Business continuity and resilience
Continuity plans protect critical activities, but they are often untested, ignore dependencies on shared infrastructure and suppliers, and cannot be compared across organisations. This area of the Energy and Critical Infrastructure programme sets records for critical activities, dependencies, recovery objectives and exercise results so that continuity claims rest on tested evidence linked to infrastructure and hazard records. Each artefact of the area carries a UNI (Unique Nexus Identifier).
- Nexus Standards: NS-0, NS-9, NS-10, NS-11.
- Open standards: Principles for Operational Resilience; Regulation (EU) 2022/2554 (Digital Operational Resilience Act); NIST Cybersecurity Framework 2.0; PROV-O: The PROV Ontology.
- Data and feeds: NASA Black Marble night-time lights (VNP46); OpenStreetMap planet and replication.
- Couples with: Critical infrastructure and critical entities; Supply chain and trade risk; Enterprise and operational risk; Cyber resilience and digital operational resilience.
- Nexus Standards
- 4
- NS-0, NS-9, NS-10
- Open standards
- 4
- named, never copied
- Data and feeds
- 2
- listed for reference
- Couplings
- 4
- with other areas
- UNI
- requested · allocation in progress
- Status
- Proposednot yet in the catalogue
- Last reviewed
- area profile
Nexus Standards (2026). Business continuity and resilience: area brief, Energy and Critical Infrastructure programme. Proposed. https://nexustandards.com/energy-infrastructure/business-continuity-and-resilience/. Last reviewed 17 October 2026.
Files include the credits and the licence statement and are generated in the browser; no data is transmitted. Downloads require JavaScript.
Scope and boundaries
An area of the Energy and Critical Infrastructure programme (risk disciplines). The area profile sets out 5 matters in scope and 3 matters addressed by other areas.
In scope 5
- Critical activity and impact tolerance records
- Dependency records (infrastructure, suppliers, ICT)
- Recovery objective records
- Exercise and test result records
- Incident recovery timeline records
Out of scope 3
- Insurance claims
- Facilities management
- Management system conformity schemes
Jurisdictions Application in each jurisdiction is a national decision, taken by the National Standards Council (NSC) with the competent national authorities.
Transmission channels to related areas and programmes
The systemic couplings recorded for this context, grouped by transmission mechanism. The bar summarises each mechanism (select one to filter); each entry names the connected area or programme and describes the mechanism.
The interactive view requires JavaScript; the sections below present the same records.
From question to decision use
A question is framed in a stated context; data from NASA Black Marble night-time lights (VNP46) is assembled with its provenance; the method is documented and its uncertainty quantified; results are validated by an independent evaluator and published as a product with derivation relations; decision makers use it under their own mandate. 7 operations in 5 phases, built from the area profile: the rows carry its own data sources, indicators, open standards, couplings and, where listed, hazards, and each operation names the rules it implements (9). Records and artefacts are cited by UNI (Unique Nexus Identifier) and version.
Prosesverkenner · Standards · kodifiseer en korrigeer
Lewensiklus van 'n standaard
17 stappe·6 fases
Standards · kodifiseer en korrigeer
Lewensiklus van 'n standaard
Lewensiklus van 'n standaard · NS-13-spoor · Bydraekanale · IETF-spoor · W3C-spoor · OGC-spoor · OASIS-spoor · ISO- en IEC-fases · Konformiteit · Rekordlewensiklus · Roetering · Monitering.
Siklusbevindings word veranderingsvoorstelle, die Wêreldwye Standaarderaad aanvaar ná 'n openbare laaste oproep, en elke land besluit oor sy eie aanvaarding.
01 Lei sendings
- 01Route missions to standards and profilesStep · Nexus StandardsNexus Standards routes each candidate mission to the standards and profiles that apply.
02 Profiele en ooreenstemming
- 02Stel sendingprofiele saamStap · Nexus StandardsNexus Standards stel sendingprofiele saam en teken enige nasionale aanvaarding aan waarvan die sendings afhang.
- 03Valideer bou-uitsette teen die profieleStap · Nexus StandardsNexus Standards valideer bou-uitsette teen die saamgestelde profiele en teken die bewyse aan.
- 04Moniteer konformiteit en teken verseëlde bewyse aanStap · Nexus StandardsGedurende die Aksieweek monitor Nexus Standards konformiteit en teken afwykings aan.
