Skip to content
StandardsEnergy and Critical InfrastructureHazard and threat families
Area · in the catalogue (planned)

Viwango vya hatari za kiteknolojia na za viwandani

Industrial accidents, infrastructure failures and hazardous-material releases are technological hazards whose consequences depend on design, maintenance, instrumentation and the natural hazards that can trigger them. This area of the Energy and Critical Infrastructure programme sets records for accident events, instrument and sensor data, asset condition and Natech triggers so that operators, regulators and responders learn from incidents using comparable records rather than narrative reports alone. Each artefact of the area carries a UNI (Unique Nexus Identifier).

Viwango vya hatari za kiteknolojia na za viwandani
What this area is built from: the Nexus Standards it applies, the open standards it names and the data and feeds it reads, then the areas its record couples it with (marked).Source: the Nexus Standards registry: the area record.
  • Nexus Standards: NS-0, NS-3, NS-9, NS-11.
  • Open standards: UNDRR-ISC Hazard Information Profiles; OGC SensorThings API; Semantic Sensor Network Ontology (SSN/SOSA); Common Alerting Protocol Version 1.2; PROV-O: The PROV Ontology.
  • Data and feeds: eMARS Major Accident Reporting System; PubChem compound, hazard and GHS classification records; OpenStreetMap planet and replication.
  • Couples with: Geophysical hazard; Chemical hazard; Critical infrastructure and critical entities; Cyber and digital.
Nexus Standards
4
NS-0, NS-3, NS-9
Open standards
5
named, never copied
Data and feeds
3
listed for reference
Couplings
4
with other areas
UNI
requested · allocation in progress
Hali
Proposedin the catalogue · planned · scope NET
Last reviewed
area profile
Cite this page

Nexus Standards (2026). Technological and industrial hazard standards: area brief, Energy and Critical Infrastructure programme. Proposed. https://nexustandards.com/energy-infrastructure/technological-hazard-standards/. Last reviewed 17 October 2026.

Download the profile

Files include the credits and the licence statement and are generated in the browser; no data is transmitted. Downloads require JavaScript.

02Wigo

Scope and boundaries

An area of the Energy and Critical Infrastructure programme (hazard and threat families). The area profile sets out 5 matters in scope and 3 matters addressed by other areas.

In scope 5

  • Major accident event records with causes and consequences
  • Instrument and sensor records with calibration lineage
  • Asset condition and inspection records
  • Natech trigger records linking natural hazard events to industrial impacts
  • Lessons-learned records with NS-11 attestations

Out of scope 3

  • Process safety engineering design
  • Occupational health and safety rules
  • Product liability

Jurisdictions Application in each jurisdiction is a national decision, taken by the National Standards Council (NSC) with the competent national authorities.

03Hazard cascades

Cascading and compounding hazard pathways

Each hazard named for this context, as classified in the Nexus Hazard Standard (NHS-1), with the hazards it triggers, amplifies or compounds, the confidence of each relation, the physical or social mechanism, and the next step in the cascade.

The interactive view requires JavaScript; the sections below present the same records.

04Mchakato

From detection to evidence

An observation from eMARS Major Accident Reporting System becomes an identified hazard event; a forecast and a warning cite the same event and version; a trigger written as a clause starts anticipatory action for explosions and fires; response and losses are recorded; evidence reaches Sendai Monitor D-1 and the areas coupled to this one. 9 operations in 5 phases, built from the area profile: the rows carry its own data sources, indicators, open standards, couplings and, where listed, hazards, and each operation names the rules it implements (13). Records and artefacts are cited by UNI (Unique Nexus Identifier) and version.

Kichunguzi cha michakato · Standards · ratibu na sahihisha

Mzunguko wa maisha wa kiwango

Hatua 17Awamu 6

Standards · ratibu na sahihisha

Mzunguko wa maisha wa kiwango

Mzunguko wa maisha wa kiwango · Njia ya NS-13 · Njia za michango · Njia ya IETF · Njia ya W3C · Njia ya OGC · Njia ya OASIS · Hatua za ISO na IEC · Ulinganifu · Mzunguko wa maisha wa rekodi · Uelekezaji · Ufuatiliaji.

Matokeo ya mzunguko huwa mapendekezo ya mabadiliko, Baraza la Viwango la Dunia hupitisha baada ya mwito wa mwisho wa umma, na kila nchi huamua upitishaji wake.

