Skip to content
StandardsFinance, Insurance and the EconomyRisk disciplines
Area · proposed

Disaster and climate risk finance

Pre-arranged finance (parametric insurance, risk pools, contingent credit and catastrophe bonds) can speed response and protect budgets, but it depends on trusted triggers, loss data and transparent terms. This area of the Finance, Insurance and the Economy programme sets records for trigger definitions, basis risk, payouts and programme terms so that governments, pools and investors evaluate instruments on shared, verifiable evidence. Each artefact of the area carries a UNI (Unique Nexus Identifier).

Disaster and climate risk finance
What this area is built from: the Nexus Standards it applies, the open standards it names and the data and feeds it reads, then the areas its record couples it with (marked).Source: the Nexus Standards registry: the area record.
  • Nexus Standards: NS-0, NS-3, NS-9, NS-10, NS-11, NS-14.
  • Open standards: Sendai Framework for Disaster Risk Reduction 2015–2030; Common Alerting Protocol Version 1.2; IATI Standard 2.03; Open Contracting Data Standard.
  • Data and feeds: ERA5 reanalysis (Copernicus Climate Data Store); CHIRPS quasi-global gridded precipitation; USGS earthquake GeoJSON summary feeds.
  • Couples with: Early warning and anticipatory action; Disaster risk reduction; Financial stability and prudential risk; Hydrometeorological hazard.
Nexus Standards
6
NS-0, NS-3, NS-9
Open standards
4
named, never copied
Data and feeds
3
listed for reference
Couplings
4
with other areas
UNI
requested · allocation in progress
Imeko
Proposednot yet in the catalogue
Last reviewed
area profile
Cite this page

Nexus Standards (2026). Disaster and climate risk finance: area brief, Finance, Insurance and the Economy programme. Proposed. https://nexustandards.com/finance/disaster-and-climate-risk-finance/. Last reviewed 17 October 2026.

Download the profile

Files include the credits and the licence statement and are generated in the browser; no data is transmitted. Downloads require JavaScript.

01Ubungakanani bomsebenzi

Scope and boundaries

An area of the Finance, Insurance and the Economy programme (risk disciplines). The area profile sets out 5 matters in scope and 3 matters addressed by other areas.

In scope 5

  • Parametric trigger and index records
  • Basis-risk evaluation records
  • Payout and disbursement records
  • Programme term records (layers, attachment points)
  • Risk pool membership records

Out of scope 3

  • Insurance pricing models
  • Investment advice
  • Regulatory capital calculations

Jurisdictions Application in each jurisdiction is a national decision, taken by the National Standards Council (NSC) with the competent national authorities.

02Ukudibana kweenkqubo

Transmission channels to related areas and programmes

The systemic couplings recorded for this context, grouped by transmission mechanism. The bar summarises each mechanism (select one to filter); each entry names the connected area or programme and describes the mechanism.

The interactive view requires JavaScript; the sections below present the same records.

03Inkqubo yokusebenza

From question to decision use

A question is framed in a stated context; data from ERA5 reanalysis (Copernicus Climate Data Store) is assembled with its provenance; the method is documented and its uncertainty quantified; results are validated by an independent evaluator and published as a product with derivation relations; decision makers use it under their own mandate. 7 operations in 5 phases, built from the area profile: the rows carry its own data sources, indicators, open standards, couplings and, where listed, hazards, and each operation names the rules it implements (9). Records and artefacts are cited by UNI (Unique Nexus Identifier) and version.

Umhloli weenkqubo · Standards · ukuchaza nokulungisa

Umjikelo wobomi bomgangatho

Amanyathelo ali-17Izigaba ezi-6

Standards · ukuchaza nokulungisa

Umjikelo wobomi bomgangatho

Umjikelo wobomi bomgangatho · Indlela ye-NS-13 · Iindlela zokunikela · Indlela ye-IETF · Indlela ye-W3C · Indlela ye-OGC · Indlela ye-OASIS · Izigaba ze-ISO ne-IEC · Ukuhambelana · Umjikelo wobomi werekhodi · Ukuthumela · Ukubeka iliso.

