Energierisikostandards
Electricity and fuel systems are the infrastructure on which every other sector depends, and they are being rebuilt during the energy transition while exposure to heat, storms, drought and cyber attack rises. This area of the Energy and Critical Infrastructure programme defines records for assets, outages, supply adequacy and transition risk so that grid operators, regulators and investors can trace a cascade from a hazard to an outage to dependent services with evidence that is comparable across systems and borders. Each artefact of the area carries a UNI (Unique Nexus Identifier).
- Nexus Standards: NS-0, NS-1, NS-3, NS-9, NS-10, NS-11.
- Open standards: OGC API – Features; NGFS climate scenarios; NIST Cybersecurity Framework 2.0; Recommendations of the Task Force on Climate-related Financial Disclosures; GHG Protocol Corporate Accounting and Reporting Standard.
- Daten und Feeds: Global Power Plant Database; NASA Black Marble night-time lights (VNP46); Ember electricity data; ENTSO-E Transparency Platform; EIA Open Data API.
- Verknüpft mit: Wasser; kritische Infrastruktur und kritische Einrichtungen; Klima; Weltraumwetter, Frequenzspektrum und Zeitgebung.
Zusammenfassung
- 01GeltungsbereichGeltungsbereich und Abgrenzungen
- 02Systemische KopplungenÜbertragungswege zu verwandten Bereichen und Programmen
- 03Systemische KopplungenSystemische Kopplungen
- 04SystemmodellWie sich ein Schock durch dieses System ausbreitet
- 05Gefahren und SektorenBetroffene Gefahren, Bedrohungen und Sektoren
- 06Offene StandardsReferenzierte offene Standards
- 07DatenquellenDatenquellen
- 08IndikatorenIndikatoren
- Nexus Standards
- 6
- NS-0, NS-1, NS-3
- Offene Standards
- 5
- genannt, nie kopiert
- Daten und Feeds
- 5
- zur Referenz aufgeführt
- Kopplungen
- 4
- mit anderen Bereichen
- Status
- Vorgeschlagenim Katalog · geplant · Geltungsbereich NET
- Zuletzt geprüft
- Bereichsprofil
Nexus Standards (2026). Standards für Energierisiken: Bereichsüberblick, Programm Energie und Kritische Infrastruktur. Vorgeschlagen. https://nexustandards.com/energy-infrastructure/energy-risk-standards/ · UNI NXS-STD-DC-000003. Zuletzt geprüft am 17. Oktober 2026.
Die Dateien enthalten die Quellenangaben und die Lizenzerklärung und werden im Browser erzeugt; es werden keine Daten übertragen. Downloads erfordern JavaScript.
Geltungsbereich und Abgrenzungen
Ein Bereich des Programms Energie und kritische Infrastruktur (Domänen). Das Bereichsprofil legt 5 Themen im Geltungsbereich und 3 Themen dar, die von anderen Bereichen behandelt werden.
Im Geltungsbereich 5
- Anlagendatensätze zu Erzeugung, Übertragung und Verteilung mit Standort und Gefahrenexposition
- Datensätze zu Ausfall- und Wiederherstellungsereignissen mit Ursache und betroffenen Kunden
- Indikatoren zu Versorgungssicherheit und Brennstoffsicherheit
- Datensätze zu Transitionsrisiken (Stranded-Asset-Exposition, politische Szenarien)
- Sektorübergreifende Abhängigkeitsdatensätze für die Kaskadenanalyse
Außerhalb des Geltungsbereichs 3
- Strommarktregeln und Preisbildung
- Sicherheitsnormen für Betriebsmittel und Netzanschlussregeln
- Kommerzielle Handelsdaten
Rechtsräume Die Anwendung in jeder Rechtsordnung ist eine nationale Entscheidung, die der Nationale Standardrat (NSC) mit den zuständigen nationalen Behörden trifft.
Übertragungswege zu verwandten Bereichen und Programmen
Die für diesen Kontext erfassten systemischen Kopplungen, gruppiert nach Übertragungsmechanismus. Der Balken fasst jeden Mechanismus zusammen (zum Filtern einen auswählen); jeder Eintrag benennt den verbundenen Bereich oder das verbundene Programm und beschreibt den Mechanismus.
Die interaktive Ansicht erfordert JavaScript; die folgenden Abschnitte stellen dieselben Datensätze dar.
Kaskaden über gekoppelte Systeme
A shock such as heatwaves and demand peaks is observed through Global Power Plant Database; its effect on energy is recorded and propagated to Water risk standards and Critical infrastructure and critical entities through recorded couplings; cascade obligations are evaluated as clauses; indicators such as SDG 7.1.1 are computed from the records. 7 operations in 5 phases, built from the area profile: the rows carry its own data sources, indicators, open standards, couplings and, where listed, hazards, and each operation names the rules it implements (11). Records and artefacts are cited by UNI (Unique Nexus Identifier) and version.
Prozess-Explorer · Standards · kodifizieren und korrigieren
Lebenszyklus eines Standards
17 Schritte·6 Stufen
Standards · kodifizieren und korrigieren
Lebenszyklus eines Standards
Lebenszyklus eines Standards · NS-13-Verfahren · Beitragskanäle · IETF-Verfahren · W3C-Verfahren · OGC-Verfahren · OASIS-Verfahren · ISO- und IEC-Stufen · Konformität · Lebenszyklus eines Datensatzes · Weiterleitung · Überwachung.
Ergebnisse des Zyklus werden zu Änderungsvorschlägen, der Global Standards Council nimmt sie nach einem öffentlichen Last Call an, und jedes Land entscheidet über seine eigene Übernahme.
01 Missionen zuordnen
- 01Route missions to standards and profilesStep · Nexus StandardsNexus Standards routes each candidate mission to the standards and profiles that apply.
02 Profile und Konformität
- 02Missionsprofile zusammenstellenSchritt · Nexus StandardsNexus Standards stellt Missionsprofile zusammen und dokumentiert jede nationale Annahme, von der die Missionen abhängen.