  1. 01 Elekeza misheni

    1. 01Route missions to standards and profilesStep · Nexus StandardsNexus Standards routes each candidate mission to the standards and profiles that apply.
  2. 02 Wasifu na ulinganifu

    1. 02Kusanya wasifu wa misheniHatua · Nexus StandardsNexus Standards hukusanya wasifu wa misheni na hurekodi upitishaji wowote wa kitaifa ambao misheni hutegemea.
    2. 03Thibitisha matokeo ya ujenzi dhidi ya wasifuHatua · Nexus StandardsNexus Standards huthibitisha matokeo ya ujenzi dhidi ya wasifu ulioundwa na kurekodi ushahidi.
    3. 04Fuatilia ulinganifu na urekodi ushahidi uliofungwaHatua · Nexus StandardsWakati wa Wiki ya Utekelezaji Nexus Standards hufuatilia ulinganifu na kurekodi mikengeuko.
  3. 03 Mapendekezo na mapitio

    1. 05Mikengeuko na marekebisho huwa mapendekezo ya mabadilikoHatua · Nexus StandardsMikengeuko huwa mapendekezo ya mabadiliko, na marekebisho hurekodiwa kama mabadiliko kwa ushahidi.
    2. 06Matokeo ya mzunguko huwa mapendekezo ya mabadilikoHatua · Nexus StandardsMatokeo ya mzunguko huwa mapendekezo ya mabadiliko: matokeo ya mbinu na masahihisho kutoka Ripoti (F06) na vipengele vya orodha kutoka Nexus…
    3. 07Andaa na urekebishe hadharaniHatua · Kamati na vikundi kaziKamati za kiufundi na vikundi kazi huandaa rasimu na kurekebisha viwango katika mchakato wazi wa NS-13.
    4. 08Pitia kuelekea uamuzi wa barazaHatua · Nexus StandardsNexus Standards huendeleza mapendekezo ya mabadiliko kupitia mapitio kuelekea uamuzi wa baraza.
  4. 04 Uamuzi wa Baraza

    1. 09Mwito wa mwisho wa ummaHatua · Baraza la Viwango la KimataifaBaraza la Viwango la Kimataifa hupitisha kwa wingi wa theluthi mbili baada ya mwito wa mwisho wa siku tisini.
    2. 10Kupitishwa kwa kiwango dunianiUamuzi · Global Standards CouncilBaraza la Viwango la Dunia huamua upitishaji wa kila kiwango baada ya mwito wa mwisho wa umma.
  5. 05 Chapisha na utambulishe

    1. 11Assign a UNI and publishStep · Secretariat (GCRI Canada)Nexus Standards assigns UNIs and deposits publications under the publisher’s process.
    2. 12UNI hutambulisha na kamwe haitoi chetiRekodi · Nexus StandardsKila kitu cha mwaka wa programu kina kitambulisho kimoja, UNI chini ya NS-1, ili kiweze kutajwa, kupewa matoleo na kutatuliwa.
    3. 13Chapisha mabadiliko yaliyopitishwa ya mwakaHatua · Nexus StandardsWakati wa upyaishaji Nexus Standards huchapisha mabadiliko yaliyopitishwa ya mwaka na hali ya upitishaji wa kitaifa.
  6. 06 Kupitishwa na kutumika kitaifa

    1. 14Kupitishwa kitaifa na Baraza la Viwango la KitaifaUamuzi · Baraza la Viwango la KitaifaBaraza la Viwango la Kitaifa la kila nchi huamua upitishaji wa kitaifa: kupitisha kama ilivyo, kupitisha kwa wasifu (NS-16), kurekebisha, au kurejelea tu.
    2. 15Viwango vilivyopitishwa hufikia kozi na matoleoHatua · Nexus StandardsKila kiwango au wasifu uliopitishwa huwa moduli ya kozi katika Risk Academy (F09), na viwango hutumika katika matoleo ya Reports (R1).
    3. 16Upitishaji ni wa mwisho kwa kila mamlaka ya kisheriaKiwango · Baraza la Kitaifa la ViwangoUpitishaji ni wa mwisho kwa kila mamlaka ya kisheria, na GSC haina kura ya turufu juu ya uamuzi wa kitaifa. Hakuna chombo cha kimataifa chenye kura ya turufu.
    4. 17Rekodi za kupitishwa kitaifaRekodi · Nexus StandardsWasifu wa misheni ulioundwa na rekodi za upitishaji wa kitaifa huenda kwa Foundry wakati wa maandalizi ya utayari (F08).