Iziphumo zomjikelo ziba ziziphakamiso zotshintsho, iBhunga leMigangatho yeHlabathi liyamkela emva komnxeba wokugqibela woluntu, kwaye ilizwe ngalinye ligqiba ukwamkela kwalo.

  1. 01 Thumela iimishini

    1. 01Route missions to standards and profilesStep · Nexus StandardsNexus Standards routes each candidate mission to the standards and profiles that apply.
  2. 02 Iiprofayile nokuhambelana

    1. 02Qamba iiprofayile zeemishiniInyathelo · Nexus StandardsI-Nexus Standards iqamba iiprofayile zeemishini kwaye ibhale nakuphi na ukwamkelwa kwesizwe iimishini ezixhomekeke kuko.
    2. 03Qinisekisa iziphumo zokwakha ngokwamaprofayileInyathelo · Nexus StandardsI-Nexus Standards iqinisekisa iziphumo zokwakha ngokwamaprofayile aqanjiweyo kwaye ibhale ubungqina.
    3. 04Beka iliso kukuhambelana uze ubhale ubungqina obutywiniweyoInyathelo · Nexus StandardsNgexesha leVeki yeNtshukumo i-Nexus Standards ibeka iliso kukuhambelana kwaye ibhale ukuphambuka.
  3. 03 Iziphakamiso nophononongo

    1. 05Ukuphambuka nolungiso ziba ziziphakamiso zotshintshoInyathelo · Nexus StandardsUkuphambuka kuba ziziphakamiso zotshintsho, kwaye ulungiso lubhalwa njengotshintsho kubungqina.
    2. 06Iziphumo zomjikelo ziba ziziphakamiso zotshintshoInyathelo · Nexus StandardsIziphumo zomjikelo ziba ziziphakamiso zotshintsho: iziphumo zendlela nezolungiso ezivela Iingxelo (F06) nezinto zedokethi ezivela kwi-Nexus…
    3. 07Yila uze uhlaziye ekuhleniInyathelo · Iikomiti namaqela asebenzayoIikomiti zobugcisa namaqela asebenzayo ayila kwaye ahlaziye imigangatho kwinkqubo evulekileyo ye-NS-13.
    4. 08Uphononongo olusingise kwisigqibo sebhungaInyathelo · Nexus StandardsI-Nexus Standards ihambisa iziphakamiso zotshintsho kuphononongo zisingise kwisigqibo sebhunga.
  4. 04 Isigqibo sebhunga

    1. 09Umnxeba wokugqibela woluntuInyathelo · IBhunga leMigangatho yeHlabathiIBhunga leMigangatho yeHlabathi liyamkela ngesininzi sesibini kwisithathu emva komnxeba wokugqibela weentsuku ezingamashumi alithoba.
    2. 10Ukwamkelwa kwehlabathi komgangathoIsigqibo · IBhunga leMigangatho yeHlabathiIBhunga leMigangatho yeHlabathi ligqiba ukwamkelwa komgangatho ngamnye emva komnxeba wokugqibela woluntu.
  5. 05 Papasha uze uchonge

    1. 11Assign a UNI and publishStep · Secretariat (GCRI Canada)Nexus Standards assigns UNIs and deposits publications under the publisher’s process.
    2. 12I-UNI iyachonga kwaye ayize iqinisekiseIrekhodi · Nexus StandardsYonke into yonyaka wenkqubo ithwele isichongi esinye, i-UNI phantsi kwe-NS-1, ukuze icatshulwe, inikwe iinguqulelo kwaye isonjululwe.
    3. 13Papasha utshintsho olwamkelweyo lonyakaInyathelo · Nexus StandardsEkuhlaziyweni i-Nexus Standards ipapasha utshintsho olwamkelweyo lonyaka nemeko yokwamkelwa kwesizwe.
  6. 06 Ukwamkelwa nokusetyenziswa kwesizwe

