Amasevisi emandla namagridi
The energy utilities and grids area of the Energy and Critical Infrastructure programme covers generators, transmission and distribution operators, fuel supply and transition programmes: how outage, adequacy, asset and cyber records are identified and verified, and how they crosswalk to grid-security regulation, critical-entity law and industrial control-system security frameworks. Each artefact of the area carries a UNI (Unique Nexus Identifier).
- Nexus Standards: NS-0, NS-3, NS-9, NS-10, NS-11.
- Open standards: NERC Critical Infrastructure Protection reliability standards; NIS2 Directive (EU) 2022/2555; Critical Entities Resilience Directive (EU) 2022/2557; NIST Cybersecurity Framework 2.0; NIST SP 800-161r1 Cybersecurity Supply Chain Risk Management Practices.
- Data and feeds: Global Power Plant Database v1.3.0; ENTSO-E Transparency Platform; World Development Indicators; OECD Data Explorer (incl. Creditor Reporting System, insurance and pension statistics).
- Couples with: Water utilities and basins; Digital, telecom and platforms; Transport, logistics and supply chains; Finance, insurance and capital markets.
- Nexus Standards
- 5
- NS-0, NS-3, NS-9
- Open standards
- 5
- named, never copied
- Data and feeds
- 4
- listed for reference
- Couplings
- 4
- with other areas
- Isimo
- Proposedin the catalogue · planned · scope NET
- Last reviewed
- area profile
Nexus Standards (2026). Energy utilities and grids: area brief, Energy and Critical Infrastructure programme. Proposed. https://nexustandards.com/energy-infrastructure/energy-utilities-sector-standards/ · UNI NXS-STD-DC-000003. Last reviewed 17 October 2026.
Files include the credits and the licence statement and are generated in the browser; no data is transmitted. Downloads require JavaScript.
Scope and boundaries
An area of the Energy and Critical Infrastructure programme (sectors and industries). The area profile sets out 5 matters in scope and 3 matters addressed by other areas.
In scope 5
- Outage, load-shedding and restoration records with asset and time identifiers
- Generation adequacy and fuel-supply records
- Asset condition and climate-exposure records for generation, lines and substations
- Operational-technology cyber incident records and their clause-based obligations
- Transition programme records (renewables build-out, retirements) as contextual UNIs
Out of scope 3
- Electricity market operation, dispatch or pricing
- Engineering protection settings
- Licensing of generators or network operators
Jurisdictions Application in each jurisdiction is a national decision, taken by the National Standards Council (NSC) with the competent national authorities.
Transmission channels to related areas and programmes
The systemic couplings recorded for this context, grouped by transmission mechanism. The bar summarises each mechanism (select one to filter); each entry names the connected area or programme and describes the mechanism.
The interactive view requires JavaScript; the sections below present the same records.
From exposure to attestation
The sector’s exposure to extreme heat and cold, windstorms and wildfire and geomagnetic storms is recorded; obligations derived from NERC Critical Infrastructure Protection reliability standards are written as clauses and bound to each operator’s context; evidence from Global Power Plant Database v1.3.0 is evaluated by an independent evaluator; attestations support disclosure against SDG 7.1.1. 9 operations in 5 phases, built from the area profile: the rows carry its own data sources, indicators, open standards, couplings and, where listed, hazards, and each operation names the rules it implements (14). Records and artefacts are cited by UNI (Unique Nexus Identifier) and version.
Umhloli wezinqubo · Standards · hlela futhi ulungise
Umjikelezo wempilo wezinga
Izinyathelo ezingu-17·Izigaba eziyi-6
Standards · hlela futhi ulungise
Umjikelezo wempilo wezinga
Umjikelezo wempilo wezinga · Indlela ye-NS-13 · Imijelo yeminikelo · Indlela ye-IETF · Indlela ye-W3C · Indlela ye-OGC · Indlela ye-OASIS · Izigaba ze-ISO ne-IEC · Ukuhambisana · Umjikelezo werekhodi · Ukuqondisa · Ukuqapha.
Okutholakele emjikelezweni kuba iziphakamiso zezinguquko, i-Global Standards Council iyamukela ngemva kocingo lokugcina lomphakathi, futhi izwe ngalinye linquma ukwamukela kwalo.
01 Hambisa imishini
- 01Route missions to standards and profilesStep · Nexus StandardsNexus Standards routes each candidate mission to the standards and profiles that apply.
02 Amaphrofayili nokuhambisana
- 02Hlanganisa amaphrofayili emishiniIsinyathelo · Nexus StandardsI-Nexus Standards ihlanganisa amaphrofayili emishini futhi irekhode noma yikuphi ukwamukelwa kukazwelonke imishini ekuncike kukho.