Nexus Standards · Nexus Standards (institution) · National Standards CouncilAn outline of the designed programme cycle, not a record of operation: no cycle has run and every programme is at service level R0. Every Nexus Standard is at the PROPOSED stage and nexustandards.com governs the text and status of each one. A UNI identifies and never certifies; a validator report is evidence for review, not a conformance claim.

The operations, as a table
Process · from detection to evidence9 operations · 5 phases
StepPhaseOperationWhoDecision ruleRecordImplements
01DetectionObserve (start). The observation is recorded with its station or sensor metadata and source release. Data sources of this area: eMARS Major Accident Reporting System, PubChem compound, hazard and GHS classification records and OpenStreetMap planet and replication.the provider of the observationeach observation is a record with its source release and versionobservation records from eMARS Major Accident Reporting System, each with a record UNI (NS-3)NS1-R2, NS2-R1
02DetectionHazard event (record). The event receives an identifier that forecasts, warnings, triggers and losses cite, so that each can be traced to the same event. Hazards in scope: Explosions and fires, Structural collapse, Hazardous material releases, Dam failure and Transport accidents with dangerous goods.the competent hazard serviceone event identifier, cited by every forecast, warning and loss recorda hazard event record for explosions and fires, classified by the hazard information profilesNS1-R1
03Forecast and warningForecast (model). Ensemble forecasts carry lead time and verification statistics, which determine how reliable a trigger can be.the forecasting centrea forecast cites the event and its own version; verification statistics are recordeda forecast record from PubChem compound, hazard and GHS classification records with lead time and versionNS2-R2, NS12-R2
04Forecast and warningWarning (record). The warning is issued by the authority designated under national law and carries the identifiers of the event and forecast it rests on.the designated alerting authoritythe warning cites the event identifier and forecast versionan impact-based warning in Common Alerting Protocol Version 1.2NS2-R1
05Anticipatory actionTrigger clause (gate). The threshold, lead time and forecast source are stated in advance; an evaluation with missing inputs is indeterminate, never a trigger.the anticipatory action partners, under a pre-agreed protocolthe trigger is a clause whose predicate is data; two evaluators reach the same resulta trigger written as a clause (NS-10) for explosions and firesNS10-R1, NS10-R3, NS11-R3
06Anticipatory actionEarly action (step). Actions agreed in advance are taken before the peak impact. Sectors concerned: Industry and manufacturing, Energy utilities and grids, Transport, logistics and supply chains and Public sector and government.public agencies and humanitarian partnersfunds and actions are released on the attested triggerpre-agreed actions released, with the attestation of the triggerNS11-R1
07MwitikioResponse and loss (record). Damage and loss are recorded against the event, so that warnings, actions and impacts can be compared.the national disaster management agencylosses cite the event identifierimpact and loss records disaggregated as reporting requiresNS2-R4
08UshahidiReport D-1 (end). Reporting draws on the recorded events, warnings and losses. Indicators of this area: Sendai Monitor D-1 (Damage to critical infrastructure attributed to disasters) and SDG 12.4.1 (Number of parties to international multilateral environmental agreements on hazardous waste and other chemicals).the national reporting focal pointthe indicator is computed from records and cites themSendai Monitor D-1 (Damage to critical infrastructure attributed to disasters)NS11-R5, NS14-R1
09UshahidiCoupled areas (end). Cascade (Natech): earthquakes and tsunamis trigger releases and fires at industrial sites. Coupled areas: Geophysical hazard standards, Chemical hazard standards, Critical infrastructure and critical entities and Cyber and digital risk standards.the programmes of the coupled areasshared events are cited, never copiedrecords shared with Geophysical hazard standardsNS0-P9

Table.Operations in walking order; each row names the phase, the operation, its actor, its decision rule, the record it leaves and the rule identifiers it implements. The table shows the process as specified; it does not report the status of any standard, proposal or record. Sources: UNDRR-ISC Hazard Information Profiles · OGC SensorThings API · NS-0: Constitution and principles · NS-3: Risk record UNIs.

05Data sources

Data sources

3 data sources named in the area profile, each with provider, licence, update frequency and delivery path.

Data sources

Data sources are listed for reference; live data is displayed once licence review is complete.

Hai
0
on completion of licence review
Listed in the data register
1
licence terms recorded
Proposed for the register
2
licence terms to be recorded
Delivery
1 governed service · 0 plugin · 0 browser · 1 snapshot · 1 listed for reference
proposed paths in order of preference: governed data service, plugin, direct browser read, build-time snapshot; sources whose terms do not permit reuse are listed for reference only
  • OpenStreetMap planet and replicationfor reference

    OpenStreetMap Foundation and contributors · minutely

    ODbL-1.0

    governed data servicelisted in the data register.