    1. 14Ukwamkelwa kwesizwe liBhunga leMigangatho leSizweIsigqibo · IBhunga leMigangatho leSizweIBhunga leMigangatho leSizwe lelizwe ngalinye ligqiba ukwamkelwa kwesizwe: yamkela njengoko injalo, yamkela ngeprofayile (NS-16), lungelelanisa, okanye bhekisa kuphela.
    2. 15Imigangatho eyamkelweyo ifikelela kwizifundo nakwiinguquleloInyathelo · Nexus StandardsUmgangatho ngamnye owamkelweyo okanye iprofayile iba yimodyuli yekhosi kwi-Risk Academy (F09), kwaye imigangatho isetyenziswa kwiinguqulelo ze-Reports (R1).
    3. 16Ukwamkelwa kugqibelele kummandla wolawulo ngamnyeUmgangatho · IBhunga leMigangatho leSizweUkwamkelwa kugqibelele kummandla wolawulo ngamnye, kwaye i-GSC ayinalo ilungelo lokuvala isigqibo sesizwe. Akukho qumrhu lehlabathi linelungelo lokuvala.
    4. 17Iirekhodi zokwamkelwa kwesizweIrekhodi · Nexus StandardsIiprofayile zeemishini eziqanjiweyo neerekhodi zokwamkelwa kwesizwe ziya kwi-Foundry ngexesha lokulungiselela ukulungela (F08).

Nexus Standards · Nexus Standards (institution) · National Standards CouncilAn outline of the designed programme cycle, not a record of operation: no cycle has run and every programme is at service level R0. Every Nexus Standard is at the PROPOSED stage and nexustandards.com governs the text and status of each one. A UNI identifies and never certifies; a validator report is evidence for review, not a conformance claim.

The operations, as a table
Process · the method from question to decision use7 operations · 5 phases
InyatheloPhaseUkusebenzaWhoDecision ruleIrekhodiImplements
01QuestionFrame the question (start). In scope: Parametric trigger and index records, Basis-risk evaluation records and Payout and disbursement records.the decision maker and the analystthe context is explicit and carries a contextual UNIParametric trigger and index recordsNS9-R1
02IdathaAssemble data (record). Data sources listed for reference: ERA5 reanalysis (Copernicus Climate Data Store), CHIRPS quasi-global gridded precipitation and USGS earthquake GeoJSON summary feeds.the analystinputs are cited by UNI and versionrecords from ERA5 reanalysis (Copernicus Climate Data Store)NS2-R2, NS2-R4
03Indlela yokusebenzaMethod (model). Open references: Sendai Framework for Disaster Risk Reduction 2015–2030, Common Alerting Protocol Version 1.2 and IATI Standard 2.03.the analystmodels carry a model card with intended use and limitationsthe method, documented with reference to Sendai Framework for Disaster Risk Reduction 2015–2030NS12-R2
04Indlela yokusebenzaUncertainty (step). Assumptions are stated with the result.the analystuncertainty is shown where it exists; nothing is coerced to a valueintervals, ensembles and missingness statedNS5-R3, NS11-R3
05UkuqinisekiswaValidate (exercise). Golden-value tests and back-tests are recorded with their versions.an independent evaluator with a mandatesubject and evaluator are distinctattestations of reproducibility and of the stated testsNS11-R1, NS11-R2
06SebenzisaProduct (record). The product’s correction dependencies let a correction reach every result.the publisher of recorda product cites its records; figures follow NS-5a product with derivation relations, reporting against Sendai Monitor F-1NS2-R4, NS5-R2
07SebenzisaDecision use (end). The decision record cites the product version it relied on.the decision maker, under its own mandatea product informs a decision; it does not make ita decision citing the product by UNI and versionNS2-R2

Table.Operations in walking order; each row names the phase, the operation, its actor, its decision rule, the record it leaves and the rule identifiers it implements. The table shows the process as specified; it does not report the status of any standard, proposal or record. Sources: Sendai Framework for Disaster Risk Reduction 2015–2030 · Common Alerting Protocol Version 1.2 · NS-0: Constitution and principles · NS-3: Risk record UNIs.

