infra.utilities)NRS-H109Familia de amenazas: fallos de tecnologías de la transición energética (NHS-1 tech.energy-transition)NRS-H54Familia de amenazas: interrupción de señales y plataformas (NHS-1 cyber.platform)
Observación
- Global Power Plant Database (incluido como referencia)
- Luces nocturnas NASA Black Marble (VNP46) (incluidas como referencia)
- Datos de electricidad de Ember (citados como referencia)
- Plataforma de transparencia de ENTSO-E (incluida como referencia)
- API Open Data de la EIA (incluida como referencia)
- Proporción de la población con acceso a la electricidad
- Proporción de energía renovable en el consumo final total de energía
- Número de interrupciones de los servicios básicos atribuidas a desastres
- Daños a infraestructuras críticas atribuidos a desastres
Geografía de ejemplo
- Europa: 113 celdas hexagonales
- Temperatura del aire en superficie, diurna (AIRS), NASA GIBS
- Intensidad de la lluvia, última media hora (IMERG), NASA GIBS
- Luces nocturnas de esta noche, apagones (VIIRS Day/Night Band), NASA GIBS
- Alertas de perturbación de la vegetación, 30 m (OPERA DIST-ALERT), NASA GIBS
Amenazas, peligros y sectores afectados
Amenazas y peligros 6
Sectores 4
Estándares abiertos referenciados
5 normas abiertas, cada una con su relación tal como figura en el registro bajo NS-14. Pase el cursor o enfoque una relación para ver su definición.
correspondencia2
Marco de Ciberseguridad 2.0 del NISTNISTincluido en el registro · nist-csf-2Recomendaciones del Grupo de Trabajo sobre Divulgaciones Financieras Relacionadas con el ClimaGrupo de Trabajo del FSB sobre Divulgaciones Financieras Relacionadas con el Climaincluido en el registro · tcfd-recommendationsFuentes de datos
5 fuentes de datos mencionadas en el perfil del área, cada una con su proveedor, licencia, frecuencia de actualización y vía de entrega.
Las fuentes de datos se indican como referencia; los datos en directo se muestran una vez concluida la revisión de las licencias.
- En vivo
- 0
- una vez concluida la revisión de las licencias
- Incluida en el registro de datos
- 2
- condiciones de licencia registradas
- Propuesta para el registro
- 3
- condiciones de licencia por registrar
- Impartición
- 2 servicio gobernado · 0 complemento · 0 navegador · 2 instantánea · 1 indicado como referencia
- vías propuestas por orden de preferencia: servicio de datos gobernado, complemento, lectura directa en el navegador, instantánea en tiempo de compilación; las fuentes cuyas condiciones no permiten la reutilización se enumeran solo como referencia
Global Power Plant Databasefor reference
World Resources Institute · publicación estática (v1.3.0)
CC BY 4.0
servicio de datos gobernadoincluido en el registro de datos.
Luces nocturnas Black Marble de la NASA (VNP46)como referencia.
NASA Goddard / LAADS DAAC · diario
Política de datos e información de ciencias de la Tierra de la NASA (abierta)
servicio de datos gobernadoincluido en el registro de datos.
EIA Open Data APIfor reference
U.S. Energy Information Administration · hourly to annual.
Obra del Gobierno de los Estados Unidos, dominio público
instantánea en tiempo de compilaciónpropuesto para el registro de datos
Datos de electricidad de Embercomo referencia
Ember · mensual
CC BY 4.0
instantánea en tiempo de compilaciónpropuesto para el registro de datos
ENTSO-E Transparency Platformfor reference
ENTSO-E · horaria
ENTSO-E transparency terms and conditions; licence to be recorded by Legal.
indicado como referenciapropuesto para el registro de datos.
Indicadores
El perfil del área indica 4 indicadores, cada uno con su marco y su código.
Los nombres y códigos de los indicadores se indican tal como los publican sus custodios.
Perfiles de compatibilidad restringidos
3 normas cuyo texto no está disponible de forma abierta, que solo se mencionan y enlazan. Todo perfil de compatibilidad se mantiene en páginas protegidas hasta que exista un acuerdo con el organismo emisor.