  • eMARS Major Accident Reporting Systemfor reference

    European Commission JRC (Major Accident Hazards Bureau) · event-driven.

    European Commission reuse policy; licence to be recorded by Legal.

    listed for referenceproposed for the data register.

  • PubChem compound, hazard and GHS classification recordsfor reference.

    U.S. National Library of Medicine (NCBI) · continuous.

    Public domain for NCBI content; per-source terms for contributed data.

    build-time snapshotproposed for the data register

06System model

How a shock travels through this system

A system model of this area built from the registry: 8 hazards, 5 systems, 4 sectors, 10 controls, 3 feeds, 2 indicators. Select the components to include, choose an initiating hazard and run the scenario. Stress propagates through the hazard relations of the Nexus Hazard Standard (NHS-1), the exposure of each system, the recorded couplings and the sectors that carry the loss; adopted standards dampen transmission and live data sources support detection. All parameters are stated assumptions that the reader can adjust; results are illustrative scenario outputs for exercises and training, not forecasts or risk assessments. The Map view places the same run on an example geography, Europe, the region of the programme’s context map, with open data: country boundaries, a grid of hexagonal cells and NASA satellite layers for the initiating hazard. The geography serves exercises and training and is not an assessment of that place.

Majanga

  • Dam failure
  • Air transport accident
  • River flood (set off downstream)
  • Flash flood (set off downstream)
  • Mass displacement (set off downstream)
  • Widespread power outage (set off downstream)
  • Water supply shortfall (set off downstream)
  • Emergency-response overload (set off downstream)

Controls

  • NS-0 Katiba na kanuni
  • NS-3 UNI za rekodi za hatari (sarufi, ulinganishi wa urithi, mamlaka ya ugawaji)
  • NS-9 UNI za kimuktadha (utekelezaji, matukio, matukio ya programu)
  • NS-11 Uthibitishaji na ufuatiliaji (ushahidi, uthibitisho, uchunguzi wa ulinganifu usio na imani)
  • NRS-H62 Familia ya majanga: Matukio mchanganyiko na ya majanga mengi (NHS-1 sys.compound)
  • NRS-H33 Familia ya majanga: Mionzi ya ioni na nyenzo za nyuklia (NHS-1 poll.radiological)
  • NRS-H50 Familia ya majanga: Ajali za viwandani na za michakato (NHS-1 infra.industrial)
  • NRS-H54 Familia ya majanga: Usumbufu wa ishara na majukwaa (NHS-1 cyber.platform)
  • NRS-H89 Familia ya majanga: Kukatizwa kwa mtandao wa usafiri (NHS-1 infra.mobility)
  • NRS-H92 Familia ya majanga: Miundombinu iliyozeeka na kuharibika (NHS-1 infra.ageing)

Observation

  • eMARS Major Accident Reporting System (listed for reference)
  • PubChem compound, hazard and GHS classification records (listed for reference)
  • OpenStreetMap planet and replication (listed for reference)
  • Damage to critical infrastructure attributed to disasters
  • Number of parties to international multilateral environmental agreements on hazardous waste and other chemicals

Example geography

  • Europe: 113 hexagonal cells
  • Night lights tonight, outages (VIIRS Day/Night Band), NASA GIBS
  • Surface water through cloud, 30 m (OPERA DSWx-S1 radar), NASA GIBS
  • Rain rate, last half hour (IMERG), NASA GIBS
  • Surface soil moisture (SMAP), NASA GIBS
07Hazards and sectors

Hazards, threats and sectors concerned

Hazards and threats 5

Explosions and firesStructural collapseHazardous material releasesDam failureTransport accidents with dangerous goods

Sekta 4

Viwanda na utengenezajiMamlaka za nishati na gridiUsafirishaji, vifaa na minyororo ya ugaviSekta ya umma na serikali
08Miunganiko ya kimfumo

Miunganiko ya kimfumo

4 couplings link this area to other areas and programmes, each with the mechanism of the link.

  1. Geophysical hazard standardsHazards and Disaster Risk ReductionCascade (Natech): earthquakes and tsunamis trigger releases and fires at industrial sites.
  2. Chemical hazard standardsHazards and Disaster Risk ReductionShared events: chemical releases are both technological accidents and chemical hazards.
  3. Critical infrastructure and critical entitiesEnergy and Critical InfrastructureCascade: failure of one facility propagates through dependent networks.
  4. Cyber and digital risk standardsDigital, Cyber and AICommon driver: compromise of industrial control systems can cause physical accidents.
10Restricted standards

Restricted compatibility profiles

2 standards whose text is not openly available, named and linked only. Any compatibility profile is kept on protected pages until an arrangement with the issuing body is in place.