03 Voorstelle en beoordeling
- 05Afwykings en regstellings word veranderingsvoorstelleStap · Nexus StandardsAfwykings word veranderingsvoorstelle, en die regstelling word as 'n verandering aan die bewyse aangeteken.
- 06Siklusbevindings word veranderingsvoorstelleStap · Nexus StandardsBevindings uit 'n siklus word veranderingsvoorstelle: metode- en korreksiebevindings uit Verslae (F06) en dokketitems uit Nexus…
- 07Stel op en hersien in die openbaarStap · Komitees en werkgroepeTegniese komitees en werkgroepe stel die standaarde op en hersien dit in die oop proses van NS-13.
- 08Beoordeel met die oog op 'n raadsbesluitStap · Nexus StandardsNexus Standards beweeg veranderingsvoorstelle deur beoordeling met die oog op 'n raadsbesluit.
04 Raadsbesluit
- 09Openbare laaste oproepStap · Global Standards CouncilDie Global Standards Council aanvaar by 'n tweederdemeerderheid ná 'n laaste oproep van negentig dae.
- 10Wêreldwye aanvaarding van 'n standaardBesluit · Global Standards CouncilDie Wêreldwye Standaarderaad besluit oor die aanvaarding van elke standaard ná 'n openbare laaste oproep.
05 Publiseer en identifiseer
- 11Assign a UNI and publishStep · Secretariat (GCRI Canada)Nexus Standards assigns UNIs and deposits publications under the publisher’s process.
- 12'n UNI identifiseer en sertifiseer nooit nieRekord · Nexus StandardsElke objek van die programjaar dra een identifiseerder, 'n UNI onder NS-1, sodat dit aangehaal, geweergaweer en opgelos kan word.
- 13Publiseer die jaar se aanvaarde veranderingeStap · Nexus StandardsBy hernuwing publiseer Nexus Standards die jaar se aanvaarde veranderinge en die nasionale aanvaardingstatus.
06 Nasionale aanvaarding en toepassing
- 14Nasionale aanvaarding deur die Nasionale StandaarderaadBesluit · Nasionale StandaarderaadElke land se Nasionale Standaarderaad besluit oor nasionale aanvaarding: aanvaar soos dit is, aanvaar met 'n profiel (NS-16), pas aan, of verwys slegs.
- 15Aangenome standaarde bereik kursusse en uitgawesStap · Nexus StandardsElke aangenome standaard of profiel word 'n kursusmodule by Risk Academy (F09), en standaarde word in Reports-uitgawes (R1) toegepas.
- 16Aanvaarding is finaal vir elke jurisdiksieStandaard · Nasionale StandaarderaadAanvaarding is finaal vir elke jurisdiksie, en die GSC het geen veto oor 'n nasionale besluit nie. Geen globale liggaam hou 'n veto nie.
- 17Nasionale aanvaardingsrekordsRekord · Nexus StandardsSaamgestelde missieprofiele en nasionale aanvaardingsrekords gaan na die Foundry by gereedheidsvoorbereiding (F08).
Nexus Standards · Nexus Standards (institution) · National Standards CouncilAn outline of the designed programme cycle, not a record of operation: no cycle has run and every programme is at service level R0. Every Nexus Standard is at the PROPOSED stage and nexustandards.com governs the text and status of each one. A UNI identifies and never certifies; a validator report is evidence for review, not a conformance claim.