- IEC 62443 series Security for industrial automation and control systemsIEC TC 65compatibility profile (restricted)
- NERC Critical Infrastructure Protection Reliability StandardsNorth American Electric Reliability Corporationcompatibility profile (restricted)
- ISO 55000:2024 Asset management – Vocabulary, overview and principlesISO/TC 251compatibility profile (restricted)
Estándares que se aplican
The area profile lists 6 Nexus Standards; the registry lists NS-0, NS-1, NS-3, NS-9, NS-10, NS-11 for this area. Each is a proposed standard under development.
- 01
NS-0 · Constitución y principios
Status: proposed · 12 requirements stated. Read NS-0 · Requirements for this area.
- 02
NS-1 · The UNI and the artefact catalogue (grammar v0.2: domain, sector, region and environment segments)
Status: proposed · 10 requirements stated. Read NS-1 · Requirements for this area.
- 03
NS-3 · UNI de los registros de riesgo (gramática, correspondencia con identificadores heredados, autoridad de asignación)
Status: proposed · 0 requirements stated. Read NS-3 · Requirements for this area.
- 04
NS-9 · UNI contextuales (despliegues, instancias, instancias de programas)
Status: proposed · 5 requirements stated. Read NS-9 · Requirements for this area.
- 05
NS-10 · Policies and clauses (machine-readable obligations: definition, binding, evaluation and enforcement)
Status: proposed · 7 requirements stated. Read NS-10 · Requirements for this area.
- 06
NS-11 · Verificación y seguimiento (evidencia, atestaciones, observación de la conformidad con la confianza cero)
Status: proposed · 6 requirements stated. Read NS-11 · Requirements for this area.
Vías de evidencia, reconocimiento y capital
Lo que cada institución del ecosistema obtiene de esta área: el Global Centre for Risk and Innovation (GCRI Canada), como Secretaría, la evidencia; el Global Risks Forum (GRF), el reconocimiento; y la Global Risks Alliance (GRA), el capital.
GCRI Canada
GCRI Canada puede tratar como evidencia para la investigación sobre cascadas los registros de interrupciones y de exposición de activos que incluyan las versiones de origen y el historial de correcciones; la decisión corresponde a GCRI Canada conforme a sus propias normas de evidencia e investigación.
El Global Risks Forum (GRF)
El GRF puede registrar como punto de diálogo transfronterizo a los operadores de red y los reguladores que adoptan el perfil de registro de interrupciones; la decisión corresponde al GRF conforme a sus propias normas de reconocimiento.
La Global Risks Alliance (GRA)
La GRA puede utilizar registros de riesgo de transición y de exposición física cuando examina carteras de proyectos energéticos; la decisión corresponde a la GRA conforme a sus propias normas de preparación del capital.
Cada institución determina conforme a sus propias normas lo que acepta como evidencia; la lectura de un itinerario no constituye una aprobación ni asesoramiento de inversión.
Herramientas de enrutamiento, seguimiento y verificación
Consola de seguimiento
Versión y estado de la fuente de cada norma, tal como los publican los organismos emisores.
Disponible · se ejecuta en el navegadorConsola de enrutamiento
Select a sector, hazard family, capability and artefact type; the registry identifies the applicable standards and states the reasons.
Disponible · borrador en el navegadorCompositor de perfiles
Combinar normas y cláusulas en un borrador de perfil con citas, en YAML o JSON; no se presenta nada.
Cada consola realiza sus cálculos a partir del registro y expone su razonamiento; las decisiones corresponden a los órganos competentes.
Estatuto del grupo de trabajo
Una carta constitutiva propuesta para esta área, abierta a instituciones y expertos.
Registros de interrupciones, exposición de los activos y riesgo de transición, y el grafo de dependencias que vincula la energía con otros servicios críticos.
Institutions and experts are invited to charter this working group under NS-13 by filing a public change record. National Working Groups (NWGs) contribute national inputs and field exercises through their National Nexus Consortium (NNC).
- Perfil de registro de eventos de interrupción con códigos de causa y cronología de restablecimiento
- Esquema de grafo de dependencias energéticas para los contextos NS-9
- Correspondencia de las familias de controles cibernéticos y de fiabilidad (solo mencionadas, sin reproducir texto)
- Programas de Colaboración Tecnológica de la AIE enlace en trámite
- ENTSO-E enlace en trámite
- IRENA enlace en trámite
- Programa de Asistencia para la Gestión del Sector de la Energía del Banco Mundial enlace en trámite
Usuarios previstos
El perfil del área identifica 4 comunidades de usuarios.
