Skip to content
ViwangoUtayari na UpitishajiHadhira
Area · proposed

Kwa jamii za kitaasisi

The entry area for the Global Centre for Risk and Innovation (GCRI Canada), Global Risks Forum and Global Risks Alliance communities in the Readiness and Adoption programme explains, for fellows, members, partners and project teams, what each readiness pathway reads as evidence, how attestations are presented for verification, and how each institution decides under its own rules. Each artefact of the area carries a UNI (Unique Nexus Identifier).

Jamii za kitaasisi
What this area is built from: the Nexus Standards it applies, the open standards it names and the data and feeds it reads, then the areas its record couples it with (marked).Source: the Nexus Standards registry: the area record.
  • Nexus Standards: NS-0, NS-9, NS-11, NS-14.
  • Open standards: OpenStand principles (RFC 6852); Verifiable Credentials Data Model 2.0; DataCite Metadata Schema 4.5; IFRS S2 Climate-related Disclosures.
  • Data and feeds: OpenAlex scholarly graph; IATI Datastore.
  • Couples with: GCRI Canada evidence pathway; Recognition pathway, The Global Risks Forum (GRF); Capital pathway, The Global Risks Alliance (GRA); Communities, learning and contribution.
Nexus Standards
4
NS-0, NS-9, NS-11
Open standards
4
named, never copied
Data and feeds
2
listed for reference
Couplings
4
with other areas
UNI
requested · allocation in progress
Hali
Proposednot yet in the catalogue
Last reviewed
area profile
Cite this page

Nexus Standards (2026). For institutional communities: area brief, Readiness and Adoption programme. Proposed. https://nexustandards.com/readiness/for-gcri-grf-gra-communities/. Last reviewed 17 October 2026.

Download the profile

Files include the credits and the licence statement and are generated in the browser; no data is transmitted. Downloads require JavaScript.

01Wigo

Scope and boundaries

An area of the Readiness and Adoption programme (audiences). The area profile sets out 5 matters in scope and 3 matters addressed by other areas.

In scope 5

  • What each pathway reads as evidence and in which order
  • How attestations are presented for verification, with evaluator and time of evaluation
  • How Nexus records reference institutional decisions without producing them
  • How to contribute to working groups as a community member
  • Prohibited claims and how to describe adoption accurately

Out of scope 3

  • Membership benefits or programme admission
  • Institutional decisions of GCRI Canada, GRF or GRA
  • Fundraising

Jurisdictions Application in each jurisdiction is a national decision, taken by the National Standards Council (NSC) with the competent national authorities.

02Entry point

Where institutional communities start in the registry.

Zana

Tools and records

Implementation status as recorded in the registry for each implementation.

UtekelezajiJukumuStandards for this community
RecordTitleHali
NXS-STD-ST-000001Nexus Standards NS-1 – the UNI and artefact cataloguedraft
NXS-STD-SW-000002UNI command-line tool (validate, parse, next, mint, catalogue, export) – reference implementationdraft
NXS-STD-SC-000001UNI artefact record schema v1draft
NXS-STD-ST-000002Open-standards and open-source stack under the UNIdraft
NXS-STD-SW-000005UNI data profile (STAC, DCAT, PROV-O crosswalks), NS-3bdraft
NXS-STD-ST-000003Nexus Standards NS-3 – risk record UNIs (grammar, legacy crosswalk, allocation authority)draft
NXS-STD-ST-000004Nexus Standards NS-0 – constitution and principlesdraft
NXS-STD-ST-000007Nexus Standards NS-11 – verification and monitoringdraft

Rasilimali na zana

Njia

Njia za utayari

Pathways that read this evidence; each institution decides under its own rules.

Njia ya GCRI Canada

Njia ya ushahidi ya GCRI Canada

Kile ambacho mradi, seti ya data au muundo lazima ubebe ili kuwa ushahidi unaokubalika katika mikondo ya utafiti na akili ya GCRI Canada. Fungua njia.

Njia ya utambuzi

Njia ya utambuzi, The Global Risks Forum (GRF)

Kile ambacho taasisi, programu au usambazaji lazima uthibitishe kwa rekodi za utambuzi za GRF; rekodi, si sifa. Fungua njia.

Njia ya mtaji

Njia ya mtaji, The Global Risks Alliance (GRA)

Kile ambacho mradi au jalada lazima lithibitishe kwa tathmini ya utayari wa mtaji; si ushauri wa uwekezaji wala uidhinishaji. Fungua njia.