The operations, as a table
| Step | Phase | Operation | Who | Decision rule | Record | Implements |
|---|---|---|---|---|---|---|
| 01 | Vraag | Frame the question (start). In scope: Critical activity and impact tolerance records, Dependency records (infrastructure, suppliers, ICT) and Recovery objective records. | the decision maker and the analyst | the context is explicit and carries a contextual UNI | Critical activity and impact tolerance records | NS9-R1 |
| 02 | Data | Assemble data (record). Data sources listed for reference: NASA Black Marble night-time lights (VNP46) and OpenStreetMap planet and replication. | the analyst | inputs are cited by UNI and version | records from NASA Black Marble night-time lights (VNP46) | NS2-R2, NS2-R4 |
| 03 | Metode | Method (model). Open references: Principles for Operational Resilience, Regulation (EU) 2022/2554 (Digital Operational Resilience Act) and NIST Cybersecurity Framework 2.0. | the analyst | models carry a model card with intended use and limitations | the method, documented with reference to Principles for Operational Resilience | NS12-R2 |
| 04 | Metode | Uncertainty (step). Assumptions are stated with the result. | the analyst | uncertainty is shown where it exists; nothing is coerced to a value | intervals, ensembles and missingness stated | NS5-R3, NS11-R3 |
| 05 | Validation | Validate (exercise). Golden-value tests and back-tests are recorded with their versions. | an independent evaluator with a mandate | subject and evaluator are distinct | attestations of reproducibility and of the stated tests | NS11-R1, NS11-R2 |
| 06 | Gebruik | Product (record). The product’s correction dependencies let a correction reach every result. | the publisher of record | a product cites its records; figures follow NS-5 | a product with derivation relations, reporting against Sendai Monitor D-5 | NS2-R4, NS5-R2 |
| 07 | Gebruik | Decision use (end). The decision record cites the product version it relied on. | the decision maker, under its own mandate | a product informs a decision; it does not make it | a decision citing the product by UNI and version | NS2-R2 |
Table.Operations in walking order; each row names the phase, the operation, its actor, its decision rule, the record it leaves and the rule identifiers it implements. The table shows the process as specified; it does not report the status of any standard, proposal or record. Sources: Principles for Operational Resilience · Regulation (EU) 2022/2554 (Digital Operational Resilience Act) · NS-0: Constitution and principles · NS-9: Contextual UNIs.
Sistemiese koppelings
4 couplings link this area to other areas and programmes, each with the mechanism of the link.
- Critical infrastructure and critical entitiesEnergy and Critical InfrastructureDependency: continuity depends on power, telecoms and water.
- Supply chain and trade riskIndustry, Trade and Supply ChainsCascade: supplier disruption threatens continuity.
- Enterprise and operational riskIndustry, Trade and Supply ChainsMechanism: continuity addresses operational risks.
- Cyber resilience and digital operational resilienceDigital, Cyber and AIMechanism: digital resilience requires continuity of ICT services.
How a shock travels through this system
A system model of this area built from the registry: 6 hazards, 5 systems, 4 sectors, 10 controls, 2 feeds, 1 indicator. Select the components to include, choose an initiating hazard and run the scenario. Stress propagates through the hazard relations of the Nexus Hazard Standard (NHS-1), the exposure of each system, the recorded couplings and the sectors that carry the loss; adopted standards dampen transmission and live data sources support detection. All parameters are stated assumptions that the reader can adjust; results are illustrative scenario outputs for exercises and training, not forecasts or risk assessments. The Map view places the same run on an example geography, Europe, the region of the programme’s context map, with open data: country boundaries, a grid of hexagonal cells and NASA satellite layers for the initiating hazard. The geography serves exercises and training and is not an assessment of that place.
Gevare
- Dam failure
- River flood (set off downstream)
- Flash flood (set off downstream)
- Mass displacement (set off downstream)
- Widespread power outage (set off downstream)
- Water supply shortfall (set off downstream)
Systems and couplings
Controls
NS-0Grondwet en beginselsNS-9Kontekstuele UNI's (ontplooiings, instansies, programinstansies)NS-10Beleide en klousules (masjienleesbare verpligtinge: definisie, binding, evaluering en afdwinging)NS-11Verifikasie en monitering (getuienis, attestasies, zero-trust-ooreenstemmingwaarneming)NRS-K36Domeinpakketprofiel: Kritieke infrastruktuur (DOMAIN-036)NRS-H107Gevarefamilie: Konsentrasie en monokultuur van digitale infrastruktuur (NHS-1 tech.digital-concentration)NRS-H120Gevarefamilie: Strukturele broosheid van onderling verbonde stelsels (NHS-1 sys.fragility)NRS-X8Operasionele veerkragtigheid en sakekontinuïteitNRS-H56Gevarefamilie: Konflikgedrewe skade (NHS-1 soc.conflict-induced)NRS-H61Gevarefamilie: Kaskaderende faling (NHS-1 sys.cascade)
Observation
- NASA Black Marble night-time lights (VNP46) (listed for reference)
- OpenStreetMap planet and replication (listed for reference)
- Number of disruptions to basic services attributed to disasters
Example geography
- Europe: 113 hexagonal cells
- Night lights tonight, outages (VIIRS Day/Night Band), NASA GIBS
- Surface water through cloud, 30 m (OPERA DSWx-S1 radar), NASA GIBS
- Rain rate, last half hour (IMERG), NASA GIBS
- Surface soil moisture (SMAP), NASA GIBS
Standards that apply
The area profile lists 4 Nexus Standards. Each is a proposed standard under development.