04Ukudibana kweenkqubo

Ukudibana kweenkqubo

4 couplings link this area to other areas and programmes, each with the mechanism of the link.

  1. Early warning and anticipatory actionEarly Warning and Anticipatory ActionMechanism: triggers link forecasts to fund release.
  2. Disaster risk reductionHazards and Disaster Risk ReductionFeedback: loss data inform pricing; finance shapes recovery speed.
  3. Financial stability and prudential riskFinance, Insurance and the EconomyCascade: catastrophe losses affect insurer solvency and sovereign budgets.
  4. Hydrometeorological hazard standardsHazards and Disaster Risk ReductionMechanism: parametric indices depend on hazard observation records.
05System model

How a shock travels through this system

A system model of this area built from the registry: 18 hazards, 5 systems, 4 sectors, 12 controls, 3 feeds, 2 indicators. Select the components to include, choose an initiating hazard and run the scenario. Stress propagates through the hazard relations of the Nexus Hazard Standard (NHS-1), the exposure of each system, the recorded couplings and the sectors that carry the loss; adopted standards dampen transmission and live data sources support detection. All parameters are stated assumptions that the reader can adjust; results are illustrative scenario outputs for exercises and training, not forecasts or risk assessments. The Map view places the same run on an example geography, Western Europe, the region of the programme’s context map, with open data: country boundaries, a grid of hexagonal cells and NASA satellite layers for the initiating hazard. The geography serves exercises and training and is not an assessment of that place.

Iingozi

  • Tropical cyclone
  • Earthquake
  • Ice-jam flood
  • Ukunyuka kolwandle ngenxa yesaqhwithi (ubangela iziphumo ezilandelayo)
  • Intense rainfall (set off downstream)
  • River flood (set off downstream)
  • Flash flood (set off downstream)
  • Dangerous surf (set off downstream)
  • Ukuqhawuka kombane okuxhaphakileyo (kubangela iziphumo ezilandelayo)
  • Ukufuduswa kwabantu abaninzi (kubangela iziphumo ezilandelayo)
  • Coastal flood (set off downstream)
  • Aftershock sequence (set off downstream)
  • Fault surface rupture (set off downstream)
  • Soil liquefaction (set off downstream)
  • Slope slide (set off downstream)
  • Rockfall (set off downstream)
  • Tsunami (set off downstream)
  • Building collapse (set off downstream)

Izilawuli

  • NS-0 Umgaqo-siseko nemigaqo
  • NS-3 Ii-UNI zerekhodi yomngcipheko (igrama, uthelekiso lwakudala, igunya lokwabiwa)
  • NS-9 Ii-UNI zemeko (ukusasazwa, iimeko, iimeko zenkqubo)
  • NS-10 Imigaqo-nkqubo namagatya (izibophelelo ezifundeka ngoomatshini: inkcazo, ukubopha, uvavanyo nokunyanzeliswa)
  • NS-11 Ukuqinisekiswa nokubekwa kweliso (ubungqina, iziqinisekiso, uqwalaselo lokuhambelana ngaphandle kokuthemba)
  • NS-14 Ukuhambelana nokuthelekiswa nemigangatho yangaphandle
  • NRS-F8 Ukudluliselwa komngcipheko okusekelwe kwiiparameter nakwizalathisi
  • NRS-F7 Ezemali zomngcipheko weentlekele nezemali ezicwangciswe kwangaphambili
  • NRS-H113 Usapho lweengozi: Ubuthathaka benkqubo yezemali (NHS-1 soc.financial-system)
  • NRS-H114 Usapho lweengozi: Ukothuka kwezoqoqosho jikelele nezimali zikarhulumente (NHS-1 soc.macro-fiscal)
  • NRS-D1 Uphuhliso olwaziswe ngumngcipheko nokuhlolwa kweeprojekthi
  • NRS-H28 Usapho lweengozi: Utshintsho kwimeko yemozulu (NHS-1 eco.climate-state)