- Operadores de los sistemas de transmisión y distribución
- Reguladores de la energía
- Analistas del clima y del riesgo de transición en las finanzas
- Planificadores de protección civil
Cuestiones de investigación abiertas
3 preguntas señaladas como prioritarias para el grupo de trabajo.
- Los datos de interrupciones suelen ser comercialmente sensibles o estar en manos de operadores privados; las luces nocturnas son un indicador indirecto con sesgos conocidos en relación con la nubosidad y las zonas de baja densidad.
- Ninguna taxonomía común de causas concilia las causas meteorológicas, de equipos y cibernéticas entre jurisdicciones.
- Los escenarios de transición (NGFS, AIE) no están diseñados para reducirse a escala de activos, por lo que el riesgo de transición a nivel de activos descansa en supuestos que deben declararse.
Inscripción en el registro y páginas de profundización
Esta área figura en el catálogo (estado: prevista; alcance NET; 4 dominios de correspondencia). Cuenta con cinco páginas de profundización y una correspondencia de sus dominios en el registro.
Estándares que se aplican
Las reglas de cada norma enumerada, leídas mediante el lector de especificaciones.
Profundidad · CorrespondenciaCorrespondencias
Every register entry in the area’s domains, by relation, with the crosswalk graph.
Profundidad · Registros y esquemasRegistros y esquemas
Alcance, registro, explorador de esquemas y cómo se resuelve un UNI.
Profundización · ConformidadConformidad
Cláusulas, evidencia y atestaciones para la evaluación de la conformidad.
Profundidad · PreparaciónPreparación
El área junto a los tres itinerarios, en forma de matriz.
La tabla de correspondencias: 48 estándares externos por dominio
Nexus Standards en el grafo: NS-0, NS-1, NS-3, NS-9, NS-10, NS-11. Una relación es una entrada de registro, nunca una declaración de conformidad.
6 Nexus Standards · 4 dominios · 48 normas externas · 33 organismos emisores · 0 repositorios de implementación. Las relaciones (adopción, perfil, correspondencia, cita) son las registradas en el registro; los nombres y las normas siguen perteneciendo a sus custodios.
Crosswalk graph91 nodes and 120 links from the registry of external standards, programme areas and implementations (the external standards register, the consumers register. Relations (adopt, profile, crosswalk, cite) are shown as recorded in the register.
Areas carry no geography of their own; the map shows where the bodies that issue the area’s external standards are based.
Organismos emisores y sus sedes (27)
| Organismo | Sede | Entradas del registro |
|---|---|---|
| NIST | Gaithersburg, Maryland, Estados Unidos | 7 |
| ISO/IEC JTC 1/SC 27 | Ginebra, Suiza | 3 |
| GHG Protocol | Washington, Distrito de Columbia, Estados Unidos | 2 |
| IEC TC 57 | Ginebra, Suiza | 2 |
| IEC TC 65 | Ginebra, Suiza | 2 |
| ISO/TC 207/SC 7 | Ginebra, Suiza | 2 |
| ISO/TC 268 | Ginebra, Suiza | 2 |
| ISO/TC 299 | Ginebra, Suiza | 2 |
| Comité Técnico de OASIS sobre inteligencia de ciberamenazas | Woburn, Massachusetts, Estados Unidos | 2 |
| Centro Común de Investigación de la Comisión Europea | Ispra, Italia | 1 |
| Parlamento Europeo y Consejo | Bruselas, Bélgica | 1 |
| Grupo de Interés Especial CVSS de FIRST | Cary, Carolina del Norte, Estados Unidos | 1 |
| IEC TC 65 con la ISA (ISA/IEC 62443) | Ginebra, Suiza | 1 |
| IEEE | Piscataway, Nueva Jersey, Estados Unidos | 1 |
| IETF | Wilmington, Delaware, Estados Unidos | 1 |
| Grupo Intergubernamental de Expertos sobre el Cambio Climático | Ginebra, Suiza | 1 |
| Consejo de Normas Internacionales de Sostenibilidad (Fundación IFRS) | Fráncfort, Alemania | 1 |
| ISO/IEC JTC 1/SC 39 | Ginebra, Suiza | 1 |
| ISO/TC 251 | Ginebra, Suiza | 1 |
| ISO/TC 301 | Ginebra, Suiza | 1 |
| ISO/TC 59/SC 13 | Ginebra, Suiza | 1 |
| ITU-R | Ginebra, Suiza | 1 |
| ITU-T SG15 | Ginebra, Suiza | 1 |
| Red para la Ecologización del Sistema Financiero | París, Francia | 1 |
| North American Electric Reliability Corporation | Atlanta, Georgia, Estados Unidos | 1 |
| Science Based Targets initiative | Londres, Reino Unido | 1 |
| World Resources Institute y WBCSD (GHG Protocol) | Washington, Distrito de Columbia, Estados Unidos | 1 |
Issuing bodies are shown at the city of their public seat. The 1 programmes, 0 implementing repositories and 19 Nexus Standards have no location and are not mapped · 6 issuing bodies have no single public seat and are listed without a location: IOC-UNESCO Global Ocean Observing System; UNFCCC; International Atomic Energy Agency; International Civil Aviation Organization; International Maritime Organization; United Nations General Assembly.