- 03Qinisekisa imiphumela yokwakha ngokuqhathanisa namaphrofayelaIsinyathelo · Nexus StandardsI-Nexus Standards iqinisekisa imiphumela yokwakha ngokumelene namaphrofayela ahlanganisiwe futhi irekhode ubufakazi.
- 04Qapha ukuhambisana futhi ubhale ubufakazi obuvalwe ngophawuIsinyathelo · Nexus StandardsPhakathi neSonto Lokwenza i-Nexus Standards iqapha ukuhambisana futhi irekhode ukuphambuka.
03 Iziphakamiso nokubuyekezwa
- 05Ukuchezuka nokulungiswa kuba yiziphakamiso zoshintshoIsinyathelo · Nexus StandardsUkuchezuka kuba yiziphakamiso zoshintsho, futhi ukulungiswa kubhalwa njengoshintsho kubufakazi.
- 06Izitholakalo zomjikelezo ziba yizincomo zoshintshoIsinyathelo · Nexus StandardsOkutholakele emjikelezweni kuba iziphakamiso zezinguquko: okutholakele ngezindlela nokulungiswa okuvela ku- Imibiko (F06) nezinto zohlu lwamacala ezivela ku-Nexus…
- 07Bhala futhi ubuyekeze obalaIsinyathelo · Amakomidi namaqembu okusebenzaAmakomidi ezobuchwepheshe namaqembu okusebenza abhala futhi abuyekeze amazinga enqubweni evulekile ye-NS-13.
- 08Ukubuyekeza kuya esinqumweni somkhandluIsinyathelo · Nexus StandardsI-Nexus Standards ihambisa izicelo zokuguqula ngokubuyekezwa kuya esinqumweni somkhandlu.
04 Isinqumo somkhandlu
- 09Ubizo lokugcina lomphakathiIsinyathelo · Global Standards CouncilI-Global Standards Council iyamukela ngokuvumelana kwabayingxenye emibili kwezintathu ngemva kobizo lokugcina lezinsuku eziyikhulu namashumiayisishiyagalolunye.
- 10Ukwamukelwa komhlaba wonke kwezingaIsinqumo · Global Standards CouncilI-Global Standards Council inquma ukwamukelwa kwezinga ngalinye ngemva kocingo lokugcina lomphakathi.
05 Shicilela futhi uhlonze
- 11Assign a UNI and publishStep · Secretariat (GCRI Canada)Nexus Standards assigns UNIs and deposits publications under the publisher’s process.
- 12I-UNI iyahlonza futhi ayikaze inikeze isitifiketiIrekhodi · Nexus StandardsYonke into yonyaka wohlelo ithwala isihlonzi esisodwa, i-UNI ngaphansi kwe-NS-1, ukuze icashunwe, ibe nezinguqulo futhi ixazululwe.
- 13Shicilela izinguquko ezamukelwe zonyakaIsinyathelo · Nexus StandardsEkuvuselelweni i-Nexus Standards ishicilela izinguquko ezamukelwe zonyaka nesimo sokwamukelwa kazwelonke.
06 Ukwamukelwa nokusetshenziswa kuzwelonke
- 14Ukwamukelwa kuzwelonke nguMkhandlu Wamazinga KazwelonkeIsinqumo · UMkhandlu Wamazinga KazwelonkeI-National Standards Council yezwe ngalinye inquma ukwamukelwa kazwelonke: yamukela njengoba kunjalo, yamukela nephrofayela (NS-16), guqula, noma ukhombe kuphela.
- 15Amazinga amukelwe afinyelela ezifundweni nasezinhlelweni eziqoqiweIsinyathelo · Nexus StandardsIzinga ngalinye elamukelwe noma iphrofayili iba yimojula yesifundo e-Risk Academy (F09), futhi amazinga asetshenziswa ezinhlelweni eziqoqiwe ze-Reports (R1).
- 16Ukwamukelwa kuyisinqumo sokugcina kwezwe ngalinyeIzinga · National Standards CouncilUkwamukelwa kuyisinqumo sokugcina kwezwe ngalinye, futhi i-GSC ayinalo ilungelo lokuvimba isinqumo sikazwelonke. Alikho ibhodi lomhlaba elinelungelo lokuvimba.
- 17Amarekhodi okwamukelwa kazwelonkeIrekhodi · Nexus StandardsAmaphrofayela emishini ahlanganisiwe namarekhodi okwamukelwa kazwelonke aya ku-Foundry ekulungiseleleni ukulungela (F08).
Nexus Standards · Nexus Standards (institution) · National Standards CouncilAn outline of the designed programme cycle, not a record of operation: no cycle has run and every programme is at service level R0. Every Nexus Standard is at the PROPOSED stage and nexustandards.com governs the text and status of each one. A UNI identifies and never certifies; a validator report is evidence for review, not a conformance claim.