- 03Aufbauergebnisse gegen die Profile validierenSchritt · Nexus StandardsNexus Standards validiert Build-Ergebnisse anhand der zusammengesetzten Profile und erfasst die Evidenz.
- 04Konformität überwachen und versiegelte Evidenz dokumentierenSchritt · Nexus StandardsWährend der Action Week überwacht Nexus Standards die Konformität und protokolliert Abweichungen.
03 Vorschläge und Prüfung
- 05Abweichungen und Berichtigungen werden zu ÄnderungsvorschlägenSchritt · Nexus StandardsAbweichungen werden zu Änderungsvorschlägen, und die Berichtigung wird als Änderung der Evidenz dokumentiert.
- 06Befunde des Zyklus werden zu ÄnderungsvorschlägenSchritt · Nexus StandardsBefunde eines Zyklus werden zu Änderungsvorschlägen: Methoden- und Korrekturbefunde aus Berichte (F06) und Tagesordnungspunkte aus Nexus…
- 07Offen entwerfen und überarbeitenSchritt · Komitees und ArbeitsgruppenTechnische Komitees und Arbeitsgruppen entwerfen und überarbeiten die Standards im offenen Verfahren nach NS-13.
- 08Prüfung bis zur RatsentscheidungSchritt · Nexus StandardsNexus Standards führt Änderungsvorschläge durch die Prüfung bis zu einer Ratsentscheidung.
04 Entscheidung des Rates
- 09Öffentliche letzte Aufforderung zur StellungnahmeSchritt · Global Standards CouncilDer Global Standards Council nimmt nach einem neunzigtägigen letzten Aufruf mit Zweidrittelmehrheit an.
- 10Globale Verabschiedung eines StandardsEntscheidung · Globaler StandardisierungsratDer Global Standards Council entscheidet nach dem öffentlichen Last Call über die Annahme jedes Standards.
05 Veröffentlichen und identifizieren
- 11UNI vergeben und veröffentlichenSchritt · Sekretariat (GCRI Canada)Nexus Standards vergibt UNIs und hinterlegt Veröffentlichungen nach dem Verfahren des Herausgebers.
- 12Eine UNI identifiziert und zertifiziert nieAufzeichnung · Nexus StandardsJedes Objekt des Programmjahres trägt eine Kennung, eine UNI nach NS-1, damit es zitiert, versioniert und aufgelöst werden kann.
- 13Die im Jahr angenommenen Änderungen veröffentlichenSchritt · Nexus StandardsBei der Erneuerung veröffentlicht Nexus Standards die im Jahr angenommenen Änderungen und den Stand der nationalen Übernahme.
06 Nationale Annahme und Anwendung
- 14Nationale Annahme durch den National Standards CouncilEntscheidung · Nationaler StandardisierungsratDer National Standards Council jedes Landes entscheidet über die nationale Übernahme: unverändert übernehmen, mit einem Profil übernehmen (NS-16), anpassen oder nur darauf verweisen.
- 15Übernommene Standards gelangen in Kurse und AusgabenSchritt · Nexus StandardsJeder übernommene Standard oder jedes Profil wird zu einem Kursmodul in Risk Academy (F09), und Standards werden in den Ausgaben der Berichte angewandt (R1).
- 16Adoption is final for each jurisdictionStandard · National Standards CouncilAdoption is final for each jurisdiction, and the GSC has no veto over a national decision. No global body holds a veto.
- 17Nationale ÜbernahmeaufzeichnungenAufzeichnung · Nexus StandardsZusammengesetzte Missionsprofile und nationale Übernahmenachweise gehen bei der Bereitschaftsvorbereitung (F08) an die Foundry.
Nexus Standards · Nexus Standards (institution) · National Standards CouncilAn outline of the designed programme cycle, not a record of operation: no cycle has run and every programme is at service level R0. Every Nexus Standard is at the PROPOSED stage and nexustandards.com governs the text and status of each one. A UNI identifies and never certifies; a validator report is evidence for review, not a conformance claim.
Die Operationen als Tabelle
| Schritt | Phase | Betrieb | Wer | Entscheidungsregel | Datensatz | Setzt um |
|---|---|---|---|---|---|---|
| 01 | Schock | Schock beobachtet (Beginn). Gefahren und Bedrohungen im Geltungsbereich: Hitzewellen und Nachfragespitzen, Stürme und Eisstürme, Dürre mit Auswirkungen auf Wasserkraft und Kühlung, geomagnetische Störungen und Cyberangriffe auf Betriebstechnik. | die beobachtende Behörde | Beobachtungen sind Datensätze mit Quellveröffentlichungen | Beobachtungen von Hitzewellen und Nachfragespitzen aus der Global Power Plant Database | NS1-R2 |
| 02 | System | Systemzustand (Aufzeichnung). Im Geltungsbereich: Aufzeichnungen zu Anlagen der Erzeugung, Übertragung und Verteilung mit Standort und Gefahrenexposition, Aufzeichnungen zu Ausfall- und Wiederherstellungsereignissen mit Ursache und Zahl betroffener Kunden sowie Indikatoren zu Versorgungssicherheit und Brennstoffsicherheit. | der Systembetreiber | Systemdatensätze tragen UNIs und Versionen | Anlagendatensätze zu Erzeugung, Übertragung und Verteilung mit Standort und Gefahrenexposition | NS1-R1 |
| 03 | System | Wirkungsmodell (Modell). Unsicherheit wird angezeigt, wo sie besteht. | das Modellierungsteam | Modelle tragen eine Modellkarte und zitieren ihre Inputs per UNI | Wirkungsschätzung mit den nächtlichen Lichtdaten NASA Black Marble (VNP46) als Eingabe | NS12-R2, NS5-R3 |