11Viashiria

Viashiria

The area profile names 2 indicators, each with its framework and code.

12Viwango

Standards that apply

The area profile lists 4 Nexus Standards; the registry lists NS-0, NS-3, NS-9, NS-11 for this area. Each is a proposed standard under development.

  1. 01

    NS-0 · Constitution and principles

    Status: proposed · 12 requirements stated. Read NS-0 · Requirements for this area.

  2. 02

    NS-3 · Risk record UNIs (grammar, legacy crosswalk, allocation authority)

    Status: proposed · 0 requirements stated. Read NS-3 · Requirements for this area.

  3. 03

    NS-9 · Contextual UNIs (deployments, instances, programme instances)

    Status: proposed · 5 requirements stated. Read NS-9 · Requirements for this area.

  4. 04

    NS-11 · Verification and monitoring (evidence, attestations, zero-trust conformance observation)

    Status: proposed · 6 requirements stated. Read NS-11 · Requirements for this area.

14Utayari

Evidence, recognition and capital pathways

What each institution of the ecosystem draws from this area: The Global Centre for Risk and Innovation (GCRI Canada), as Secretariat, for evidence; The Global Risks Forum (GRF) for recognition; and The Global Risks Alliance (GRA) for capital.

Evidence pathway

GCRI Canada

GCRI Canada may accept accident and sensor records with calibration and causal analysis method as research evidence; the decision rests with GCRI Canada under its own evidence and research rules.

Read the evidence pathway

Njia ya utambuzi

Global Risks Forum (GRF)

GRF may record operators publishing lessons-learned records on the shared profile as a dialogue item; the decision rests with GRF under its own recognition rules.

Read the recognition pathway

Njia ya mtaji

Global Risks Alliance (GRA)

GRA may read asset-condition and Natech exposure records when it reviews industrial project risk; the decision rests with GRA under its own capital-readiness rules.

Read the capital pathway

Each institution determines under its own rules what it accepts as evidence; a pathway reading is neither an approval nor investment advice.

15Kikundi kazi

Working group charter

A proposed charter for this area, open to institutions and experts.

Wigo

Accident, sensor and Natech records with causal analysis and calibration lineage.

Institutions and experts are invited to charter this working group under NS-13 by filing a public change record. National Working Groups (NWGs) contribute national inputs and field exercises through their National Nexus Consortium (NNC).

Deliverables · 3
  1. Major accident record profile
  2. Natech trigger record linking hazard and facility
  3. Sensor calibration lineage profile
Liaison targets · 4
  • OECD Working Party on Chemical Accidents liaison sought
  • European Commission JRC Major Accident Hazards Bureau liaison sought
  • UNECE Industrial Accidents Convention secretariat liaison sought
  • UNEP/OCHA Joint Environment Unit liaison sought
16Research questions

Open research questions

3 questions identified as priorities for the working group.

  1. Accident reporting is voluntary or confidential in many countries, so databases are incomplete and biased towards severe events.
  2. Causal taxonomies differ between regulators, which limits cross-country learning.
  3. Natech risk assessment lacks standard fragility data for industrial equipment.
17Hadhira

Intended users

The area profile identifies 4 user communities.

  1. Process safety managers
  2. Industrial regulators
  3. Emergency responders
  4. Asset managers
18Registry

Registry listing and depth pages

This area is in the catalogue (status: planned; scope NET; 3 crosswalk domains). It has five depth pages and a register crosswalk of its domains.