The operations, as a table
| Step | Phase | Operation | Who | Decision rule | Record | Implements |
|---|---|---|---|---|---|---|
| 01 | Ukuchayeka | Exposure (start). Hazards and threats in scope: Extreme heat and cold, Windstorms and wildfire, Geomagnetic storms, Cyber attacks on control systems and Fuel supply disruption. | the operator, with the hazard services | exposure is a record with its sources and their versions | exposure records for extreme heat and cold and windstorms and wildfire | NS2-R4 |
| 02 | Ukuchayeka | Sector records (record). In scope: Outage, load-shedding and restoration records with asset and time identifiers, Generation adequacy and fuel-supply records, Asset condition and climate-exposure records for generation, lines and substations and Operational-technology cyber incident records and their clause-based obligations. | the operator | records carry UNIs and their source releases (NS-3) | Outage, load-shedding and restoration records with asset and time identifiers | NS1-R2 |
| 03 | Izigaba | Cite the source (step). Open standards of this area: NERC Critical Infrastructure Protection reliability standards, NIS2 Directive (EU) 2022/2555, Critical Entities Resilience Directive (EU) 2022/2557 and NIST Cybersecurity Framework 2.0. Their text stays with their bodies. | the sector working group | external obligations are cited, never copied | the obligation cited from NERC Critical Infrastructure Protection reliability standards by identifier and clause number | NS10-R4, NS14-R1 |
| 04 | Izigaba | Write clauses (model). Clauses are composed into a sector policy that enters through a proposal under NS-13. | the sector working group | every obligation is a clause with a UNI; the predicate is data | clauses (NS-10) with conditions over the sector records; relation to NIS2 Directive (EU) 2022/2555 recorded | NS10-R1, NS10-R3, NS13-R1 |
| 05 | Umongo | Bind to operator (step). Each deployment or programme of an operator is a context with its own evidence. | the operator, with the competent authority’s decision | subjects are contextual UNIs; names never bind | the policy bound to the operator’s contextual UNI (NS-9) | NS10-R2, NS9-R3 |
| 06 | Evaluation | Evidence (record). Data sources listed for this area: Global Power Plant Database v1.3.0, ENTSO-E Transparency Platform, World Development Indicators and OECD Data Explorer (incl. Creditor Reporting System, insurance and pension statistics). | the operator, granting read access | evidence resolves or the result is INDETERMINATE | record references, including Global Power Plant Database v1.3.0 | NS11-R3 |
| 07 | Evaluation | Attestation (exercise). Each clause is evaluated outside the operator’s trust boundary. | an independent evaluator with a mandate | subject and evaluator are distinct | attestations per clause with evaluator, mandate, evidence and instant | NS11-R1, NS11-R2 |
| 08 | Disclosure | Report 7.1.1 (record). Indicators of this area: SDG 7.1.1 (Proportion of population with access to electricity), SDG 7.2.1 (Renewable energy share in the total final energy consumption) and Sendai Monitor D-4 (Number of other destroyed or damaged critical infrastructure units and facilities, attributed to disasters). | the operator | displayed values carry their evaluation instant and evaluator | a generated report against SDG 7.1.1 | NS11-R5 |
| 09 | Disclosure | Institutional use (end). Grid-hardening and transition projects can present verified exposure and continuity baselines to the Global Risks Alliance (GRA), which assesses capital readiness under its own rules. | supervisors, investors and partners, each under its own rules | each institution decides under its own rules; a clause result is evidence, not a decision | a decision by the reader of the evidence | NS14-R3 |
Table.Operations in walking order; each row names the phase, the operation, its actor, its decision rule, the record it leaves and the rule identifiers it implements. The table shows the process as specified; it does not report the status of any standard, proposal or record. Sources: NERC Critical Infrastructure Protection reliability standards · NIS2 Directive (EU) 2022/2555 · NS-0: Constitution and principles · NS-3: Risk record UNIs.
The sectors energy utilities and grids has to describe.
The sectors in scope for energy utilities and grids and the relations its clauses make explicit, so records from different sectors interoperate.
Signature
Energy and its partners
Energy gives power for transport and telecoms to infrastructure (0.8), pumping and treatment to water (0.5) and fertiliser, machinery and cold chains to food (0.5).
W · E · I · F · H · B.
- Imikhakha
- 4 kwangu-6
- Ubudlelwano
- 6 kwangu-15
- Ukuhlanganiswa
- 0.46 ingxenye yesamba
Strongest relations in play
- Energy → Infrastructure · power for transport and telecoms0.8
- Water → Energy · cooling water and hydropower0.6
- Water → Food · irrigation0.8
- Infrastructure → Water · pipes, dams and treatment works0.6
Standards that apply
The area profile lists 5 Nexus Standards; the registry lists NS-0, NS-3, NS-9, NS-10, NS-11 for this area. Each is a proposed standard under development.