03Mchakato

The participation pathway

GCRI Canada fellows and researchers, GRF members and convenors and GRA partners and project teams find the area and its open drafts, take part without a membership fee, comment in the open, join a working group, propose text and see each comment answered in writing; accepted work becomes a version, and national adoption is decided by each National Standards Council (NSC). 8 operations in 5 phases, built from the area profile: the rows carry its own data sources, indicators, open standards, couplings and, where listed, hazards, and each operation names the rules it implements (8). Records and artefacts are cited by UNI (Unique Nexus Identifier) and version.

Kichunguzi cha michakato · Standards · ratibu na sahihisha

Mzunguko wa maisha wa kiwango

Hatua 17Awamu 6

Standards · ratibu na sahihisha

Mzunguko wa maisha wa kiwango

Mzunguko wa maisha wa kiwango · Njia ya NS-13 · Njia za michango · Njia ya IETF · Njia ya W3C · Njia ya OGC · Njia ya OASIS · Hatua za ISO na IEC · Ulinganifu · Mzunguko wa maisha wa rekodi · Uelekezaji · Ufuatiliaji.

Matokeo ya mzunguko huwa mapendekezo ya mabadiliko, Baraza la Viwango la Dunia hupitisha baada ya mwito wa mwisho wa umma, na kila nchi huamua upitishaji wake.

  1. 01 Elekeza misheni

    1. 01Route missions to standards and profilesStep · Nexus StandardsNexus Standards routes each candidate mission to the standards and profiles that apply.
  2. 02 Wasifu na ulinganifu

    1. 02Kusanya wasifu wa misheniHatua · Nexus StandardsNexus Standards hukusanya wasifu wa misheni na hurekodi upitishaji wowote wa kitaifa ambao misheni hutegemea.
    2. 03Thibitisha matokeo ya ujenzi dhidi ya wasifuHatua · Nexus StandardsNexus Standards huthibitisha matokeo ya ujenzi dhidi ya wasifu ulioundwa na kurekodi ushahidi.
    3. 04Fuatilia ulinganifu na urekodi ushahidi uliofungwaHatua · Nexus StandardsWakati wa Wiki ya Utekelezaji Nexus Standards hufuatilia ulinganifu na kurekodi mikengeuko.
  3. 03 Mapendekezo na mapitio

    1. 05Mikengeuko na marekebisho huwa mapendekezo ya mabadilikoHatua · Nexus StandardsMikengeuko huwa mapendekezo ya mabadiliko, na marekebisho hurekodiwa kama mabadiliko kwa ushahidi.
    2. 06Matokeo ya mzunguko huwa mapendekezo ya mabadilikoHatua · Nexus StandardsMatokeo ya mzunguko huwa mapendekezo ya mabadiliko: matokeo ya mbinu na masahihisho kutoka Ripoti (F06) na vipengele vya orodha kutoka Nexus…
    3. 07Andaa na urekebishe hadharaniHatua · Kamati na vikundi kaziKamati za kiufundi na vikundi kazi huandaa rasimu na kurekebisha viwango katika mchakato wazi wa NS-13.
    4. 08Pitia kuelekea uamuzi wa barazaHatua · Nexus StandardsNexus Standards huendeleza mapendekezo ya mabadiliko kupitia mapitio kuelekea uamuzi wa baraza.
  4. 04 Uamuzi wa Baraza

    1. 09Mwito wa mwisho wa ummaHatua · Baraza la Viwango la KimataifaBaraza la Viwango la Kimataifa hupitisha kwa wingi wa theluthi mbili baada ya mwito wa mwisho wa siku tisini.
    2. 10Kupitishwa kwa kiwango dunianiUamuzi · Global Standards CouncilBaraza la Viwango la Dunia huamua upitishaji wa kila kiwango baada ya mwito wa mwisho wa umma.
  5. 05 Chapisha na utambulishe

    1. 11Assign a UNI and publishStep · Secretariat (GCRI Canada)Nexus Standards assigns UNIs and deposits publications under the publisher’s process.
    2. 12UNI hutambulisha na kamwe haitoi chetiRekodi · Nexus StandardsKila kitu cha mwaka wa programu kina kitambulisho kimoja, UNI chini ya NS-1, ili kiweze kutajwa, kupewa matoleo na kutatuliwa.
    3. 13Chapisha mabadiliko yaliyopitishwa ya mwakaHatua · Nexus StandardsWakati wa upyaishaji Nexus Standards huchapisha mabadiliko yaliyopitishwa ya mwaka na hali ya upitishaji wa kitaifa.
  6. 06 Kupitishwa na kutumika kitaifa