Crosswalk graph · technological and industrial hazardNexus Standards registry
Technological and industrial hazard: crosswalk to external standards66 nodes on four orbits (Nexus Standards and implementing repositories at the centre, then domains, external standards and issuing bodies), joined by 84 recorded relations.
Nexus StandardsDomainsExternal standardsIssuing bodiesImplementing repositories
The crosswalk as a table: 36 external standards by domain
DomainExternal standardIssuing bodyRelation
Miundombinu muhimuDirective 2012/18/EU on the control of major-accident…European Parliament and Councilcite
Miundombinu muhimuICAO Annex 19 Safety ManagementInternational Civil Aviation Organizationcite
Miundombinu muhimuIEC 61508 Functional safety of electrical, electronic and…IEC TC 65crosswalk
Miundombinu muhimuIEC 61511 Functional safety – Safety instrumented systems…IEC TC 65crosswalk
Miundombinu muhimuIEC 62443 series Security for industrial automation and…IEC TC 65 with ISA (ISA/IEC 62443)cite
Miundombinu muhimuIEEE 1588 Precision Clock Synchronization Protocol for…IEEEcite
Miundombinu muhimuInternational Safety Management (ISM) CodeInternational Maritime Organizationcite
Miundombinu muhimuISO 10218 Robotics – Safety requirements for industrial…ISO/TC 299cite
Miundombinu muhimuISO 13482:2014 Robots and robotic devices – Safety…ISO/TC 299cite
Miundombinu muhimuISO 19650 Organisation and digitisation of information…ISO/TC 59/SC 13cite
Miundombinu muhimuISO 37120:2018 Sustainable cities and communities…ISO/TC 268crosswalk
Miundombinu muhimuISO 37123:2019 Sustainable cities and communities…ISO/TC 268crosswalk
Miundombinu muhimuISO 55000:2024 Asset management – Vocabulary, overview and…ISO/TC 251cite
Miundombinu muhimuITU Radio RegulationsITU-Rcite
Miundombinu muhimuITU-T G.8271 Time and phase synchronisation aspects of…ITU-T SG15cite
NishatiIEC 61850 Communication networks and systems for power…IEC TC 57cite
NishatiIEC 62351 Power systems management and associated…IEC TC 57cite
NishatiISO 50001:2018 Energy management systems – Requirements…ISO/TC 301crosswalk
NishatiISO/IEC 30134 Data centres – Key performance indicatorsISO/IEC JTC 1/SC 39crosswalk
NishatiNERC Critical Infrastructure Protection (CIP) Reliability…North American Electric Reliability Corporationcite
Security and cyberCommon Vulnerability Scoring System v4.0FIRST CVSS Special Interest Groupcite
Security and cyberFIPS 203 Module-Lattice-Based Key-Encapsulation Mechanism…NISTadopt
Security and cyberFIPS 204 Module-Lattice-Based Digital Signature StandardNISTadopt
Security and cyberFIPS 205 Stateless Hash-Based Digital Signature StandardNISTadopt
Security and cyberIAEA Safety Standards (nuclear, radiation, transport and…International Atomic Energy Agencycite
Security and cyberISO/IEC 27001:2022 Information security, cybersecurity and…ISO/IEC JTC 1/SC 27crosswalk
Security and cyberISO/IEC 27005:2022 Guidance on managing information…ISO/IEC JTC 1/SC 27cite
Security and cyberISO/IEC 27701:2025 Privacy information management systemsISO/IEC JTC 1/SC 27cite
Security and cyberNIST Cybersecurity Framework (CSF) 2.0 (NIST CSWP 29)NISTcrosswalk
Security and cyberNIST Open Security Controls Assessment Language (OSCAL)NISTadopt
Security and cyberNIST SP 800-37 Rev. 2 Risk Management Framework for…NISTcite
Security and cyberNIST SP 800-53 Rev. 5 Security and Privacy Controls for…NISTcrosswalk
Security and cyberOASIS STIX Version 2.1 (Structured Threat Information…OASIS Cyber Threat Intelligence TCcite
Security and cyberOASIS TAXII Version 2.1 (Trusted Automated Exchange of…OASIS Cyber Threat Intelligence TCcite
Security and cyberRFC 8032 Edwards-Curve Digital Signature Algorithm (EdDSA)IETFadopt
Security and cyberUnited Nations Global Counter-Terrorism StrategyUnited Nations General Assemblycite

Nexus Standards in the graph: NS-0, NS-3, NS-9, NS-11. A relation is a register entry, never a compliance claim.

4 Nexus Standards · 3 domains · 36 external standards · 23 issuing bodies · 0 implementing repositories. Relations (adopt, profile, crosswalk, cite) are as recorded in the register; names and standards remain with their stewards.

Crosswalk graph66 nodes and 84 links from the registry of external standards, programme areas and implementations (the external standards register, the consumers register. Relations (adopt, profile, crosswalk, cite) are shown as recorded in the register.

Areas carry no geography of their own; the map shows where the bodies that issue the area’s external standards are based.