- 01
NS-0 · Constitution and principles
Status: proposed · 12 requirements stated. Read NS-0 · Requirements for this area.
- 02
NS-3 · Risk record UNIs (grammar, legacy crosswalk, allocation authority)
Status: proposed · 0 requirements stated. Read NS-3 · Requirements for this area.
- 03
NS-9 · Contextual UNIs (deployments, instances, programme instances)
Status: proposed · 5 requirements stated. Read NS-9 · Requirements for this area.
- 04
NS-10 · Policies and clauses (machine-readable obligations: definition, binding, evaluation and enforcement)
Status: proposed · 7 requirements stated. Read NS-10 · Requirements for this area.
- 05
NS-11 · Verification and monitoring (evidence, attestations, zero-trust conformance observation)
Status: proposed · 6 requirements stated. Read NS-11 · Requirements for this area.
How a shock travels through this system
A system model of this area built from the registry: 15 hazards, 5 systems, 1 sector, 11 controls, 4 feeds, 5 indicators. Select the components to include, choose an initiating hazard and run the scenario. Stress propagates through the hazard relations of the Nexus Hazard Standard (NHS-1), the exposure of each system, the recorded couplings and the sectors that carry the loss; adopted standards dampen transmission and live data sources support detection. All parameters are stated assumptions that the reader can adjust; results are illustrative scenario outputs for exercises and training, not forecasts or risk assessments. The Map view places the same run on an example geography, Europe, the region of the programme’s context map, with open data: country boundaries, a grid of hexagonal cells and NASA satellite layers for the initiating hazard. The geography serves exercises and training and is not an assessment of that place.
Izingozi
- Windstorm
- Geomagnetic storm
- Widespread power outage (set off downstream)
- Large forest disturbance (set off downstream)
- Wildfire (set off downstream)
- Geomagnetically induced current (set off downstream)
- Ionospheric disturbance (set off downstream)
- Satellite space-environment anomaly (set off downstream)
- Shoreline ice shove (set off downstream)
- Thermospheric drag surge (set off downstream)
- Radiation-belt electron enhancement (set off downstream)
- Seiche (set off downstream)
- Satellite-navigation disruption (set off downstream)
- Uncontrolled re-entry (set off downstream)
- Satellite communications outage (set off downstream)
Systems and couplings
- Amasevisi emandla namagridi
- Amasevisi amanzi nezindawo zokuqoqa amanzi Ukuhlanganiswa
- Ezedijithali, zonxhumano nezinkundla Ukuhlanganiswa
- Ezokuthutha, ukuhambisa impahla nochungechunge lokuhlinzeka Ukuhlanganiswa
- Finance, insurance and capital markets Coupling
Controls
NS-0Umthethosisekelo nezimisoNS-3Ama-UNI amarekhodi obungozi (uhlelo lolimi, ukuqhathanisa nezinhlelo ezindala, igunya lokwabela)NS-9Ama-UNI omongo (ukufakwa, izibonelo, izibonelo zohlelo)NS-10Izinqubomgomo nezigatshana (izibopho ezifundeka ngomshini: incazelo, ukubophezela, ukuhlola nokuphoqelela)NS-11Ukuqinisekisa nokuqapha (ubufakazi, izifakazelo, ukuqapha ukuhambisana ngaphandle kokwethembana)NRS-H84Umndeni wezingozi: Ukungazinzi nokushoda kwesistimu yamandla (NHS-1 infra.energy)NRS-N2Ubungozi nokuqina kwamandlaNRS-H109Umndeni wezingozi: Ukwehluleka kobuchwepheshe bokushintsha kwamandla (NHS-1 tech.energy-transition)NRS-U8Iphrofayela yeplatifomu ye-Universe: Energy NexusNRS-T12Ubungozi bobuchwepheshe bokushintsha kwamandlaNRS-H53Umndeni wezingozi: Ukuphazamiseka kwedijithali-ngokomzimba (NHS-1 cyber.cyber-physical)
Observation
- Global Power Plant Database v1.3.0 (listed for reference)
- ENTSO-E Transparency Platform (listed for reference)
- World Development Indicators (listed for reference)
- OECD Data Explorer (incl. Creditor Reporting System, insurance and pension statistics) (listed for reference)
- Proportion of population with access to electricity
- Renewable energy share in the total final energy consumption
- Number of other destroyed or damaged critical infrastructure units and facilities, attributed to disasters
- Access to electricity (% of population)
- Electric power transmission and distribution losses (% of output)
Example geography
- Europe: 113 hexagonal cells
- Rain rate, last half hour (IMERG), NASA GIBS
- Night lights tonight, outages (VIIRS Day/Night Band), NASA GIBS
- Vegetation disturbance alerts, 30 m (OPERA DIST-ALERT), NASA GIBS
- Carbon monoxide, smoke transport (AIRS), NASA GIBS
Restricted compatibility profiles
2 standards whose text is not openly available, named and linked only. Any compatibility profile is kept on protected pages until an arrangement with the issuing body is in place.