Uqwalaselo

  • ERA5 reanalysis (Copernicus Climate Data Store) (listed for reference)
  • CHIRPS quasi-global gridded precipitation (listed for reference)
  • USGS earthquake GeoJSON summary feeds (listed for reference)
  • Total public international support for national disaster risk reduction actions (Sendai indicator F-1)
  • Direct economic loss attributed to disasters in relation to global GDP

Umzekelo wejografi

  • Western Europe: 152 hexagonal cells
  • Isantya semvula, isiqingatha seyure esidlulileyo (IMERG), NASA GIBS
  • Izibane zasebusuku namhlanje, ukuqhawuka kombane (VIIRS Day/Night Band), NASA GIBS
  • Amanzi aphezu komhlaba phantsi kwamafu, 30 m (OPERA DSWx-S1 radar), NASA GIBS
  • Surface soil moisture (SMAP), NASA GIBS
06Imigangatho

Imigangatho esebenzayo

The area profile lists 6 Nexus Standards. Each is a proposed standard under development.

  1. 01

    NS-0 · Constitution and principles

    Status: proposed · 12 requirements stated. Read NS-0.

  2. 02

    NS-3 · Risk record UNIs (grammar, legacy crosswalk, allocation authority)

    Status: proposed · 0 requirements stated. Read NS-3.

  3. 03

    NS-9 · Contextual UNIs (deployments, instances, programme instances)

    Status: proposed · 5 requirements stated. Read NS-9.

  4. 04

    NS-10 · Policies and clauses (machine-readable obligations: definition, binding, evaluation and enforcement)

    Status: proposed · 7 requirements stated. Read NS-10.

  5. 05

    NS-11 · Verification and monitoring (evidence, attestations, zero-trust conformance observation)

    Status: proposed · 6 requirements stated. Read NS-11.

  6. 06

    NS-14 · Conformance and crosswalk to external standards

    Status: proposed · 5 requirements stated. Read NS-14.

07Izalathisi

Izalathisi

The area profile names 2 indicators, each with its framework and code.

09Hazards and sectors

Hazards, threats and sectors concerned

Hazards and threats 5

Tropical cyclonesEarthquakesDroughtFloodsPandemics

Amacandelo 4

Finance, insurance and capital marketsPublic sector and governmentInternational organisations and multilateralsHumanitarian and civil society
10Data sources

Data sources

3 data sources named in the area profile, each with provider, licence, update frequency and delivery path.

Data sources

Data sources are listed for reference; live data is displayed once licence review is complete.

Ngoku
0
on completion of licence review
Listed in the data register
3
licence terms recorded
Proposed for the register
0
licence terms to be recorded
Delivery
2 governed service · 0 plugin · 0 browser · 1 snapshot · 0 listed for reference
proposed paths in order of preference: governed data service, plugin, direct browser read, build-time snapshot; sources whose terms do not permit reuse are listed for reference only
12Restricted standards

Restricted compatibility profiles

Standards whose text is not openly available are named and linked only. Any compatibility profile is kept on protected pages until an arrangement with the issuing body is in place.

The working group may identify restricted standards relevant to this area; they are listed here by name and link.

13Ukulungela

Evidence, recognition and capital pathways

What each institution of the ecosystem draws from this area: The Global Centre for Risk and Innovation (GCRI Canada), as Secretariat, for evidence; The Global Risks Forum (GRF) for recognition; and The Global Risks Alliance (GRA) for capital.

Evidence pathway

GCRI Canada

GCRI Canada may accept trigger and payout records with index source and basis-risk analysis as research evidence; the decision rests with GCRI Canada under its own evidence and research rules.