| 04 | Kopplung | Gekoppeltes System (Schritt). Kopplungen dieses Bereichs: Standards für Wasserrisiken, kritische Infrastruktur und kritische Einrichtungen, Standards für Klimarisiken sowie Risikostandards für Weltraumwetter, Frequenzspektrum und Zeitgebung. | das Programm der Standards für Wasserrisiken | Kopplungen sind erfasste Beziehungen mit Evidenz | Gemeinsamer Treiber: Dürre senkt die Leistung der Wasserkraft und begrenzt die Kühlung von Wärmekraftwerken; Netzausfälle stoppen Wasserpumpen und Aufbereitung. | NS0-P9, NS15-R11 |
| 05 | Kopplung | Zweites System (Schritt). Jeder Schritt der Kaskade zitiert die Datensätze, auf denen er beruht. | das Programm Kritische Infrastruktur und kritische Einrichtungen | strittige Beziehungen werden als strittig angezeigt | Kaskade: Stromausfälle breiten sich über voneinander abhängige Netze auf Telekommunikation, Gesundheit, Verkehr und Finanzwesen aus. | NS15-R13 |
| 06 | Verpflichtungen | Kaskadenklauseln (Gate). Nexus Standards dieses Bereichs: NS-0, NS-1, NS-3, NS-9, NS-10, NS-11. | eine evaluierende Stelle mit einem Mandat | Interdependenzen zwischen Domänen werden ausdrücklich behandelt | Bescheinigungen von Kaskadenverpflichtungen, formuliert als NS-10-Klauseln | NS0-P9, NS10-R1, NS11-R1 |
| 07 | Indikatoren | SDG 7.1.1 (end). Indicators of this area: SDG 7.1.1 (Proportion of population with access to electricity), SDG 7.2.1 (Renewable energy share in total final energy consumption) and Sendai Monitor D-5 (Number of disruptions to basic services attributed to disasters). | nationale statistische Ämter und Verwahrer | Indikatoren werden aus Datensätzen berechnet und verweisen auf diese | SDG 7.1.1 (Anteil der Bevölkerung mit Zugang zu Elektrizität) | NS11-R5, NS14-R1 |
Table.Operations in walking order; each row names the phase, the operation, its actor, its decision rule, the record it leaves and the rule identifiers it implements. The table shows the process as specified; it does not report the status of any standard, proposal or record. Sources: OGC API – Features · NGFS climate scenarios · NS-0: Constitution and principles · NS-1: The UNI and the artefact catalogue.
Die Sektoren, die Energierisikostandards beschreiben muss.
Die Sektoren im Geltungsbereich der Standards für Energierisiken und die Beziehungen, die ihre Klauseln explizit machen, damit Datensätze verschiedener Sektoren interoperabel sind.
Signatur
Energie und ihre Partner
Energie liefert Strom für Verkehr und Telekommunikation an die Infrastruktur (0.8), Pumpen und Aufbereitung an Wasser (0.5) sowie Dünger, Maschinen und Kühlketten an Ernährung (0.5).
W · E · I · F · H · B.
- Sektoren
- 4 von 6
- Beziehungen
- 6 von 15
- Kopplung
- 0.46 Anteil am Gesamtwert
Stärkste wirkende Beziehungen
- Energie → Infrastruktur · Strom für Verkehr und Telekommunikation0.8
- Wasser → Energie · Kühlwasser und Wasserkraft0.6
- Wasser → Ernährung · Bewässerung0.8
- Infrastruktur → Wasser · Leitungen, Talsperren und Aufbereitungsanlagen0.6
Systemische Kopplungen
4 Kopplungen verbinden diesen Bereich mit anderen Bereichen und Programmen, jeweils mit dem Mechanismus der Verbindung.
- Standards für WasserrisikenWasser und Ernährung systemeGemeinsamer Treiber: Dürre senkt die Leistung der Wasserkraft und begrenzt die Kühlung von Wärmekraftwerken; Netzausfälle stoppen Wasserpumpen und Aufbereitung.
- Kritische Infrastruktur und kritische EinrichtungenEnergie und kritische InfrastrukturKaskade: Stromausfälle breiten sich über voneinander abhängige Netze auf Telekommunikation, Gesundheit, Verkehr und Finanzwesen aus.
- Standards zu KlimarisikenKlima und ErdsystemeRückkopplung: Transitionspolitik verändert Vermögenswerte und Brennstoffmixe, während der physische Klimawandel Nachfragespitzen und Versorgungssicherheit verändert.
- Standards für Weltraumwetter-, Frequenz- und ZeitgebungsrisikenGefahren und Katastrophen vorsorgeGemeinsame Ursache: Geomagnetische Stürme induzieren Ströme, die Transformatoren beschädigen und die GNSS-Zeitgebung stören, die für die Netzsynchronisation genutzt wird.
Wie sich ein Schock durch dieses System ausbreitet
A system model of this area built from the registry: 18 hazards, 5 systems, 4 sectors, 12 controls, 5 feeds, 4 indicators. Select the components to include, choose an initiating hazard and run the scenario. Stress propagates through the hazard relations of the Nexus Hazard Standard (NHS-1), the exposure of each system, the recorded couplings and the sectors that carry the loss; adopted standards dampen transmission and live data sources support detection. All parameters are stated assumptions that the reader can adjust; results are illustrative scenario outputs for exercises and training, not forecasts or risk assessments. The Map view places the same run on an example geography, Europe, the region of the programme’s context map, with open data: country boundaries, a grid of hexagonal cells and NASA satellite layers for the initiating hazard. The geography serves exercises and training and is not an assessment of that place.