Globo de normas27 organismos emisores con sede pública y 48 entradas de registro, mostrados en celdas de igual superficie con cuatro niveles de detalle. Las sedes se sitúan en las coordenadas de la ciudad; las áreas de programa, las implementaciones y las normas no tienen ubicación y no se dibujan. Cuando los scripts no están disponibles, se muestra un mapa del mundo estático.
| Área en los sitios institucionales | Artefact kinds | Normas rectoras | Páginas |
|---|---|---|---|
| Energía (portal de campo de GCRI Canada; contrapartes del GRF y la GRA) | datos, conjunto de datos, informe, mapa, documentación | NS-1, NS-3, NS-3b, NS-4, NS-5 | therisk.global/fields/energy/ |
| Inseguridad alimentaria, hídrica y energética; inestabilidad de la red | data, dataset, model, map, report | NS-1, NS-3, NS-3b, NS-5 | therisk.global/challenges/ |
Del registro de cobertura del ecosistema: material que GCRI Canada, el Global Risks Forum (GRF) y la Global Risks Alliance (GRA) publican sobre esta área, según lo declara cada institución.
Fuentes
4 references from peer-reviewed and official publications cited in the area profile, linked at the publishers’ own sites.
peer-reviewedInfluence of extreme weather and climate change on the resilience of power systems: Impacts and possible mitigation strategiesElectric Power Systems Research · 2015peer-reviewedCatastrophic cascade of failures in interdependent networksNature · 2010peer-reviewedIdentifying, understanding, and analysing critical infrastructure interdependenciesIEEE Control Systems Magazine · 2001- oficialCambio Climático 2022: Mitigación del Cambio Climático (Grupo de Trabajo III del IE6)Grupo Intergubernamental de Expertos sobre el Cambio Climático · 2022
Investigaciones recientes sobre esta área
Artículos recientes revisados por pares, preprints, conjuntos de datos e informes sobre el tema de esta área, recuperados en el momento de la lectura de servicios abiertos de metadatos académicos (OpenAlex, Crossref, DataCite, Zenodo, arXiv, Europe PMC, OpenAIRE Graph) con términos de búsqueda compuestos a partir del registro. Cada obra se presenta con sus autores, medio de publicación, año, tipo, estado de acceso abierto y licencia, con enlaces a su DOI o página de destino. Las fuentes aún no habilitadas para mostrarse en vivo en este sitio se enumeran como referencia y no se consultan.
Search termsheatwaves; demand peaks; windstorms; ice storms; drought affecting hydropower; geomagnetic disturbance; cyber attack on operational technology; fuel supply disruption; OGC API – Features; NGFS climate scenarioscombined with: risk; hazard; early warning; resilience; vulnerability; impact; exposureDerived from the title of the area and the hazards in its profile, the NHS-1 hazards it names and the open standards it lists.
- OpenAlexlisted for reference; not queried
- Crossreflisted for reference; not queried
- DataCitelisted for reference; not queried
- Zenodolisted for reference; not queried
arXivindicado como referencia; no consultado- Europe PMClisted for reference; not queried
- OpenAIRE Graphlisted for reference; not queried
Todavía no hay ninguna fuente habilitada para su visualización en vivo en este sitio: las fuentes se enumeran a modo de referencia y no se consulta ninguna. Una vez que el editor de referencia habilite una fuente tras examinar sus condiciones, aquí se enumerarán las obras recientes. Solo metadatos y enlaces: título, autores, publicación, año, tipo, situación de acceso abierto y licencia, tal como los registra cada fuente; las obras se enumeran a título orientativo, sin examen ni respaldo.