Read the evidence pathway

Indlela yokwamkelwa

I-Global Risks Forum (GRF)

GRF may record programmes publishing terms on the shared records as a transparency dialogue; the decision rests with GRF under its own recognition rules.

Read the recognition pathway

Indlela yemali

I-Global Risks Alliance (GRA)

GRA may read trigger, basis-risk and payout records when it considers risk-finance instruments; the decision rests with GRA under its own capital-readiness rules.

Read the capital pathway

Each institution determines under its own rules what it accepts as evidence; a pathway reading is neither an approval nor investment advice.

14Iqela elisebenzayo

Working group charter

A proposed charter for this area, open to institutions and experts.

Ubungakanani bomsebenzi

Trigger, basis-risk, payout and programme-term records for pre-arranged finance.

Institutions and experts are invited to charter this working group under NS-13 by filing a public change record. National Working Groups (NWGs) contribute national inputs and field exercises through their National Nexus Consortium (NNC).

Deliverables · 3
  1. Parametric trigger record
  2. Basis-risk evaluation record
  3. Programme term record
Liaison targets · 4
  • Insurance Development Forum liaison sought
  • World Bank Crisis Risk Finance team liaison sought
  • Global Shield against Climate Risks secretariat liaison sought
  • Centre for Disaster Protection liaison sought
15Research questions

Open research questions

3 questions identified as priorities for the working group.

  1. Basis risk is rarely reported publicly.
  2. Programme terms are often confidential.
  3. Index data licences may restrict reuse.
16Audiences

Intended users

The area profile identifies 4 user communities.

  1. Ministries of finance
  2. Risk pool managers
  3. Abaneinshorensi nabaneinshorensi yesibini
  4. Amaziko ezemali zophuhliso
17Imithombo

Imithombo

3 references from peer-reviewed and official publications cited in the area profile, linked at the publishers’ own sites.

18Research hub

Recent research on this area

Recent peer-reviewed articles, preprints, datasets and reports on the subject of this area, retrieved at the time of reading from open scholarly metadata services (OpenAlex, Crossref, DataCite, Zenodo, arXiv, Europe PMC, OpenAIRE Graph) with search terms composed from the registry. Each work is listed with its authors, venue, year, type, open-access status and licence, and links to its DOI or landing page. Sources not yet enabled for live display on this site are listed for reference and are not queried.

Search termstropical cyclones; earthquakes; drought; floods; pandemics; tropical cyclone; earthquake; ice-jam flood; Common Alerting Protocol; IATI Standardcombined with: risk; hazard; early warning; resilience; vulnerability; impact; exposureDerived from the title of the area and the hazards in its profile, the NHS-1 hazards it names and the open standards it lists.

  • OpenAlexlisted for reference; not queried
  • Crossreflisted for reference; not queried
  • DataCitelisted for reference; not queried
  • Zenodolisted for reference; not queried
  • arXivlisted for reference; not queried
  • Europe PMClisted for reference; not queried
  • OpenAIRE Graphlisted for reference; not queried

No source is enabled for live display on this site yet: the sources are listed for reference and none is queried. Once the publisher of record enables a source after its terms are reviewed, recent works are listed here. Metadata and links only: title, authors, venue, year, type, open-access status and licence as each source records them; works are listed for orientation, not reviewed or endorsed.

20Kuyo yonke inethiwekhi

Programmes, tracks and courses for this area

GCRI Canada, The Global Risks Forum (GRF), The Global Risks Alliance (GRA) and Risk Academy work on the subject of this area in distinct roles (research and evidence; governance, policy and convening; capital, finance and markets; education and training). Each entry states why it corresponds and the step it offers; each institution sets its own terms of participation.

Governance, policy and convening

I-Global Risks Forum (GRF)

Tracks that convene public authorities, researchers and institutions on the governance of shared risks.