Gefahren
- Hitzewelle
- Sturm
- Großflächiger Stromausfall (stromabwärts ausgelöst)
- Große Waldstörung (nachgelagert ausgelöst)
- Waldbrände (stromabwärts ausgelöst)
- Extremes Brandwetter (stromabwärts ausgelöst)
- Hitzebedingte Netzbelastung (stromabwärts ausgelöst)
- Landwirtschaftliche Dürre (stromabwärts ausgelöst)
- Blitzdürre (nachgelagert ausgelöst)
- Schneedürre (stromabwärts ausgelöst)
- Bodennahe Ozonepisode (nachgelagert ausgelöst)
- Meteorologische Dürre (flussabwärts ausgelöst)
- Extreme nächtliche Hitze (nachgelagert ausgelöst)
- Hitzewelle in Seen und Flüssen (flussabwärts ausgelöst)
- Kühlwasserbeschränkung für Kraftwerke (nachgelagert ausgelöst)
- Hitzebedingte Gleisverwerfung (flussabwärts ausgelöst)
- Eisschub am Ufer (flussabwärts ausgelöst)
- Seiche (flussabwärts ausgelöst)
Systeme und Kopplungen
- Energierisikostandards
- Standards für Wasserrisiken Gemeinsamer Treiber
- Kritische Infrastruktur und kritische Einrichtungen Kaskade
- Standards zu Klimarisiken Rückkopplung
- Standards für Weltraumwetter-, Frequenz- und Zeitgebungsrisiken Gemeinsamer Treiber
Steuerung
NS-0Verfassung und GrundsätzeNS-1Die UNI und der Artefaktkatalog (Grammatik v0.2: Segmente für Domäne, Sektor, Region und Umwelt)NS-3UNIs für Risikodatensätze (Grammatik, Zuordnung zum Altbestand, Vergabestelle)NS-9Kontextuelle UNIs (Bereitstellungen, Instanzen, Programminstanzen)NS-10Richtlinien und Klauseln (maschinenlesbare Verpflichtungen: Definition, Bindung, Evaluierung und Durchsetzung)NS-11Verifizierung und Überwachung (Evidenz, Attestierungen, Zero-Trust-Beobachtung der Konformität)NRS-H84Gefahrenfamilie: Instabilität und Unterdeckung des Energiesystems (NHS-1 infra.energy)NRS-H61Gefahrenfamilie: kaskadierender Ausfall (NHS-1 sys.cascade)NRS-U8Universe-Plattformprofil: Energy NexusNRS-H48Gefahrenfamilie: Ausfall von Versorgungs- und Kommunikationsnetzen (NHS-1 infra.utilities)NRS-H109Gefahrenfamilie: Ausfälle von Technologien der Energiewende (NHS-1 tech.energy-transition)NRS-H54Gefahrenfamilie: Signal- und Plattformstörung (NHS-1 cyber.platform)
Beobachtung
- Global Power Plant Database (zur Referenz aufgeführt)
- NASA-Black-Marble-Nachtlichter (VNP46) (zur Referenz aufgeführt)
- Stromdaten von Ember (zur Referenz aufgeführt)
- ENTSO-E-Transparenzplattform (zur Referenz aufgeführt)
- EIA-Open-Data-API (zur Referenz aufgeführt)
- Anteil der Bevölkerung mit Zugang zu Elektrizität
- Anteil erneuerbarer Energie am gesamten Endenergieverbrauch
- Anzahl der durch Katastrophen verursachten Unterbrechungen grundlegender Dienste
- Schäden an kritischer Infrastruktur infolge von Katastrophen
Beispielgeografie
- Europa: 113 sechseckige Zellen
- Lufttemperatur an der Oberfläche, tagsüber (AIRS), NASA GIBS
- Niederschlagsrate, letzte halbe Stunde (IMERG), NASA GIBS
- Nachtlichter heute Nacht, Ausfälle (VIIRS Day/Night Band), NASA GIBS
- Warnungen zu Vegetationsstörungen, 30 m (OPERA DIST-ALERT), NASA GIBS
Betroffene Gefahren, Bedrohungen und Sektoren
Gefahren und Bedrohungen 6
Sektoren 4
Referenzierte offene Standards
5 offene Standards, jeweils mit ihrer Beziehung, wie sie nach NS-14 im Register erfasst ist. Bewegen Sie den Zeiger auf eine Beziehung oder fokussieren Sie sie, um ihre Definition anzuzeigen.
Datenquellen
5 im Bereichsprofil genannte Datenquellen, jeweils mit Anbieter, Lizenz, Aktualisierungshäufigkeit und Bereitstellungsweg.
Datenquellen sind zur Referenz aufgeführt; Live-Daten werden angezeigt, sobald die Lizenzprüfung abgeschlossen ist.
- Live
- 0
- nach Abschluss der Lizenzprüfung
- Im Datenregister aufgeführt
- 2
- Lizenzbedingungen erfasst
- Für das Register vorgeschlagen
- 3
- Lizenzbedingungen noch zu erfassen
- Durchführung
- 2 gesteuerter Dienst · 0 Plugin · 0 Browser · 2 Snapshot · 1 zur Referenz aufgeführt
- vorgeschlagene Wege in der Reihenfolge der Präferenz: gesteuerter Datendienst, Plugin, direkter Abruf im Browser, Snapshot zur Build-Zeit; Quellen, deren Bedingungen keine Weiterverwendung erlauben, werden nur zur Referenz aufgeführt
Global Power Plant Databasefor reference
World Resources Institute · statische Veröffentlichung (v1.3.0)
CC BY 4.0
gesteuerter Datendienstaufgeführt im Datenregister.
NASA Black Marble Nachtlichter (VNP46)zur Referenz.
NASA Goddard / LAADS DAAC · täglich
NASA Earth science data and information policy (offen)
gesteuerter Datendienstaufgeführt im Datenregister.
EIA Open Data APIfor reference
U.S. Energy Information Administration · hourly to annual.
Werk der US-Regierung, gemeinfrei
Momentaufnahme zum Build-Zeitpunktfür das Datenregister vorgeschlagen
Stromdaten von Emberzur Referenz
Ember · monatlich
CC BY 4.0
Momentaufnahme zum Build-Zeitpunktfür das Datenregister vorgeschlagen
ENTSO-E Transparency Platformfor reference
ENTSO-E · stündlich
ENTSO-E transparency terms and conditions; licence to be recorded by Legal.
zur Referenz aufgeführtfür das Datenregister vorgeschlagen.
Indikatoren
Das Bereichsprofil nennt 4 Indikatoren, jeweils mit ihrem Rahmenwerk und Code.
Namen und Codes der Indikatoren werden so angegeben, wie ihre Sachwalter sie veröffentlichen.
Eingeschränkte Kompatibilitätsprofile
3 Standards, deren Text nicht frei verfügbar ist, werden nur genannt und verlinkt. Jedes Kompatibilitätsprofil bleibt auf geschützten Seiten, bis eine Vereinbarung mit der herausgebenden Stelle besteht.