- 01
NS-0 · Constitution and principles
Status: proposed · 12 requirements stated. Read NS-0.
- 02
NS-9 · Contextual UNIs (deployments, instances, programme instances)
Status: proposed · 5 requirements stated. Read NS-9.
- 03
NS-10 · Policies and clauses (machine-readable obligations: definition, binding, evaluation and enforcement)
Status: proposed · 7 requirements stated. Read NS-10.
- 04
NS-11 · Verification and monitoring (evidence, attestations, zero-trust conformance observation)
Status: proposed · 6 requirements stated. Read NS-11.
Open standards referenced
4 open standards, each with its relation as recorded in the register under NS-14. Hover over or focus a relation for its definition.
crosswalk3
Principles for Operational ResilienceBasel Committee on Banking Supervision (BIS)proposed for the registerRegulation (EU) 2022/2554 (Digital Operational Resilience Act)European Parliament and Councillisted in the register · eu-doraNIST Cybersecurity Framework 2.0NISTlisted in the register · nist-csf-2Aanwysers
The area profile names 1 indicator, each with its framework and code.
Indicator names and codes are given as published by their stewards.
Hazards, threats and sectors concerned
Hazards and threats 5
Sektore 4
Data sources
2 data sources named in the area profile, each with provider, licence, update frequency and delivery path.
Data sources are listed for reference; live data is displayed once licence review is complete.
- Lewendig
- 0
- on completion of licence review
- Listed in the data register
- 2
- licence terms recorded
- Proposed for the register
- 0
- licence terms to be recorded
- Delivery
- 2 governed service · 0 plugin · 0 browser · 0 snapshot · 0 listed for reference
- proposed paths in order of preference: governed data service, plugin, direct browser read, build-time snapshot; sources whose terms do not permit reuse are listed for reference only
NASA Black Marble night-time lights (VNP46)for reference.
NASA Goddard / LAADS DAAC · daily
NASA Earth science data and information policy (open)
governed data servicelisted in the data register.
OpenStreetMap planet and replicationfor reference
OpenStreetMap Foundation and contributors · minutely
ODbL-1.0
governed data servicelisted in the data register.
Routing, monitoring and verification tools
Monitoring console
Version and source status for each standard, as published by the issuing bodies.
Available · from the registryVerification console
Test suites, conformance statements and attestations for each standard, as recorded in the registry.
Each console computes from the registry and states its reasoning; decisions remain with the competent bodies.
Evidence, recognition and capital pathways
What each institution of the ecosystem draws from this area: The Global Centre for Risk and Innovation (GCRI Canada), as Secretariat, for evidence; The Global Risks Forum (GRF) for recognition; and The Global Risks Alliance (GRA) for capital.
GCRI Canada
GCRI Canada may accept exercise and recovery records as research evidence on organisational resilience; the decision rests with GCRI Canada under its own evidence and research rules.
Die Global Risks Forum (GRF)
GRF may record organisations publishing exercise records on the shared profile as a dialogue item; the decision rests with GRF under its own recognition rules.
Die Global Risks Alliance (GRA)
GRA may read continuity and recovery records when it considers operational resilience; the decision rests with GRA under its own capital-readiness rules.
Each institution determines under its own rules what it accepts as evidence; a pathway reading is neither an approval nor investment advice.
Restricted compatibility profiles
2 standards whose text is not openly available, named and linked only. Any compatibility profile is kept on protected pages until an arrangement with the issuing body is in place.
- ISO 22301:2019 Business continuity management systems – RequirementsISO/TC 292compatibility profile (restricted)
- ISO 22316:2017 Organisational resilience – Principles and attributesISO/TC 292compatibility profile (restricted)
Working group charter
A proposed charter for this area, open to institutions and experts.
Records for critical activities, dependencies and tested recovery.
Institutions and experts are invited to charter this working group under NS-13 by filing a public change record. National Working Groups (NWGs) contribute national inputs and field exercises through their National Nexus Consortium (NNC).
- Impact tolerance record
- Dependency record linking infrastructure
- Exercise result record
- Business Continuity Institute liaison sought
- Disaster Recovery Institute International liaison sought
- ISO/TC 292 liaison sought
- ENISA liaison sought
Open research questions
3 questions identified as priorities for the working group.
- Exercises are rarely realistic and results are not shared.
- Dependencies on shared infrastructure are poorly mapped.
- Impact tolerance definitions vary.