- ISA/IEC 62443 Industrial automation and control systems securityIEC TC 65 with ISAcompatibility profile (restricted)
- ISO 55000 Asset management – Vocabulary, overview and principlesISO/TC 251compatibility profile (restricted)
Open standards referenced
5 open standards, each with its relation as recorded in the register under NS-14. Hover over or focus a relation for its definition.
Hazards, threats and sectors concerned
Hazards and threats 5
Imikhakha 1
energy-utilitiesUkuxhumana kwezistimu
4 couplings link this area to other areas and programmes, each with the mechanism of the link.
- Water utilities and basinsWater and Food SystemsHydropower output and thermal plant cooling depend on river flow and temperature; low-flow events reduce generation and raise outage risk in both areas.
- Digital, telecom and platformsDigital, Cyber and AIGrid control depends on telecom networks and telecom sites depend on grid power and backup fuel, a two-way dependency that turns a single outage into a cascade.
- Transport, logistics and supply chainsIndustry, Trade and Supply ChainsFuel logistics and electrified transport tie supply disruption to mobility and freight continuity.
- Finance, insurance and capital marketsFinance, Insurance and the EconomyTransition risk on fossil assets and physical risk on grid assets enter bank and insurer exposures through utility balance sheets.
Data sources
4 data sources named in the area profile, each with provider, licence, update frequency and delivery path.
Data sources are listed for reference; live data is displayed once licence review is complete.
- Bukhoma
- 0
- on completion of licence review
- Listed in the data register
- 3
- licence terms recorded
- Proposed for the register
- 1
- licence terms to be recorded
- Delivery
- 2 governed service · 0 plugin · 0 browser · 1 snapshot · 1 listed for reference
- proposed paths in order of preference: governed data service, plugin, direct browser read, build-time snapshot; sources whose terms do not permit reuse are listed for reference only
Global Power Plant Database v1.3.0for reference
World Resources Institute · static (2021)
CC BY 4.0
build-time snapshotlisted in the data register
OECD Data Explorer (incl. Creditor Reporting System, insurance and pension statistics)for reference.
OECD · varies by dataset
CC BY 4.0 unless otherwise stated
governed data servicelisted in the data register.
World Development Indicatorsfor reference
World Bank · annual with quarterly updates
CC BY 4.0
governed data servicelisted in the data register.
ENTSO-E Transparency Platformfor reference
ENTSO-E · near real time
ENTSO-E Transparency Platform terms and conditions (reuse with attribution; to be recorded)
listed for referenceproposed for the data register.
Evidence, recognition and capital pathways
What each institution of the ecosystem draws from this area: The Global Centre for Risk and Innovation (GCRI Canada), as Secretariat, for evidence; The Global Risks Forum (GRF) for recognition; and The Global Risks Alliance (GRA) for capital.
GCRI Canada
Outage and restoration series with asset UNIs and source releases become readable as evidence for GCRI Canada cascade research, which applies its own admissibility rules.
I-Global Risks Forum (GRF)
A grid operator that publishes continuity clauses and attestation history provides GRF with a record trail; recognition remains a GRF decision.
I-Global Risks Alliance (GRA)
Grid-hardening and transition projects can present verified exposure and continuity baselines to GRA, which assesses capital readiness under its own rules.
Each institution determines under its own rules what it accepts as evidence; a pathway reading is neither an approval nor investment advice.
Routing, monitoring and verification tools
Routing console
Select a sector, hazard family, capability and artefact type; the registry identifies the applicable standards and states the reasons.
In progressMonitoring console
Version and source status for each standard, as published by the issuing bodies.
Available · from the registryVerification console
Test suites, conformance statements and attestations for each standard, as recorded in the registry.
Each console computes from the registry and states its reasoning; decisions remain with the competent bodies.
Izinkomba
The area profile names 5 indicators, each with its framework and code.
Indicator names and codes are given as published by their stewards.
Intended users
The area profile identifies 4 user communities.
- Transmission and distribution operators
- Energy regulators and ministries
- Infrastructure investors
- Critical-infrastructure protection agencies
Working group charter
A proposed charter for this area, open to institutions and experts.
Profile outage, adequacy and operational-technology incident records and crosswalk them to grid-security and critical-entity instruments.