- IEC 62443 series Security for industrial automation and control systemsIEC TC 65compatibility profile (restricted)
- NERC Critical Infrastructure Protection Reliability StandardsNorth American Electric Reliability Corporationcompatibility profile (restricted)
- ISO 55000:2024 Asset management – Vocabulary, overview and principlesISO/TC 251compatibility profile (restricted)
Geltende Standards
The area profile lists 6 Nexus Standards; the registry lists NS-0, NS-1, NS-3, NS-9, NS-10, NS-11 for this area. Each is a proposed standard under development.
- 01
NS-0 · Verfassung und Grundsätze
Status: proposed · 12 requirements stated. Read NS-0 · Requirements for this area.
- 02
NS-1 · The UNI and the artefact catalogue (grammar v0.2: domain, sector, region and environment segments)
Status: proposed · 10 requirements stated. Read NS-1 · Requirements for this area.
- 03
NS-3 · UNIs für Risikodatensätze (Grammatik, Crosswalk für Altbestände, Vergabebefugnis)
Status: proposed · 0 requirements stated. Read NS-3 · Requirements for this area.
- 04
NS-9 · Kontextbezogene UNIs (Bereitstellungen, Instanzen, Programminstanzen)
Status: proposed · 5 requirements stated. Read NS-9 · Requirements for this area.
- 05
NS-10 · Policies and clauses (machine-readable obligations: definition, binding, evaluation and enforcement)
Status: proposed · 7 requirements stated. Read NS-10 · Requirements for this area.
- 06
NS-11 · Verifizierung und Überwachung (Evidenz, Bestätigungen, Beobachtung der Zero-Trust-Konformität)
Status: proposed · 6 requirements stated. Read NS-11 · Requirements for this area.
Pfade für Evidenz, Anerkennung und Kapital
Was jede Institution des Ökosystems aus diesem Bereich bezieht: das Global Centre for Risk and Innovation (GCRI Canada) als Sekretariat für Evidenz; das Global Risks Forum (GRF) für Anerkennung; und die Global Risks Alliance (GRA) für Kapital.
GCRI Canada
GCRI Canada kann Datensätze zu Ausfällen und Anlagenexposition mit Quellveröffentlichungen und Korrekturhistorie als Evidenz für die Kaskadenforschung behandeln; die Entscheidung liegt bei GCRI Canada nach seinen eigenen Evidenz- und Forschungsregeln.
Das Global Risks Forum (GRF)
Das GRF kann Netzbetreiber und Regulierungsbehörden, die das Profil für Ausfalldatensätze übernehmen, als grenzüberschreitenden Dialogpunkt erfassen; die Entscheidung liegt beim GRF nach seinen eigenen Anerkennungsregeln.
Die Global Risks Alliance (GRA)
Die GRA kann Datensätze zu Transitionsrisiken und physischer Exposition heranziehen, wenn sie Pipelines von Energieprojekten untersucht; die Entscheidung liegt bei der GRA nach ihren eigenen Regeln zur Kapitalbereitschaft.
Jede Institution bestimmt nach ihren eigenen Regeln, was sie als Evidenz akzeptiert; eine Auswertung des Pfades ist weder eine Genehmigung noch eine Anlageberatung.
Werkzeuge für Routing, Überwachung und Verifizierung
Überwachungskonsole
Versions- und Quellenstatus für jeden Standard, wie von den herausgebenden Stellen veröffentlicht.
Verfügbar · läuft im BrowserZuordnungskonsole
Select a sector, hazard family, capability and artefact type; the registry identifies the applicable standards and states the reasons.
Verfügbar · Entwurf im BrowserProfil-Composer
Standards und Klauseln zu einem Profilentwurf mit Quellenangaben in YAML oder JSON kombinieren; es wird nichts eingereicht.
Jede Konsole rechnet auf Grundlage der Registry und legt ihre Begründung dar; Entscheidungen verbleiben bei den zuständigen Stellen.
Satzung der Arbeitsgruppe
Eine vorgeschlagene Charta für diesen Bereich, offen für Institutionen und Fachleute.
Aufzeichnungen zu Ausfällen, Exposition von Anlagen und Transitionsrisiken sowie der Abhängigkeitsgraph, der Energie mit anderen kritischen Diensten verbindet.
Institutionen sowie Expertinnen und Experten sind eingeladen, diese Arbeitsgruppe nach NS-13 durch Einreichen eines öffentlichen Änderungsdatensatzeszu gründen. Nationale Arbeitsgruppen (NWG) steuern nationale Beiträge und Feldübungen über ihr Nationalen Nexus Consortium (NNC) bei.
- Profil für Ausfallereignis-Datensätze mit Ursachencodes und Zeitplan der Wiederherstellung
- Schema des Energieabhängigkeitsgraphen für NS-9-Kontexte
- Crosswalk von Kontrollfamilien für Cyber und Zuverlässigkeit (nur benannt, kein Text wiedergegeben)
- IEA Technology Collaboration Programmes liaison sought
- ENTSO-E Verbindung gesucht
- IRENA Verbindung gesucht
- World Bank Energy Sector Management Assistance Program liaison sought
Vorgesehene Nutzer
Das Bereichsprofil bestimmt 4 Nutzergemeinschaften.
- Übertragungs- und Verteilnetzbetreiber
- Energieregulierungsbehörden
- Klima- und Transitionsrisiken im Finanzwesen
- Planer des Katastrophenschutzes
Offene Forschungsfragen
3 Fragen wurden als Prioritäten für die Arbeitsgruppe identifiziert.
- Ausfalldaten sind oft wirtschaftlich sensibel oder werden von privaten Betreibern gehalten; nächtliche Lichter sind ein Näherungswert mit bekannten Verzerrungen bei Bewölkung und in dünn besiedelten Gebieten.
- Keine gemeinsame Ursachentaxonomie bringt Wetter-, Geräte- und Cyberursachen über Jurisdiktionen hinweg in Einklang.