Intended users
The area profile identifies 4 user communities.
- Business continuity managers
- Resilience officers
- Supervisors of operational resilience
- Public sector emergency planners
Bronne
3 references from peer-reviewed and official publications cited in the area profile, linked at the publishers’ own sites.
peer-reviewedA review of definitions and measures of system resilienceReliability Engineering & System Safety · 2016peer-reviewedChanging the resilience paradigmNature Climate Change · 2014- officialPrinciples for Operational ResilienceBasel Committee on Banking Supervision · 2021
Recent research on this area
Recent peer-reviewed articles, preprints, datasets and reports on the subject of this area, retrieved at the time of reading from open scholarly metadata services (OpenAlex, Crossref, DataCite, Zenodo, arXiv, Europe PMC, OpenAIRE Graph) with search terms composed from the registry. Each work is listed with its authors, venue, year, type, open-access status and licence, and links to its DOI or landing page. Sources not yet enabled for live display on this site are listed for reference and are not queried.
Search termsutility outages; supplier failure; cyber incidents; pandemics; natural hazards; dam failure; Principles for Operational Resilience; Regulation 2022/2554combined with: risk; hazard; early warning; resilience; vulnerability; impact; exposureDerived from the title of the area and the hazards in its profile, the NHS-1 hazards it names and the open standards it lists.
- OpenAlexlisted for reference; not queried
- Crossreflisted for reference; not queried
- DataCitelisted for reference; not queried
- Zenodolisted for reference; not queried
arXivlisted for reference; not queried- Europe PMClisted for reference; not queried
- OpenAIRE Graphlisted for reference; not queried
No source is enabled for live display on this site yet: the sources are listed for reference and none is queried. Once the publisher of record enables a source after its terms are reviewed, recent works are listed here. Metadata and links only: title, authors, venue, year, type, open-access status and licence as each source records them; works are listed for orientation, not reviewed or endorsed.
Risk Academy courses and disciplines
1 course and 3 disciplines of Risk Academy (risksacademy.com) that teach the knowledge and methods of this area. Each course lists its level, stream and learning hours.
Kursusse
Dissiplines
The correspondence between courses, disciplines and the Nexus Standards is maintained with Risk Academy and is subject to its academic review.
Programmes, tracks and courses for this area
GCRI Canada, The Global Risks Forum (GRF), The Global Risks Alliance (GRA) and Risk Academy work on the subject of this area in distinct roles (research and evidence; governance, policy and convening; capital, finance and markets; education and training). Each entry states why it corresponds and the step it offers; each institution sets its own terms of participation.
Navorsing en bewyse
GCRI Canada
Research programmes that produce the observations, models and assessments these records describe.
Systemic Risk ManagementDevelops resilience engineering and enterprise risk practice for interconnected organisations.Apply to this programme Disaster Resilience and RecoveryStudies preparedness and continuity planning with communities and institutions.Apply to this programme therisk.globalAll programmes of GCRI CanadaGovernance, policy and convening
Die Global Risks Forum (GRF)
Tracks that convene public authorities, researchers and institutions on the governance of shared risks.
Disaster and Crisis GovernanceExamines business continuity governance and decision rights in a crisis.Join this track globalriskforum.comAll tracks of The Global Risks ForumCapital, finance and markets
Die Global Risks Alliance (GRA)
Industry programmes in which financial institutions build a shared understanding of systemic risk.
Financial Cyber and Operational ResilienceWorks on critical business services and operational resilience testing in finance.Join this programme globalriskalliance.comAll programmes of The Global Risks AllianceOnderwys en opleiding
Risk Academy
Courses and disciplines that teach the knowledge and methods practitioners need to apply these standards.
Resilience Building 101RAF-102 · Introductory · 19.5 learning hoursConcepts, measures and investments that help people, infrastructure and organisations withstand and recover from shocksTake this course All courses and disciplinesListed in the education and training section of this pageKernterme
- UNI
- Unique Nexus Identifier: a persistent identifier that resolves an artefact to its record.
- voorgestel
- A draft in the open development process that the Global Standards Council has not yet adopted. Each area profile is a proposal to the Nexus Standards registry.
- crosswalk
- Relation in which clauses of these standards are mapped to parts of the external standard by clause number, without reproducing its text.
- adopt
- Relation in which the external standard is used as published and values are validated against it.
- compatibility profile (restricted)
- Relation to a standard whose text is not openly available: the standard is named and linked only, and any compatibility profile is kept on protected pages.