Cursos y disciplinas de la Risk Academy
2 cursos y 3 disciplinas de Risk Academy (risksacademy.com) que enseñan los conocimientos y métodos de esta área. Cada curso indica su nivel, itinerario y horas de aprendizaje.
Cursos
Disciplinas
La correspondencia entre los cursos, las disciplinas y los Nexus Standards se mantiene con la Risk Academy y está sujeta a su revisión académica.
Programas, líneas y cursos de esta área
GCRI Canada, The Global Risks Forum (GRF), The Global Risks Alliance (GRA) y Risk Academy trabajan sobre el tema de esta área con funciones distintas (investigación y evidencia; gobernanza, políticas y convocatoria; capital, finanzas y mercados; educación y formación). Cada entrada indica por qué corresponde y el paso que ofrece; cada institución fija sus propias condiciones de participación.
Investigación y evidencia
GCRI Canada
Programas de investigación que producen las observaciones, los modelos y las evaluaciones que describen estos registros.
Energy NexusStudies energy security, grids and interconnection, and grid disruption and recovery.Apply to this programme therisk.globalAll programmes of GCRI CanadaGobernanza, políticas y convocatoria
El Global Risks Forum (GRF)
Vías que reúnen a autoridades públicas, investigadores e instituciones en torno a la gobernanza de los riesgos compartidos.
Governance NexusCompares infrastructure governance across energy systems.Join this track globalriskforum.comAll tracks of The Global Risks ForumCapital, finanzas y mercados
La Global Risks Alliance (GRA)
Programas sectoriales en los que las instituciones financieras construyen una comprensión compartida del riesgo sistémico.
Riesgo financiero climático y de la naturalezaExamina el riesgo de transición y cómo la transición energética revaloriza los activos.Unirse a este programa Asset Management NexusExamines transition finance and infrastructure in investment portfolios.Join this programme globalriskalliance.comAll programmes of The Global Risks AllianceEducación y formación
Risk Academy
Cursos y disciplinas que enseñan los conocimientos y métodos que los profesionales necesitan para aplicar estos estándares.
Energy NexusRAN-302 · Intermediate · 20 learning hoursEnergy systems as a backbone of systemic risk across water, food and infrastructureTake this course Transición justaRAF-105 · Introductorio · 20.5 horas de aprendizajeReparto equitativo de los costes y beneficios del paso a una economía baja en carbonoSeguir este curso Todos los cursos y disciplinasSe enumeran en la sección de educación y formación de esta páginaTérminos clave
- UNI
- Unique Nexus Identifier: a persistent identifier that resolves an artefact to its record.
- propuesto
- A draft in the open development process that the Global Standards Council has not yet adopted. Each area profile is a proposal to the Nexus Standards registry.
- adoptar
- Relación en la que la norma externa se utiliza tal como está publicada y los valores se validan con respecto a ella.
- citar
- Relación en la que la norma externa se cita por su identificador y su URL como referencia.
- correspondencia
- Relación en la que las cláusulas de estas normas se ponen en correspondencia con partes de la norma externa por número de cláusula, sin reproducir su texto.
- perfil de compatibilidad (restringido)
- Relación con una norma cuyo texto no está disponible abiertamente: la norma solo se nombra y se enlaza, y cualquier perfil de compatibilidad se conserva en páginas protegidas.
- registro de cambios
- Un registro público de un cambio propuesto en virtud de NS-13, sobre el que deciden los editores con motivos por escrito.
- atestación
- An evaluator’s recorded result for one clause and one subject under NS-11.
- enlace en trámite
- Un enlace que el grupo de trabajo tiene la intención de solicitar al organismo emisor; un enlace solo se establece cuando el organismo lo confirma por escrito.
Áreas relacionadas
Investigaciones y fuentes recientes
Artículos revisados por pares, preimpresiones, informes y conjuntos de datos sobre el tema de esta área, obtenidos en el momento de la lectura de servicios abiertos de metadatos académicos (OpenAlex y Crossref) y enumerados con autores, publicación, año, tipo y estado de acceso, con un enlace a cada obra. En primer lugar se enumeran las referencias seleccionadas y las normas conexas; a continuación figuran, a título orientativo, los trabajos recientes que coinciden por tema.