- Transitionsszenarien (NGFS, IEA) sind nicht für ein Downscaling auf Anlagenebene ausgelegt; daher beruht das Transitionsrisiken auf Anlagenebene auf Annahmen, die ausdrücklich benannt werden müssen.
Registry-Eintrag und Vertiefungsseiten
Dieser Bereich ist im Katalog enthalten (Status: geplant; Geltungsbereich NET; 4 Crosswalk-Domänen). Er verfügt über fünf Vertiefungsseiten und einen Register-Crosswalk seiner Domänen.
Geltende Standards
Die Regeln jedes aufgeführten Standards, gelesen über den Spezifikationsleser.
Tiefe · AbgleichAbgleich
Every register entry in the area’s domains, by relation, with the crosswalk graph.
Vertiefung · Datensätze und SchemataDatensätze und Schemata
Geltungsbereich, Datensatz, Schema-Explorer und wie eine UNI aufgelöst wird.
Vertiefung · KonformitätKonformität
Klauseln, Evidenz und Bescheinigungen für die Konformitätsbewertung.
Vertiefung · BereitschaftBereitschaft
Der Bereich neben den drei Pfaden, als Matrix.
Der Crosswalk als Tabelle: 48 externe Standards nach Domäne
Nexus Standards im Graphen: NS-0, NS-1, NS-3, NS-9, NS-10, NS-11. Eine Relation ist ein Registereintrag, niemals eine Konformitätsbehauptung.
6 Nexus Standards · 4 Domänen · 48 externe Standards · 33 herausgebende Stellen · 0 implementierende Repositorien. Die Beziehungen (übernehmen, profilieren, abgleichen, zitieren) entsprechen den Einträgen im Register; Namen und Standards verbleiben bei ihren Sachwaltern.
Crosswalk graph91 nodes and 120 links from the registry of external standards, programme areas and implementations (the external standards register, the consumers register. Relations (adopt, profile, crosswalk, cite) are shown as recorded in the register.
Areas carry no geography of their own; the map shows where the bodies that issue the area’s external standards are based.
Herausgebende Stellen und ihre Sitze (27)
| Gremium | Sitz | Registereinträge |
|---|---|---|
| NIST | Gaithersburg, Maryland, Vereinigte Staaten | 7 |
| ISO/IEC JTC 1/SC 27 | Genf, Schweiz | 3 |
| GHG Protocol | Washington, District of Columbia, Vereinigte Staaten | 2 |
| IEC TC 57 | Genf, Schweiz | 2 |
| IEC TC 65 | Genf, Schweiz | 2 |
| ISO/TC 207/SC 7 | Genf, Schweiz | 2 |
| ISO/TC 268 | Genf, Schweiz | 2 |
| ISO/TC 299 | Genf, Schweiz | 2 |
| OASIS Cyber Threat Intelligence TC | Woburn, Massachusetts, Vereinigte Staaten | 2 |
| Gemeinsame Forschungsstelle der Europäischen Kommission | Ispra, Italien | 1 |
| Europäisches Parlament und Rat | Brüssel, Belgien | 1 |
| FIRST CVSS Special Interest Group | Cary, North Carolina, Vereinigte Staaten | 1 |
| IEC TC 65 mit ISA (ISA/IEC 62443) | Genf, Schweiz | 1 |
| IEEE | Piscataway, New Jersey, Vereinigte Staaten | 1 |
| IETF | Wilmington, Delaware, Vereinigte Staaten | 1 |
| Zwischenstaatlicher Ausschuss für Klimaänderungen | Genf, Schweiz | 1 |
| International Sustainability Standards Board (IFRS Foundation) | Frankfurt, Deutschland | 1 |
| ISO/IEC JTC 1/SC 39 | Genf, Schweiz | 1 |
| ISO/TC 251 | Genf, Schweiz | 1 |
| ISO/TC 301 | Genf, Schweiz | 1 |
| ISO/TC 59/SC 13 | Genf, Schweiz | 1 |
| ITU-R | Genf, Schweiz | 1 |
| ITU-T SG15 | Genf, Schweiz | 1 |
| Network for Greening the Financial System | Paris, Frankreich | 1 |
| North American Electric Reliability Corporation | Atlanta, Georgia, Vereinigte Staaten | 1 |
| Science Based Targets initiative | London, Vereinigtes Königreich | 1 |
| World Resources Institute und WBCSD (GHG Protocol) | Washington, District of Columbia, Vereinigte Staaten | 1 |
Issuing bodies are shown at the city of their public seat. The 1 programmes, 0 implementing repositories and 19 Nexus Standards have no location and are not mapped · 6 issuing bodies have no single public seat and are listed without a location: IOC-UNESCO Global Ocean Observing System; UNFCCC; International Atomic Energy Agency; International Civil Aviation Organization; International Maritime Organization; United Nations General Assembly.
Standards-Globus27 herausgebende Stellen mit öffentlichem Sitz und 48 Registereinträge, dargestellt in flächentreuen Zellen auf vier Detailstufen. Sitze werden an Stadtkoordinaten platziert; Programmbereiche, Implementierungen und Standards haben keinen Ort und werden nicht gezeichnet. Wo keine Skripte verfügbar sind, wird eine statische Weltkarte angezeigt.
| Bereich auf institutionellen Websites | Artefact kinds | Maßgebliche Standards | Seiten |
|---|---|---|---|
| Energie (Feld-Gateway von GCRI Canada; Gegenstücke bei GRF und GRA) | Daten, Datensatz, Bericht, Karte, Dokumentation | NS-1, NS-3, NS-3b, NS-4, NS-5 | therisk.global/fields/energy/ |
| Ernährungs-, Wasser- und Energieunsicherheit; Netzinstabilität | data, dataset, model, map, report | NS-1, NS-3, NS-3b, NS-5 | therisk.global/challenges/ |
Aus dem Register der Ökosystemabdeckung: Material, das GCRI Canada, Global Risks Forum (GRF) und Global Risks Alliance (GRA) zu diesem Bereich veröffentlichen, wie von der jeweiligen Institution angegeben.