- change record
- A public record of a proposed change under NS-13, decided by the editors with written reasons.
- attestation
- An evaluator’s recorded result for one clause and one subject under NS-11.
- liaison sought
- A liaison the working group intends to request from the issuing body; a liaison is established only when the body confirms it in writing.
Related areas
Recent research and sources
Peer-reviewed articles, preprints, reports and datasets on the subject of this area, retrieved at the time of reading from open scholarly metadata services (OpenAlex and Crossref) and listed with authors, venue, year, type and access status, with a link to each work. Curated references and related standards are listed first; recent works matched by subject follow and are listed for orientation.
Curated references
- Changing the resilience paradigm
Nature Climate Change · 2014 · Peer-reviewed - A review of definitions and measures of system resilience
Reliability Engineering & System Safety · 2016 · Peer-reviewed - Principles for Operational Resilience
Basel Committee on Banking Supervision · 2021 · Official publication
Related standards and frameworks
- Principles for Operational Resilience
Basel Committee on Banking Supervision (BIS) - Regulation (EU) 2022/2554 (Digital Operational Resilience Act)
European Parliament and Council - NIST Cybersecurity Framework 2.0
NIST - PROV-O: The PROV Ontology
W3C
Search terms, derived from the title of the area and the hazards in its profile: utility outages; supplier failure; cyber incidents; pandemics; natural hazards; combined with: risk; hazard; early warning; resilience; vulnerability; impact; exposure. With JavaScript enabled, recent works matching these terms are listed from OpenAlex and Crossref.
Questions and answers.
What is the status of the Business continuity and resilience area?
How are data sources presented?
How can this brief be amended?
Dra bewyse vanaf hierdie bladsy by.
Reports is die Konsortium se kwartaallikse publikasie. Wat jy oor hierdie onderwerp weet, kan bewyse, 'n saak of 'n korreksie in die volgende uitgawe word, aan jou toegeskryf en onder CC BY 4.0 gepubliseer waar dit jou eie werk is.
- E-posPoort GW-STDStuur dit vanaf hierdie bladsyGetuienis, 'n regstelling, 'n geval, 'n metode, 'n beoordeling, 'n vertaling of profielinset. Dit kom aan gemerk met hierdie bladsy, sodat die redakteur wat dit besit dit ontvang.
- ZenodoOpen depositDeposit it and submit to the communityPublish your own record on Zenodo with your ORCID iD, then submit it to the Reports community there. Curators review it; the DOI stays yours.
- ReportsNexus StandardsSee every way to contributeThe contribution types, how each is reviewed, what credit you receive, the licence and what is never accepted.
Stuur nooit persoonlike data, sensitiewe infrastruktuurbesonderhede of enigiets wat u geen reg het om te deel nie. 'n Bydrae word voor gebruik beoordeel; die stuur daarvan verleen geen outeurskap of redaksionele regte nie, en borgskap koop nooit 'n bevinding nie.
Contribute to Business continuity and resilience
Institutions and experts are invited to propose amendments, join the working group or propose data sources. National participation is organised through each country’s National Nexus Consortium (NNC) and its National Working Groups (NWGs); competent national authorities are engaged through official channels.
Status en gebruik. Die Nexus Standards is voorgestelde standaarde wat deur 'n oop proses onder NS-13 ontwikkel en vir vrywillige gebruik gepubliseer word; hulle maak nie sertifisering, akkreditasie of regulatoriese goedkeuring uit nie, en aanvaarding bly 'n besluit van die Wêreldwye Standaarderaad en, in elke land, van sy Nasionale Standaarderaad. 'n UNI (Unique Nexus Identifier) identifiseer 'n artefak; dit sertifiseer dit nie. Name van standaardliggame en hul standaarde behoort aan hul rentmeesters en word slegs gebruik om die dokumente te identifiseer; geen teks van 'n eksterne standaard word hier gereproduseer nie. Nexus Standards is nie geaffilieer met, onderskryf deur of gesertifiseer deur enige standaardliggaam wat hier genoem word nie.
Lisensies: CC BY 4.0 vir standaardteks, registers, skemas en data; Apache-2.0 vir verwysingskode. Eksterne standaarde word volgens naam, nommer en skakel onder hul eie lisensies aangehaal. Derdeparty-data, -biblioteke en -lettertipes behou hul eie lisensies: sien Kennisgewings van derde partye.