Institutions and experts are invited to charter this working group under NS-13 by filing a public change record. National Working Groups (NWGs) contribute national inputs and field exercises through their National Nexus Consortium (NNC).
- Outage and restoration record profile aligned to Sendai D-4 and D-5
- Crosswalk from NS-10 clauses to NERC CIP, NIS2 and the Critical Entities Resilience Directive
- Compatibility profile outline for ISA/IEC 62443, exercised on synthetic data
- International Energy Agency liaison sought
- ENTSO-E liaison sought
- North American Electric Reliability Corporation liaison sought
- IEC TC 57 liaison sought
Open research questions
3 questions identified as priorities for the working group.
- Outage data are published in incompatible formats and resolutions across operators, blocking cross-border cascade analysis.
- Climate-exposure metrics for line and substation assets are not standardised, so physical-risk disclosures cannot be compared.
- Operational-technology incidents are under-reported, and shared records would need confidentiality controls not yet specified.
Registry listing and depth pages
This area is in the catalogue (status: planned; scope NET; 3 crosswalk domains). It has five depth pages and a register crosswalk of its domains.
Standards that apply
The rules of each listed standard, read through the specification reader.
Depth · CrosswalkUkuxhumanisa
Every register entry in the area’s domains, by relation, with the crosswalk graph.
Depth · Records and schemasRecords and schemas
Scope, record, schema explorer and how a UNI resolves.
Depth · ConformanceUkuhambisana
Clauses, evidence and attestations for conformance assessment.
Depth · ReadinessUkulungela
The area alongside the three pathways, as a matrix.
The crosswalk as a table: 36 external standards by domain
Nexus Standards in the graph: NS-0, NS-3, NS-9, NS-10, NS-11. A relation is a register entry, never a compliance claim.
5 Nexus Standards · 3 domains · 36 external standards · 23 issuing bodies · 0 implementing repositories. Relations (adopt, profile, crosswalk, cite) are as recorded in the register; names and standards remain with their stewards.
Crosswalk graph67 nodes and 87 links from the registry of external standards, programme areas and implementations (the external standards register, the consumers register. Relations (adopt, profile, crosswalk, cite) are shown as recorded in the register.
Areas carry no geography of their own; the map shows where the bodies that issue the area’s external standards are based.
Issuing bodies and their seats (19)
| Body | Seat | Register entries |
|---|---|---|
| NIST | Gaithersburg, Maryland, United States | 7 |
| ISO/IEC JTC 1/SC 27 | Geneva, Switzerland | 3 |
| IEC TC 57 | Geneva, Switzerland | 2 |
| IEC TC 65 | Geneva, Switzerland | 2 |
| ISO/TC 268 | Geneva, Switzerland | 2 |
| ISO/TC 299 | Geneva, Switzerland | 2 |
| OASIS Cyber Threat Intelligence TC | Woburn, Massachusetts, United States | 2 |
| European Parliament and Council | Brussels, Belgium | 1 |
| FIRST CVSS Special Interest Group | Cary, North Carolina, United States | 1 |
| IEC TC 65 with ISA (ISA/IEC 62443) | Geneva, Switzerland | 1 |
| IEEE | Piscataway, New Jersey, United States | 1 |
| IETF | Wilmington, Delaware, United States | 1 |
| ISO/IEC JTC 1/SC 39 | Geneva, Switzerland | 1 |
| ISO/TC 251 | Geneva, Switzerland | 1 |
| ISO/TC 301 | Geneva, Switzerland | 1 |
| ISO/TC 59/SC 13 | Geneva, Switzerland | 1 |
| ITU-R | Geneva, Switzerland | 1 |
| ITU-T SG15 | Geneva, Switzerland | 1 |
| North American Electric Reliability Corporation | Atlanta, Georgia, United States | 1 |
Issuing bodies are shown at the city of their public seat. The 1 programmes, 0 implementing repositories and 19 Nexus Standards have no location and are not mapped · 4 issuing bodies have no single public seat and are listed without a location: International Atomic Energy Agency; International Civil Aviation Organization; International Maritime Organization; United Nations General Assembly.
Standards globe19 issuing bodies with a public seat and 36 register entries, shown in equal-area cells at four levels of detail. Seats are placed at city coordinates; programme areas, implementations and standards have no location and are not drawn. A still world map is shown where scripts are unavailable.
| Area on institutional sites | Artefact kinds | Governing standards | Pages |
|---|---|---|---|
| Energy (GCRI Canada field gateway; GRF and GRA counterparts) | data, dataset, report, map, documentation | NS-1, NS-3, NS-3b, NS-4, NS-5 | therisk.global/fields/energy/ |
From the ecosystem coverage register: material that GCRI Canada, The Global Risks Forum (GRF) and The Global Risks Alliance (GRA) publish on this area, as stated by each institution.