Capital NexusConvenes dialogue on resilience finance governance.Join this track globalriskforum.comAll tracks of The Global Risks Forum
21Amagama aphambili

Amagama aphambili

UNI
Unique Nexus Identifier: a persistent identifier that resolves an artefact to its record.
kuphakanyisiwe
A draft in the open development process that the Global Standards Council has not yet adopted. Each area profile is a proposal to the Nexus Standards registry.
crosswalk
Relation in which clauses of these standards are mapped to parts of the external standard by clause number, without reproducing its text.
cite
Relation in which the external standard is cited by identifier and URL as a reference.
change record
A public record of a proposed change under NS-13, decided by the editors with written reasons.
attestation
An evaluator’s recorded result for one clause and one subject under NS-11.
liaison sought
A liaison the working group intends to request from the issuing body; a liaison is established only when the body confirms it in writing.
23Uphando

Recent research and sources

Peer-reviewed articles, preprints, reports and datasets on the subject of this area, retrieved at the time of reading from open scholarly metadata services (OpenAlex and Crossref) and listed with authors, venue, year, type and access status, with a link to each work. Curated references and related standards are listed first; recent works matched by subject follow and are listed for orientation.

Curated references

Related standards and frameworks

Search terms, derived from the title of the area and the hazards in its profile: tropical cyclones; earthquakes; drought; floods; pandemics; combined with: risk; hazard; early warning; resilience; vulnerability; impact; exposure. With JavaScript enabled, recent works matching these terms are listed from OpenAlex and Crossref.

24Imibuzo

Imibuzo neempendulo.

What is the status of the Disaster and climate risk finance area?
The area profile is a proposal to the Nexus Standards registry; the area is not yet in the catalogue. Standards are adopted by the Global Standards Council after last call; in each country, adoption is a decision of its National Standards Council (NSC).
How are data sources presented?
Each data source is listed with its provider, licence, update frequency and delivery path, and links to the provider’s own publication.
How can this brief be amended?
Through a public change record under NS-13: a proposed amendment to the area profile or the registry, decided by the editors with written reasons.
IingxeloYiba negalelo

Faka ubungqina obuvela kweli phepha.

I-Reports lupapasho lwekota lweConsortium. Oko ukwaziyo ngalo mxholo kunokuba bubungqina, imeko okanye ulungiso kuhlelo olulandelayo, kubongwe wena kwaye kupapashwe phantsi kwe-CC BY 4.0 apho ingumsebenzi wakho.

Nexus Standards
Imigangatho

Contribute to Disaster and climate risk finance

Institutions and experts are invited to propose amendments, join the working group or propose data sources. National participation is organised through each country’s National Nexus Consortium (NNC) and its National Working Groups (NWGs); competent national authorities are engaged through official channels.

Imeko nokusetyenziswa. I-Nexus Standards yimigangatho ecetywayo ephuhliswe ngenkqubo evulekileyo phantsi kwe-NS-13 kwaye ipapashelwe ukusetyenziswa ngokuzithandela; ayisiso isatifikethi, ugunyaziso okanye imvume yolawulo, kwaye ukwamkelwa kuhlala kusisigqibo seBhunga leMigangatho yeHlabathi kwaye, kwilizwe ngalinye, seBhunga lalo leMigangatho leSizwe. I-UNI (Unique Nexus Identifier) ichonga into; ayiyiqinisekisi. Amagama amaqumrhu emigangatho nemigangatho yawo ngawabagcini bawo kwaye asetyenziswa kuphela ukuchonga amaxwebhu; akukho mbhalo womgangatho wangaphandle uphindwe apha. I-Nexus Standards ayidibananga, ayixhaswanga okanye ayiqinisekiswanga nguwuphi na umbutho wemigangatho okhankanywe apha.

Iilayisenisi: CC BY 4.0 yombhalo wemigangatho, iirejista, iischema nedatha; Apache-2.0 yekhowudi yereferensi. Imigangatho yangaphandle icatshulwa ngegama, inombolo nekhonkco phantsi kweelayisenisi zayo. Idatha yamaqela esithathu, iilayibrari neefonti zigcina iilayisenisi zazo: bona iZaziso zamaqela esithathu.