Referencias seleccionadas
- Influence of extreme weather and climate change on the resilience of power systems: Impacts and possible mitigation strategies
Electric Power Systems Research · 2015 · Peer-reviewed - Identifying, understanding, and analysing critical infrastructure interdependencies
IEEE Control Systems Magazine · 2001 · Peer-reviewed - Catastrophic cascade of failures in interdependent networks
Nature · 2010 · Peer-reviewed - Cambio Climático 2022: Mitigación del Cambio Climático (Grupo de Trabajo III del IE6)
Grupo Intergubernamental de Expertos sobre el Cambio Climático · 2022 · Publicación oficial
Normas y marcos conexos
- OGC API – Features
Open Geospatial Consortium - Escenarios climáticos de la NGFS
Red para la Ecologización del Sistema Financiero - Marco de Ciberseguridad 2.0 del NIST
NIST - Recomendaciones del Grupo de Trabajo sobre Divulgaciones Financieras Relacionadas con el Clima
Grupo de Trabajo del FSB sobre Divulgaciones Financieras Relacionadas con el Clima - GHG Protocol Corporate Accounting and Reporting Standard
World Resources Institute and WBCSD
Términos de búsqueda, derivados del título del área y de las amenazas de su perfil: olas de calor; picos de demanda; tormentas de viento; tormentas de hielo; sequía que afecta a la energía hidroeléctrica; perturbaciones geomagnéticas; ciberataques contra la tecnología operativa; perturbaciones del suministro de combustible; combinados con: riesgo; amenaza; alerta temprana; resiliencia; vulnerabilidad; impacto; exposición. Con JavaScript activado, se enumeran trabajos recientes que coinciden con estos términos a partir de OpenAlex y Crossref.
Preguntas y respuestas.
¿Cuál es el estado del área de normas de riesgo energético?
¿Cómo se presentan las fuentes de datos?
¿Cómo puede modificarse este resumen?
Aporte evidencia desde esta página.
Reports es la publicación trimestral del Consortium. Lo que usted sabe sobre este tema puede convertirse en evidencia, un caso o una corrección en la próxima edición, con su crédito y publicado bajo licencia CC BY 4.0 cuando se trate de obra propia.
- Correo electrónicoPasarela GW-STDEnvíelo desde esta páginaEvidencia, una corrección, un caso, un método, una revisión, una traducción o un aporte al perfil. Llega etiquetado con esta página, de modo que lo recibe el editor responsable de ella.
- ZenodoOpen depositDeposit it and submit to the communityPublish your own record on Zenodo with your ORCID iD, then submit it to the Reports community there. Curators review it; the DOI stays yours.
- ReportsNexus StandardsSee every way to contributeThe contribution types, how each is reviewed, what credit you receive, the licence and what is never accepted.
No envíe nunca datos personales, detalles sensibles de infraestructura ni nada que no tenga derecho a compartir. Un aporte se revisa antes de su uso; enviarlo no confiere autoría ni derechos editoriales, y el patrocinio nunca compra un hallazgo.
Contribuir a las normas de riesgo energético
Institutions and experts are invited to propose amendments, join the working group or propose data sources. National participation is organised through each country’s National Nexus Consortium (NNC) and its National Working Groups (NWGs); competent national authorities are engaged through official channels.
Estado y uso. Las Nexus Standards son normas propuestas, elaboradas mediante un proceso abierto según NS-13 y publicadas para uso voluntario; no constituyen certificación, acreditación ni aprobación regulatoria, y su adopción sigue siendo una decisión del Global Standards Council y, en cada país, de su Consejo Nacional de Normas. Un UNI (Unique Nexus Identifier) identifica un artefacto; no lo certifica. Los nombres de los organismos de normalización y de sus normas pertenecen a sus titulares y se usan solo para identificar los documentos; aquí no se reproduce ningún texto de una norma externa. Nexus Standards no está afiliada a ningún organismo de normalización aquí nombrado, ni respaldada o certificada por él.
Licencias: CC BY 4.0 para el texto de los estándares, los registros, los esquemas y los datos; Apache-2.0 para el código de referencia. Los estándares externos se citan por nombre, número y enlace, conforme a sus propias licencias. Los datos, bibliotecas y fuentes tipográficas de terceros conservan sus propias licencias: véanse los Avisos de terceros.