    1. 14Kupitishwa kitaifa na Baraza la Viwango la KitaifaUamuzi · Baraza la Viwango la KitaifaBaraza la Viwango la Kitaifa la kila nchi huamua upitishaji wa kitaifa: kupitisha kama ilivyo, kupitisha kwa wasifu (NS-16), kurekebisha, au kurejelea tu.
    2. 15Viwango vilivyopitishwa hufikia kozi na matoleoHatua · Nexus StandardsKila kiwango au wasifu uliopitishwa huwa moduli ya kozi katika Risk Academy (F09), na viwango hutumika katika matoleo ya Reports (R1).
    3. 16Upitishaji ni wa mwisho kwa kila mamlaka ya kisheriaKiwango · Baraza la Kitaifa la ViwangoUpitishaji ni wa mwisho kwa kila mamlaka ya kisheria, na GSC haina kura ya turufu juu ya uamuzi wa kitaifa. Hakuna chombo cha kimataifa chenye kura ya turufu.
    4. 17Rekodi za kupitishwa kitaifaRekodi · Nexus StandardsWasifu wa misheni ulioundwa na rekodi za upitishaji wa kitaifa huenda kwa Foundry wakati wa maandalizi ya utayari (F08).

Nexus Standards · Nexus Standards (institution) · National Standards CouncilAn outline of the designed programme cycle, not a record of operation: no cycle has run and every programme is at service level R0. Every Nexus Standard is at the PROPOSED stage and nexustandards.com governs the text and status of each one. A UNI identifies and never certifies; a validator report is evidence for review, not a conformance claim.

The operations, as a table
Process · the participation pathway8 operations · 5 phases
StepPhaseOperationWhoDecision ruleRecordImplements
01DiscoveryFind the area (start). Learning pathways and calls are linked from the area. The entry area for the GCRI Canada, Global Risks Forum and Global Risks Alliance communities in the Readiness and Adoption programme explains, for fellows, members, partners and project teams, what each readiness pathway reads as evidence, how attestations are presented for verification, and how each institution decides under its own rules..GCRI Canada fellows and researchers, GRF members and convenors and GRA partners and project teamsstandards, registries and schemas are published openlythe area page, its drafts and its callsNS0-P1
02DiscoveryRead the drafts (step). Nexus Standards of this area: NS-0, NS-9, NS-11, NS-14.the participantdrafts carry UNIs and are cited by versionthe current drafts with their UNIsNS2-R2
03JoiningJoin (step). No membership fee is required; agents take part under a recorded mandate.the participantparticipation is open and free; identity is recordedan identity recorded with ORCID or RORNS13-R2
04CommentComment (record). Accepted, rejected, deferred or open: each disposition is written.the participanteach comment receives a disposition with a reasona comment in the open record of a proposalNS13-R2
05CommentWorking group (step). Deliverables: Community learning path with a worked readiness file, Plain-language guide to pathway decisions and Wording guide for adoption statements.the working group chairsconsensus with recorded dissent; two co-chairs from different organisationsCurate the community path across the three pathways and keep its wording on claims consistent with the editorial rules.NS13-R2
06ProposalPropose text (gate). Last call is announced to every stakeholder group listed on the proposal.the participant or the working groupevery change enters through a proposal; objections are dispositioned before acceptancea proposal with a UNI, through last callNS13-R1, NS13-R3
07UpitishajiNew version (record). Contributors are credited; agents are credited as agents.the editorseditors decide in writing; they do not adopta semantic version crediting contributorsNS13-R4, NS13-R5, NS2-R3
08UpitishajiAdoption (end). The GSC has no veto over a national decision.the GSC; in each country the NSCnational adoption is a national decisionadoption by the Global Standards Council (GSC); national decisions by each NSCNS13-R4

Table.Operations in walking order; each row names the phase, the operation, its actor, its decision rule, the record it leaves and the rule identifiers it implements. The table shows the process as specified; it does not report the status of any standard, proposal or record. Sources: OpenStand principles (RFC 6852) · Verifiable Credentials Data Model 2.0 · NS-0: Constitution and principles · NS-9: Contextual UNIs.