Quellen
4 references from peer-reviewed and official publications cited in the area profile, linked at the publishers’ own sites.
peer-reviewedInfluence of extreme weather and climate change on the resilience of power systems: Impacts and possible mitigation strategiesElectric Power Systems Research · 2015peer-reviewedCatastrophic cascade of failures in interdependent networksNature · 2010peer-reviewedIdentifying, understanding, and analysing critical infrastructure interdependenciesIEEE Control Systems Magazine · 2001- officialClimate Change 2022: Mitigation of Climate Change (AR6 Working Group III)Intergovernmental Panel on Climate Change · 2022
Aktuelle Forschung zu diesem Bereich
Aktuelle begutachtete Artikel, Preprints, Datensätze und Berichte zum Thema dieses Bereichs, zum Zeitpunkt des Lesens aus offenen wissenschaftlichen Metadatendiensten (OpenAlex, Crossref, DataCite, Zenodo, arXiv, Europe PMC, OpenAIRE Graph) mit aus dem Registry gebildeten Suchbegriffen abgerufen. Jedes Werk wird mit Autoren, Publikationsort, Jahr, Typ, Open-Access-Status und Lizenz aufgeführt und verlinkt auf seine DOI oder Landingpage. Quellen, die auf dieser Website noch nicht für die Live-Anzeige freigeschaltet sind, werden zur Referenz aufgeführt und nicht abgefragt.
Search termsheatwaves; demand peaks; windstorms; ice storms; drought affecting hydropower; geomagnetic disturbance; cyber attack on operational technology; fuel supply disruption; OGC API – Features; NGFS climate scenarioscombined with: risk; hazard; early warning; resilience; vulnerability; impact; exposureDerived from the title of the area and the hazards in its profile, the NHS-1 hazards it names and the open standards it lists.
- OpenAlexlisted for reference; not queried
- Crossreflisted for reference; not queried
- DataCitelisted for reference; not queried
- Zenodolisted for reference; not queried
arXivzur Referenz aufgeführt; nicht abgefragt- Europe PMClisted for reference; not queried
- OpenAIRE Graphlisted for reference; not queried
Auf dieser Website ist derzeit keine Quelle für die Live-Anzeige aktiviert: Die Quellen sind zur Orientierung aufgeführt, keine wird abgefragt. Sobald die maßgebliche herausgebende Stelle eine Quelle nach Prüfung ihrer Bedingungen aktiviert, werden hier aktuelle Arbeiten aufgelistet. Nur Metadaten und Links: Titel, Autoren, Publikationsorgan, Jahr, Typ, Open-Access-Status und Lizenz, wie jede Quelle sie erfasst; die Arbeiten werden zur Orientierung aufgeführt, nicht geprüft oder empfohlen.
Kurse und Fachgebiete der Risk Academy
2 Kurse und 3 Disziplinen der Risk Academy (risksacademy.com), die das Wissen und die Methoden dieses Bereichs vermitteln. Jeder Kurs nennt Niveau, Stream und Lernstunden.
Kurse
Disziplinen
Die Zuordnung zwischen Kursen, Fachgebieten und den Nexus Standards wird mit der Risk Academy geführt und unterliegt deren akademischer Prüfung.
Programme, Tracks und Kurse für diesen Bereich
GCRI Canada, The Global Risks Forum (GRF), The Global Risks Alliance (GRA) und Risk Academy arbeiten in unterschiedlichen Rollen zum Gegenstand dieses Bereichs (Forschung und Evidenz; Governance, Politik und Zusammenführung; Kapital, Finanzen und Märkte; Bildung und Ausbildung). Jeder Eintrag gibt an, warum er dem Bereich entspricht und welchen Schritt er anbietet; jede Institution legt ihre eigenen Teilnahmebedingungen fest.
Forschung und Evidenz
GCRI Canada
Forschungsprogramme, die die Beobachtungen, Modelle und Bewertungen hervorbringen, die diese Datensätze beschreiben.
Energy NexusStudies energy security, grids and interconnection, and grid disruption and recovery.Apply to this programme therisk.globalAll programmes of GCRI CanadaGovernance, Politik und Zusammenkünfte
Das Global Risks Forum (GRF)
Foren, die Behörden, Forschende und Institutionen zur Governance gemeinsamer Risiken zusammenbringen.
Governance NexusCompares infrastructure governance across energy systems.Join this track globalriskforum.comAll tracks of The Global Risks ForumKapital, Finanzen und Märkte
Die Global Risks Alliance (GRA)
Branchenprogramme, in denen Finanzinstitute ein gemeinsames Verständnis zum Thema „systemisches Risiko“ aufbauen.
Finanzielle Klima- und NaturrisikenUntersucht Transitionsrisiken und wie die Energiewende Vermögenswerte neu bepreist.Diesem Programm beitreten Asset Management NexusExamines transition finance and infrastructure in investment portfolios.Join this programme globalriskalliance.comAll programmes of The Global Risks AllianceBildung und Weiterbildung
Risk Academy
Kurse und Fachgebiete, die das Wissen und die Methoden vermitteln, die Fachleute zur Anwendung dieser Standards benötigen.
Energy NexusRAN-302 · Intermediate · 20 learning hoursEnergy systems as a backbone of systemic risk across water, food and infrastructureTake this course Gerechter ÜbergangRAF-105 · Einführend · 20,5 LernstundenDie Kosten und Nutzen des Wandels zu einer kohlenstoffarmen Wirtschaft gerecht verteilenDiesen Kurs belegen Alle Kurse und FachgebieteIm Abschnitt Aus- und Weiterbildung dieser Seite aufgeführtSchlüsselbegriffe
- UNI
- Unique Nexus Identifier: a persistent identifier that resolves an artefact to its record.
- vorgeschlagen
- A draft in the open development process that the Global Standards Council has not yet adopted. Each area profile is a proposal to the Nexus Standards registry.
- übernehmen
- Relation, in der der externe Standard wie veröffentlicht verwendet wird und Werte anhand dieses Standards validiert werden.
- zitieren
- Beziehung, in der der externe Standard per Kennung und URL als Referenz zitiert wird.