Standards globe · Technological and industrial hazard: issuing bodiesNexus Standards registry
Seats of the bodies that issue the external standards in the registerA world map with coastlines and equal-area cells at the public seats of 19 issuing bodies and one dot per seat. 36 register entries.
Issuing bodies’ seats (19)Equal-area cells (7); darker, more register entriesProgrammes, repositories and standards: not mapped
Issuing bodies and their seats (19)
BodySeatRegister entries
NISTGaithersburg, Maryland, United States7
ISO/IEC JTC 1/SC 27Geneva, Switzerland3
IEC TC 57Geneva, Switzerland2
IEC TC 65Geneva, Switzerland2
ISO/TC 268Geneva, Switzerland2
ISO/TC 299Geneva, Switzerland2
OASIS Cyber Threat Intelligence TCWoburn, Massachusetts, United States2
European Parliament and CouncilBrussels, Belgium1
FIRST CVSS Special Interest GroupCary, North Carolina, United States1
IEC TC 65 with ISA (ISA/IEC 62443)Geneva, Switzerland1
IEEEPiscataway, New Jersey, United States1
IETFWilmington, Delaware, United States1
ISO/IEC JTC 1/SC 39Geneva, Switzerland1
ISO/TC 251Geneva, Switzerland1
ISO/TC 301Geneva, Switzerland1
ISO/TC 59/SC 13Geneva, Switzerland1
ITU-RGeneva, Switzerland1
ITU-T SG15Geneva, Switzerland1
North American Electric Reliability CorporationAtlanta, Georgia, United States1

Issuing bodies are shown at the city of their public seat. The 1 programmes, 0 implementing repositories and 19 Nexus Standards have no location and are not mapped · 4 issuing bodies have no single public seat and are listed without a location: International Atomic Energy Agency; International Civil Aviation Organization; International Maritime Organization; United Nations General Assembly.

Standards globe19 issuing bodies with a public seat and 36 register entries, shown in equal-area cells at four levels of detail. Seats are placed at city coordinates; programme areas, implementations and standards have no location and are not drawn. A still world map is shown where scripts are unavailable.

Area on institutional sitesArtefact kindsGoverning standardsPages
Critical infrastructure (GCRI Canada field gateway; GRF and GRA counterparts)data, dataset, report, map, documentationNS-1, NS-3, NS-3b, NS-4, NS-5therisk.global/fields/infrastructure/
Industry and robotics (GCRI Canada field gateway; GRF and GRA counterparts)data, dataset, report, map, documentationNS-1, NS-3, NS-3b, NS-4, NS-5therisk.global/fields/industry/

From the ecosystem coverage register: material that GCRI Canada, The Global Risks Forum (GRF) and The Global Risks Alliance (GRA) publish on this area, as stated by each institution.

19Vyanzo

Vyanzo

3 references from peer-reviewed and official publications cited in the area profile, linked at the publishers’ own sites.

20Research hub

Recent research on this area

Recent peer-reviewed articles, preprints, datasets and reports on the subject of this area, retrieved at the time of reading from open scholarly metadata services (OpenAlex, Crossref, DataCite, Zenodo, arXiv, Europe PMC, OpenAIRE Graph) with search terms composed from the registry. Each work is listed with its authors, venue, year, type, open-access status and licence, and links to its DOI or landing page. Sources not yet enabled for live display on this site are listed for reference and are not queried.

Search termsexplosions; fires; structural collapse; hazardous material releases; dam failure; transport accidents with dangerous goods; UNDRR-ISC Hazard Information Profiles; OGC SensorThings APIcombined with: risk; hazard; early warning; resilience; vulnerability; impact; exposureDerived from the title of the area and the hazards in its profile, the NHS-1 hazards it names and the open standards it lists.

  • OpenAlexlisted for reference; not queried
  • Crossreflisted for reference; not queried
  • DataCitelisted for reference; not queried
  • Zenodolisted for reference; not queried
  • arXivlisted for reference; not queried
  • Europe PMClisted for reference; not queried
  • OpenAIRE Graphlisted for reference; not queried

No source is enabled for live display on this site yet: the sources are listed for reference and none is queried. Once the publisher of record enables a source after its terms are reviewed, recent works are listed here. Metadata and links only: title, authors, venue, year, type, open-access status and licence as each source records them; works are listed for orientation, not reviewed or endorsed.

22Katika mtandao mzima

Programmes, tracks and courses for this area

GCRI Canada, The Global Risks Forum (GRF), The Global Risks Alliance (GRA) and Risk Academy work on the subject of this area in distinct roles (research and evidence; governance, policy and convening; capital, finance and markets; education and training). Each entry states why it corresponds and the step it offers; each institution sets its own terms of participation.