04Alignment

From frameworks and sources to the applicable standards

Read from left to right; select or focus an item to trace its connections.

The interactive view requires JavaScript; the sections below present the same records.

05Hadhira

Intended users

The area profile identifies 4 user communities.

  1. GCRI Canada fellows and researchers
  2. GRF members and convenors
  3. GRA partners and project teams
  4. Chapters
06System model

How a shock travels through this system

A system model of this area built from the registry: 5 systems, 4 sectors, 10 controls, 2 feeds, 2 indicators. Select the components to include, choose an initiating hazard and run the scenario. Stress propagates through the hazard relations of the Nexus Hazard Standard (NHS-1), the exposure of each system, the recorded couplings and the sectors that carry the loss; adopted standards dampen transmission and live data sources support detection. All parameters are stated assumptions that the reader can adjust; results are illustrative scenario outputs for exercises and training, not forecasts or risk assessments.

Controls

  • NS-0 Katiba na kanuni
  • NS-9 UNI za kimuktadha (utekelezaji, matukio, matukio ya programu)
  • NS-11 Uthibitishaji na ufuatiliaji (ushahidi, uthibitisho, uchunguzi wa ulinganifu usio na imani)
  • NS-14 Ulinganifu na upatanisho na viwango vya nje
  • NRS-U16Wasifu wa jukwaa la Universe: Institutional Funds Nexus
  • NRS-S3 System profile: NXS-DSS (Decision cases and deliberation)
  • NRS-S19 System profile: NXS-POR (Public, client and partner delivery)
  • NRS-U2 Wasifu wa jukwaa la Universe: Banking Nexus
  • NRS-U17 Wasifu wa jukwaa la Universe: Insurance Nexus
  • NRS-U23 Universe platform profile: Reports

Observation

  • OpenAlex scholarly graph (listed for reference)
  • IATI Datastore (listed for reference)
  • Amount in United States dollars committed to public-private partnerships for infrastructure
  • Number of countries reporting progress in multi-stakeholder development effectiveness monitoring frameworks that support the achievement of the sustainable development goals
07Viwango

Standards that apply

The area profile lists 4 Nexus Standards. Each is a proposed standard under development.

  1. 01

    NS-0 · Constitution and principles

    Status: proposed · 12 requirements stated. Read NS-0.

  2. 02

    NS-9 · Contextual UNIs (deployments, instances, programme instances)

    Status: proposed · 5 requirements stated. Read NS-9.

  3. 03

    NS-11 · Verification and monitoring (evidence, attestations, zero-trust conformance observation)

    Status: proposed · 6 requirements stated. Read NS-11.

  4. 04

    NS-14 · Conformance and crosswalk to external standards

    Status: proposed · 5 requirements stated. Read NS-14.

09Miunganiko ya kimfumo

Miunganiko ya kimfumo

4 couplings link this area to other areas and programmes, each with the mechanism of the link.

  1. GCRI Canada evidence pathwayReadiness and AdoptionThe evidence pathway explains what GCRI Canada reads.
  2. Recognition pathway, The Global Risks Forum (GRF)Readiness and AdoptionThe recognition pathway explains what GRF reads.
  3. Capital pathway, The Global Risks Alliance (GRA)Readiness and AdoptionThe capital readiness pathway explains what GRA reads.
  4. Communities, Learning and ContributionCommunities, Learning and ContributionThe Communities, Learning and Contribution programme connects these communities to working groups and training.
11Utayari

Evidence, recognition and capital pathways

What each institution of the ecosystem draws from this area: GCRI Canada, as Secretariat, for evidence; The Global Risks Forum (GRF) for recognition; and The Global Risks Alliance (GRA) for capital.

Evidence pathway

GCRI Canada

Community members learn what makes their outputs readable by the GCRI Canada evidence pathway and that GCRI Canada decides admissibility under its own rules.

Read the evidence pathway

Njia ya utambuzi

Global Risks Forum (GRF)

Community members learn what record trail GRF considers and that GRF decides recognition independently.

Read the recognition pathway

Njia ya mtaji

Global Risks Alliance (GRA)

Community members learn what a GRA capital-readiness file contains and that GRA alone decides on it.

Read the capital pathway

Each institution determines under its own rules what it accepts as evidence; a pathway reading is neither an approval nor investment advice.