Imithombo
5 references from peer-reviewed and official publications cited in the area profile, linked at the publishers’ own sites.
peer-reviewedCatastrophic cascade of failures in interdependent networksNature · 2010peer-reviewedIdentifying, understanding, and analysing critical infrastructure interdependenciesIEEE Control Systems Magazine · 2001- officialDirective (EU) 2022/2557 on the resilience of critical entitiesEuropean Parliament and Council · 2022
- officialPower Systems in TransitionInternational Energy Agency · 2020
- officialLifelines: The Resilient Infrastructure OpportunityWorld Bank · 2019
Recent research on this area
Recent peer-reviewed articles, preprints, datasets and reports on the subject of this area, retrieved at the time of reading from open scholarly metadata services (OpenAlex, Crossref, DataCite, Zenodo, arXiv, Europe PMC, OpenAIRE Graph) with search terms composed from the registry. Each work is listed with its authors, venue, year, type, open-access status and licence, and links to its DOI or landing page. Sources not yet enabled for live display on this site are listed for reference and are not queried.
Search termsextreme heat; windstorms; wildfire; geomagnetic storms; cyber attacks on control systems; fuel supply disruption; NIS2 Directive 2022/2555; NIST Cybersecurity Frameworkcombined with: energy utilities; gridsDerived from the title of the area and the hazards in its profile, the NHS-1 hazards it names and the open standards it lists.
- OpenAlexlisted for reference; not queried
- Crossreflisted for reference; not queried
- DataCitelisted for reference; not queried
- Zenodolisted for reference; not queried
arXivlisted for reference; not queried- Europe PMClisted for reference; not queried
- OpenAIRE Graphlisted for reference; not queried
No source is enabled for live display on this site yet: the sources are listed for reference and none is queried. Once the publisher of record enables a source after its terms are reviewed, recent works are listed here. Metadata and links only: title, authors, venue, year, type, open-access status and licence as each source records them; works are listed for orientation, not reviewed or endorsed.
Risk Academy courses and disciplines
1 course and 4 disciplines of Risk Academy (risksacademy.com) that teach the knowledge and methods of this area. Each course lists its level, stream and learning hours.
Izifundo
Izifundo
The correspondence between courses, disciplines and the Nexus Standards is maintained with Risk Academy and is subject to its academic review.
Programmes, tracks and courses for this area
GCRI Canada, The Global Risks Forum (GRF), The Global Risks Alliance (GRA) and Risk Academy work on the subject of this area in distinct roles (research and evidence; governance, policy and convening; capital, finance and markets; education and training). Each entry states why it corresponds and the step it offers; each institution sets its own terms of participation.
Ucwaningo nobufakazi
GCRI Canada
Research programmes that produce the observations, models and assessments these records describe.
Energy NexusStudies power grids and interconnection, renewables and storage, and recovery after outages.Apply to this programme Cybersecurity and Digital ResilienceStudies cyber risk to critical services, including operational technology in utilities.Apply to this programme therisk.globalAll programmes of GCRI CanadaGovernance, policy and convening
I-Global Risks Forum (GRF)
Tracks that convene public authorities, researchers and institutions on the governance of shared risks.
Governance NexusCompares infrastructure governance and the oversight of utilities.Join this track globalriskforum.comAll tracks of The Global Risks ForumCapital, finance and markets
I-Global Risks Alliance (GRA)
Industry programmes in which financial institutions build a shared understanding of systemic risk.
Development Finance NexusWorks on infrastructure project finance for generation and networks.Join this programme globalriskalliance.comAll programmes of The Global Risks AllianceImfundo nokuqeqeshwa
Risk Academy
Courses and disciplines that teach the knowledge and methods practitioners need to apply these standards.
Energy NexusRAN-302 · Intermediate · 20 learning hoursEnergy systems as a backbone of systemic risk across water, food and infrastructureTake this course All courses and disciplinesListed in the education and training section of this pageAmagama abalulekile
- UNI
- Unique Nexus Identifier: a persistent identifier that resolves an artefact to its record.
- kuphakanyisiwe
- A draft in the open development process that the Global Standards Council has not yet adopted. Each area profile is a proposal to the Nexus Standards registry.
- cite
- Relation in which the external standard is cited by identifier and URL as a reference.
- crosswalk
- Relation in which clauses of these standards are mapped to parts of the external standard by clause number, without reproducing its text.
- compatibility profile (restricted)
- Relation to a standard whose text is not openly available: the standard is named and linked only, and any compatibility profile is kept on protected pages.
- change record
- A public record of a proposed change under NS-13, decided by the editors with written reasons.
- attestation
- An evaluator’s recorded result for one clause and one subject under NS-11.
- liaison sought
- A liaison the working group intends to request from the issuing body; a liaison is established only when the body confirms it in writing.