Governance, policy and convening

Global Risks Forum (GRF)

Tracks that convene public authorities, researchers and institutions on the governance of shared risks.

Disaster and Crisis GovernanceExamines disaster authority, mandates and coordination for industrial emergencies.Join this track globalriskforum.comAll tracks of The Global Risks Forum

Capital, finance and markets

Global Risks Alliance (GRA)

Industry programmes in which financial institutions build a shared understanding of systemic risk.

Insurance NexusExamines property and casualty underwriting for industrial and natural-technological losses.Join this programme globalriskalliance.comAll programmes of The Global Risks Alliance
23Istilahi kuu

Istilahi kuu

UNI
Unique Nexus Identifier: a persistent identifier that resolves an artefact to its record.
inapendekezwa
A draft in the open development process that the Global Standards Council has not yet adopted. Each area profile is a proposal to the Nexus Standards registry.
adopt
Relation in which the external standard is used as published and values are validated against it.
compatibility profile (restricted)
Relation to a standard whose text is not openly available: the standard is named and linked only, and any compatibility profile is kept on protected pages.
change record
A public record of a proposed change under NS-13, decided by the editors with written reasons.
attestation
An evaluator’s recorded result for one clause and one subject under NS-11.
liaison sought
A liaison the working group intends to request from the issuing body; a liaison is established only when the body confirms it in writing.
25Utafiti

Recent research and sources

Peer-reviewed articles, preprints, reports and datasets on the subject of this area, retrieved at the time of reading from open scholarly metadata services (OpenAlex and Crossref) and listed with authors, venue, year, type and access status, with a link to each work. Curated references and related standards are listed first; recent works matched by subject follow and are listed for orientation.

Curated references

Related standards and frameworks

Search terms, derived from the title of the area and the hazards in its profile: explosions; fires; structural collapse; hazardous material releases; dam failure; transport accidents with dangerous goods; combined with: risk; hazard; early warning; resilience; vulnerability; impact; exposure. With JavaScript enabled, recent works matching these terms are listed from OpenAlex and Crossref.

26Maswali

Questions and answers.

What is the status of the Technological and industrial hazard standards area?
The area profile is a proposal to the Nexus Standards registry, and the area is in the catalogue. Standards are adopted by the Global Standards Council after last call; in each country, adoption is a decision of its National Standards Council (NSC).
How are data sources presented?
Each data source is listed with its provider, licence, update frequency and delivery path, and links to the provider’s own publication.
How can this brief be amended?
Through a public change record under NS-13: a proposed amendment to the area profile or the registry, decided by the editors with written reasons.
RipotiChangia

Changia ushahidi kutoka ukurasa huu.

Reports ni chapisho la kila robo mwaka la Muungano. Unachojua kuhusu somo hili kinaweza kuwa ushahidi, kisa au sahihisho katika toleo lijalo, kikitajwa kwa jina lako na kuchapishwa chini ya CC BY 4.0 pale ambapo ni kazi yako mwenyewe.

Nexus Standards
Viwango

Contribute to Technological and industrial hazard standards

Institutions and experts are invited to propose amendments, join the working group or propose data sources. National participation is organised through each country’s National Nexus Consortium (NNC) and its National Working Groups (NWGs); competent national authorities are engaged through official channels.

Hali na matumizi. Nexus Standards ni viwango vinavyopendekezwa vilivyoandaliwa kupitia mchakato wazi chini ya NS-13 na kuchapishwa kwa matumizi ya hiari; si uthibitisho, uidhinishaji wala idhini ya kidhibiti, na upitishaji unabaki kuwa uamuzi wa Baraza la Viwango la Dunia na, katika kila nchi, wa Baraza lake la Viwango la Kitaifa. UNI (Unique Nexus Identifier) hutambua kitu; haikithibitishi. Majina ya vyombo vya viwango na viwango vyao ni mali ya wasimamizi wake na yanatumika tu kutambua nyaraka; hakuna maandishi ya kiwango cha nje yanayonakiliwa hapa. Nexus Standards haihusiani na, haiidhinishwi wala haithibitishwi na chombo chochote cha viwango kilichotajwa hapa.

Leseni: CC BY 4.0 kwa matini ya viwango, rejista, miundo na data; Apache-2.0 kwa msimbo wa marejeo. Viwango vya nje hunukuliwa kwa jina, namba na kiungo chini ya leseni zake vyenyewe. Data, maktaba na fonti za wahusika wengine huhifadhi leseni zake: tazama Notisi za wahusika wengine.