12Data sources

Data sources

2 data sources named in the area profile, each with provider, licence, update frequency and delivery path.

Data sources

Data sources are listed for reference; live data is displayed once licence review is complete.

Hai
0
on completion of licence review
Listed in the data register
0
licence terms recorded
Proposed for the register
2
licence terms to be recorded
Delivery
1 governed service · 0 plugin · 0 browser · 0 snapshot · 1 listed for reference
proposed paths in order of preference: governed data service, plugin, direct browser read, build-time snapshot; sources whose terms do not permit reuse are listed for reference only
  • IATI Datastorefor reference

    International Aid Transparency Initiative · daily

    Publishers’ open licences as declared in the IATI Registry.

    listed for referenceproposed for the data register.

  • OpenAlex scholarly graphfor reference

    OurResearch · daily

    CC0 1.0

    governed data serviceproposed for the data register.

14Kikundi kazi

Working group charter

A proposed charter for this area, open to institutions and experts.

Wigo

Curate the community path across the three pathways and keep its wording on claims consistent with the editorial rules.

Institutions and experts are invited to charter this working group under NS-13 by filing a public change record. National Working Groups (NWGs) contribute national inputs and field exercises through their National Nexus Consortium (NNC).

Deliverables · 3
  1. Community learning path with a worked readiness file
  2. Plain-language guide to pathway decisions
  3. Wording guide for adoption statements
Liaison targets · 2
  • W3C Verifiable Credentials Working Group liaison sought
  • OpenStand affirming organisations liaison sought
15Research questions

Open research questions

3 questions identified as priorities for the working group.

  1. Community members may read pathway descriptions as assurances of readiness; the wording must prevent that reading.
  2. The three institutions’ decision records are not yet machine-readable.
  3. The separation of roles between the institutions must remain visible in every worked example.
16Restricted standards

Restricted compatibility profiles

Standards whose text is not openly available are named and linked only. Any compatibility profile is kept on protected pages until an arrangement with the issuing body is in place.

The working group may identify restricted standards relevant to this area; they are listed here by name and link.

17Hazards and sectors

Hazards, threats and sectors concerned

Hazards and threats 0

This area draws on the hazards of the areas it is coupled with.

Sekta 0

This area serves all sectors through the areas it is coupled with.

18Vyanzo

Vyanzo

3 references from peer-reviewed and official publications cited in the area profile, linked at the publishers’ own sites.

19Research hub

Recent research on this area

Recent peer-reviewed articles, preprints, datasets and reports on the subject of this area, retrieved at the time of reading from open scholarly metadata services (OpenAlex, Crossref, DataCite, Zenodo, arXiv, Europe PMC, OpenAIRE Graph) with search terms composed from the registry. Each work is listed with its authors, venue, year, type, open-access status and licence, and links to its DOI or landing page. Sources not yet enabled for live display on this site are listed for reference and are not queried.

Search termssystemic risk; risk governance; global risks; OpenStand principles; Verifiable Credentials Data ModelDerived from the title and scope of the area, the NHS-1 hazards it names and the open standards it lists.

  • OpenAlexlisted for reference; not queried
  • Crossreflisted for reference; not queried
  • DataCitelisted for reference; not queried
  • Zenodolisted for reference; not queried
  • arXivlisted for reference; not queried
  • Europe PMClisted for reference; not queried
  • OpenAIRE Graphlisted for reference; not queried

No source is enabled for live display on this site yet: the sources are listed for reference and none is queried. Once the publisher of record enables a source after its terms are reviewed, recent works are listed here. Metadata and links only: title, authors, venue, year, type, open-access status and licence as each source records them; works are listed for orientation, not reviewed or endorsed.

20Elimu na mafunzo

Risk Academy courses and disciplines

1 course and 3 disciplines of Risk Academy (risksacademy.com) that teach the knowledge and methods of this area. Each course lists its level, stream and learning hours.

21Katika mtandao mzima

Programmes, tracks and courses for this area

GCRI Canada, The Global Risks Forum (GRF), The Global Risks Alliance (GRA) and Risk Academy work on the subject of this area in distinct roles (research and evidence; governance, policy and convening; capital, finance and markets; education and training). Each entry states why it corresponds and the step it offers; each institution sets its own terms of participation.

Utafiti na ushahidi

GCRI Canada

Research programmes that produce the observations, models and assessments these records describe.