Related areas
Recent research and sources
Peer-reviewed articles, preprints, reports and datasets on the subject of this area, retrieved at the time of reading from open scholarly metadata services (OpenAlex and Crossref) and listed with authors, venue, year, type and access status, with a link to each work. Curated references and related standards are listed first; recent works matched by subject follow and are listed for orientation.
Curated references
- Power Systems in Transition
International Energy Agency · 2020 · Official publication - Lifelines: The Resilient Infrastructure Opportunity
World Bank · 2019 · Official publication - Catastrophic cascade of failures in interdependent networks
Nature · 2010 · Peer-reviewed - Identifying, understanding, and analysing critical infrastructure interdependencies
IEEE Control Systems Magazine · 2001 · Peer-reviewed - Directive (EU) 2022/2557 on the resilience of critical entities
European Parliament and Council · 2022 · Official publication
Related standards and frameworks
- NERC Critical Infrastructure Protection reliability standards
North American Electric Reliability Corporation - NIS2 Directive (EU) 2022/2555
European Parliament and Council - Critical Entities Resilience Directive (EU) 2022/2557
European Parliament and Council - NIST Cybersecurity Framework 2.0
NIST - NIST SP 800-161r1 Cybersecurity Supply Chain Risk Management Practices
NIST
Search terms, derived from the title of the area and the hazards in its profile: extreme heat; windstorms; wildfire; geomagnetic storms; cyber attacks on control systems; fuel supply disruption; combined with: energy utilities; grids. With JavaScript enabled, recent works matching these terms are listed from OpenAlex and Crossref.
Questions and answers.
What is the status of the Energy utilities and grids area?
How are data sources presented?
How can this brief be amended?
Nikela ngobufakazi kusuka kuleli khasi.
I-Reports iwushicilelo lwekota lwe-Consortium. Lokho okwaziyo ngalesi sihloko kungaba ubufakazi, icala noma ukulungiswa kuhlelo olulandelayo, kubongwe wena futhi kushicilelwe ngaphansi kwe-CC BY 4.0 lapho kungumsebenzi wakho.
- I-imeyiliIsango GW-STDYithumele kuleli khasiUbufakazi, ukulungiswa, icala, indlela, ukubuyekeza, ukuhumusha noma okufakwayo kwephrofayili. Ifika ifakwe uphawu lwaleli khasi, ukuze umhleli walo ayithole.
- ZenodoOpen depositDeposit it and submit to the communityPublish your own record on Zenodo with your ORCID iD, then submit it to the Reports community there. Curators review it; the DOI stays yours.
- ReportsNexus StandardsSee every way to contributeThe contribution types, how each is reviewed, what credit you receive, the licence and what is never accepted.
Ungalokothi uthumele idatha yomuntu siqu, imininingwane ebucayi yengqalasizinda noma noma yini ongenalo ilungelo lokuyabelana ngayo. Umnikelo ubuyekezwa ngaphambi kokusetshenziswa; ukuwuthumela akunikezi ubuqambi noma amalungelo okuhlela, futhi ukusekela akuthengi muphumela.
Contribute to Energy utilities and grids
Institutions and experts are invited to propose amendments, join the working group or propose data sources. National participation is organised through each country’s National Nexus Consortium (NNC) and its National Working Groups (NWGs); competent national authorities are engaged through official channels.
Isimo nokusetshenziswa. Ama-Nexus Standards angamazinga ahlongozwayo athuthukiswe ngenqubo evulekile ngaphansi kwe-NS-13 futhi ashicilelwe ukuze asetshenziswe ngokuzithandela; akusona isitifiketi, ukugunyazwa noma imvume yomlawuli, futhi ukwamukela kuhlala kuyisinqumo se-Global Standards Council futhi, ezweni ngalinye, se-National Standards Council yalo. I-UNI (Unique Nexus Identifier) ihlonza into; ayiyiqinisekisi. Amagama ezinhlaka zamazinga namazinga azo angawabaphathi bawo futhi asetshenziswa kuphela ukuhlonza amadokhumenti; awukho umbhalo wezinga langaphandle okhiqizwe kabusha lapha. I-Nexus Standards ayihlangene, ayesekwa futhi ayiqinisekiswanga yinoma iyiphi inhlangano yamazinga eshiwo lapha.
Amalayisense: i-CC BY 4.0 embhalweni wezindinganiso, amarejista, amaskimu nedatha; i-Apache-2.0 kukhodi yereferensi. Izindinganiso zangaphandle zicashunwa ngegama, inombolo nesixhumanisi ngaphansi kwamalayisense azo. Idatha, amalabhulali namafonti abantu besithathu agcina amalayisense awo: bheka Izaziso zabantu besithathu.