- Crosswalk
- Beziehung, bei der Klauseln dieser Standards anhand der Klauselnummer Teilen des externen Standards zugeordnet werden, ohne dessen Text wiederzugeben.
- Kompatibilitätsprofil (eingeschränkt)
- Beziehung zu einem Standard, dessen Text nicht offen verfügbar ist: Der Standard wird nur genannt und verlinkt, und ein etwaiges Kompatibilitätsprofil wird auf geschützten Seiten geführt.
- Änderungsdatensatz
- Ein öffentlicher Datensatz einer vorgeschlagenen Änderung nach NS-13, über die die Editoren mit schriftlicher Begründung entscheiden.
- Bestätigung
- An evaluator’s recorded result for one clause and one subject under NS-11.
- Verbindung gesucht
- Eine Verbindung, die die Arbeitsgruppe bei der herausgebenden Stelle beantragen will; eine Verbindung besteht erst, wenn die Stelle sie schriftlich bestätigt.
Verwandte Bereiche
Aktuelle Forschung und Quellen
Begutachtete Artikel, Preprints, Berichte und Datensätze zum Thema dieses Bereichs, zum Zeitpunkt des Lesens aus offenen wissenschaftlichen Metadatendiensten (OpenAlex und Crossref) abgerufen und mit Autoren, Publikationsort, Jahr, Typ und Zugangsstatus aufgeführt, mit einem Link zu jedem Werk. Kuratierte Literaturangaben und verwandte Standards stehen zuerst; aktuelle, nach Thema zugeordnete Arbeiten folgen und dienen der Orientierung.
Kuratierte Literaturangaben
- Influence of extreme weather and climate change on the resilience of power systems: Impacts and possible mitigation strategies
Electric Power Systems Research · 2015 · Peer-reviewed - Identifying, understanding, and analysing critical infrastructure interdependencies
IEEE Control Systems Magazine · 2001 · Peer-reviewed - Catastrophic cascade of failures in interdependent networks
Nature · 2010 · Peer-reviewed - Climate Change 2022: Mitigation of Climate Change (AR6 Working Group III)
Intergovernmental Panel on Climate Change · 2022 · Official publication
Verwandte Standards und Rahmenwerke
- OGC API – Features
Open Geospatial Consortium - NGFS climate scenarios
Network for Greening the Financial System - NIST Cybersecurity Framework 2.0
NIST - Recommendations of the Task Force on Climate-related Financial Disclosures
FSB Task Force on Climate-related Financial Disclosures - GHG Protocol Corporate Accounting and Reporting Standard
World Resources Institute and WBCSD
Suchbegriffe, abgeleitet aus dem Titel des Bereichs und den Gefahren in seinem Profil: Hitzewellen; Nachfragespitzen; Stürme; Eisstürme; Dürre mit Auswirkungen auf die Wasserkraft; geomagnetische Störungen; Cyberangriffe auf Betriebstechnik; Störungen der Brennstoffversorgung; kombiniert mit: Risiko; Gefahr; Frühwarnung; Resilienz; Verwundbarkeit; Auswirkung; Exposition. Bei aktiviertem JavaScript werden aktuelle Arbeiten zu diesen Begriffen aus OpenAlex und Crossref aufgeführt.
Fragen und Antworten.
Welchen Status hat der Bereich Standards für Energierisiken?
Wie werden Datenquellen dargestellt?
Wie kann dieses Briefing geändert werden?
Evidenz von dieser Seite aus beitragen.
Reports ist die vierteljährliche Publikation des Konsortiums. Was Sie über dieses Thema wissen, kann in der nächsten Ausgabe zu Evidenz, einem Fall oder einer Korrektur werden, Ihnen zugeschrieben und unter CC BY 4.0 veröffentlicht, soweit es Ihr eigenes Werk ist.
- EmailGateway GW-STDSend it from this pageEvidence, a correction, a case, a method, a review, a translation or profile input. It arrives tagged with this page, so the editor who owns it receives it.
- ZenodoOpen depositDeposit it and submit to the communityPublish your own record on Zenodo with your ORCID iD, then submit it to the Reports community there. Curators review it; the DOI stays yours.
- ReportsNexus StandardsSee every way to contributeThe contribution types, how each is reviewed, what credit you receive, the licence and what is never accepted.
Senden Sie nie personenbezogene Daten, sensible Infrastrukturdetails oder etwas, das Sie nicht weitergeben dürfen. Ein Beitrag wird vor der Nutzung geprüft; das Einsenden begründet weder Urheberschaft noch redaktionelle Rechte, und Sponsoring erkauft nie ein Ergebnis.
Zu Standards für Energierisiken beitragen
Institutions and experts are invited to propose amendments, join the working group or propose data sources. National participation is organised through each country’s National Nexus Consortium (NNC) and its National Working Groups (NWGs); competent national authorities are engaged through official channels.
Status und Nutzung. Die Nexus Standards sind vorgeschlagene Standards, die in einem offenen Verfahren nach NS-13 entwickelt und zur freiwilligen Nutzung veröffentlicht werden; sie stellen keine Zertifizierung, Akkreditierung oder behördliche Genehmigung dar, und die Annahme bleibt eine Entscheidung des Global Standards Council und, in jedem Land, seines National Standards Council. Eine UNI (Unique Nexus Identifier) identifiziert ein Artefakt; sie zertifiziert es nicht. Die Namen von Normungsorganisationen und ihren Standards gehören deren Trägern und werden nur zur Identifizierung der Dokumente verwendet; kein Text eines externen Standards wird hier wiedergegeben. Nexus Standards ist mit keiner hier genannten Normungsorganisation verbunden, wird von keiner unterstützt und ist von keiner zertifiziert.
Lizenzen: CC BY 4.0 für Standardtexte, Register, Schemata und Daten; Apache-2.0 für Referenzcode. Externe Standards werden mit Name, Nummer und Link unter ihren eigenen Lizenzen zitiert. Daten, Bibliotheken und Schriften Dritter behalten ihre eigenen Lizenzen: siehe Hinweise Dritter.