RegistryRecords evidence classes, the records the evidence pathway reads.Apply to this programme therisk.globalAll programmes of GCRI Canada

Governance, policy and convening

Global Risks Forum (GRF)

Tracks that convene public authorities, researchers and institutions on the governance of shared risks.

Governance NexusExamines institutional capability and accountability.Join this track globalriskforum.comAll tracks of The Global Risks Forum

Capital, finance and markets

Global Risks Alliance (GRA)

Industry programmes in which financial institutions build a shared understanding of systemic risk.

Development Finance NexusWorks on country programme readiness.Join this programme globalriskalliance.comAll programmes of The Global Risks Alliance
22Istilahi kuu

Istilahi kuu

UNI
Unique Nexus Identifier: a persistent identifier that resolves an artefact to its record.
inapendekezwa
A draft in the open development process that the Global Standards Council has not yet adopted. Each area profile is a proposal to the Nexus Standards registry.
adopt
Relation in which the external standard is used as published and values are validated against it.
crosswalk
Relation in which clauses of these standards are mapped to parts of the external standard by clause number, without reproducing its text.
change record
A public record of a proposed change under NS-13, decided by the editors with written reasons.
attestation
An evaluator’s recorded result for one clause and one subject under NS-11.
liaison sought
A liaison the working group intends to request from the issuing body; a liaison is established only when the body confirms it in writing.
24Utafiti

Recent research and sources

Peer-reviewed articles, preprints, reports and datasets on the subject of this area, retrieved at the time of reading from open scholarly metadata services (OpenAlex and Crossref) and listed with authors, venue, year, type and access status, with a link to each work. Curated references and related standards are listed first; recent works matched by subject follow and are listed for orientation.

Curated references

Related standards and frameworks

Search terms, derived from the title and scope of the area: systemic risk; risk governance; global risks. With JavaScript enabled, recent works matching these terms are listed from OpenAlex and Crossref.

25Maswali

Questions and answers.

What is the status of the For institutional communities area?
The area profile is a proposal to the Nexus Standards registry; the area is not yet in the catalogue. Standards are adopted by the Global Standards Council after last call; in each country, adoption is a decision of its National Standards Council (NSC).
How are data sources presented?
Each data source is listed with its provider, licence, update frequency and delivery path, and links to the provider’s own publication.
How can this brief be amended?
Through a public change record under NS-13: a proposed amendment to the area profile or the registry, decided by the editors with written reasons.
RipotiChangia

Changia ushahidi kutoka ukurasa huu.

Reports ni chapisho la kila robo mwaka la Muungano. Unachojua kuhusu somo hili kinaweza kuwa ushahidi, kisa au sahihisho katika toleo lijalo, kikitajwa kwa jina lako na kuchapishwa chini ya CC BY 4.0 pale ambapo ni kazi yako mwenyewe.

Nexus Standards
Viwango

Contribute to For institutional communities

Institutions and experts are invited to propose amendments, join the working group or propose data sources. National participation is organised through each country’s National Nexus Consortium (NNC) and its National Working Groups (NWGs); competent national authorities are engaged through official channels.

Hali na matumizi. Nexus Standards ni viwango vinavyopendekezwa vilivyoandaliwa kupitia mchakato wazi chini ya NS-13 na kuchapishwa kwa matumizi ya hiari; si uthibitisho, uidhinishaji wala idhini ya kidhibiti, na upitishaji unabaki kuwa uamuzi wa Baraza la Viwango la Dunia na, katika kila nchi, wa Baraza lake la Viwango la Kitaifa. UNI (Unique Nexus Identifier) hutambua kitu; haikithibitishi. Majina ya vyombo vya viwango na viwango vyao ni mali ya wasimamizi wake na yanatumika tu kutambua nyaraka; hakuna maandishi ya kiwango cha nje yanayonakiliwa hapa. Nexus Standards haihusiani na, haiidhinishwi wala haithibitishwi na chombo chochote cha viwango kilichotajwa hapa.

Leseni: CC BY 4.0 kwa matini ya viwango, rejista, miundo na data; Apache-2.0 kwa msimbo wa marejeo. Viwango vya nje hunukuliwa kwa jina, namba na kiungo chini ya leseni zake vyenyewe. Data, maktaba na fonti za wahusika wengine huhifadhi leseni zake: tazama Notisi za wahusika wengine.